Home / Browse projects / Thane, Maharashtra / THARWANI STELLA PHASE 1

Registered No litigation declared Residential / Group Housing project

THARWANI STELLA PHASE 1

By M/S THARWANI REALTORS

RG-MH-93312 · RERA P51700054439 · Last updated on MahaRERA portal: 3 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

THARWANI STELLA PHASE 1 is a Residential / Group Housing project by M/S THARWANI REALTORS in Thane, Maharashtra, registered with MahaRERA as P51700054439 on 25 Jan 2024. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameTHARWANI STELLA PHASE 1
  • TypeResidential / Group Housing
  • Location
    • DESAI VILLAGE
    • Thane (M Corp.)
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700054439
  • ReraGenie IDRG-MH-93312

Builder

  • NameM/S THARWANI REALTORS
  • Entity typePartnership
  • PartnersANIL HARDASMAL THARWANI, DHIREN ANIL THARWANI, ABHISHEK ANIL THARWANI
  • Other registrations1 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredJan 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AQUILA - Building No 2NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

AQUILA - Building No 2: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership45

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners45
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2025
LandownerVillageDistrict
CHANDRAKANT MHATREThane (M Corp.)Thane
Ganesh Dattu MhatreThane (M Corp.)Thane
Sharad MhatreThane (M Corp.)Thane
Kashinath MhatreThane (M Corp.)Thane
Amit MhatreThane (M Corp.)Thane
VILAS MHATREThane (M Corp.)Thane
SHATRUGAN MHATREThane (M Corp.)Thane
SHASHIKANT MHATREThane (M Corp.)Thane
SHILPA MHATREThane (M Corp.)Thane
NANDA MHATREThane (M Corp.)Thane
PRAVIN MHATREThane (M Corp.)Thane
UJJWAL BHOIRThane (M Corp.)Thane
Aarti DesleThane (M Corp.)Thane
Baban PAtilThane (M Corp.)Thane
Nakul MhatreThane (M Corp.)Thane
RAMESH MHATREThane (M Corp.)Thane
KANTABAI MHATREThane (M Corp.)Thane
SHARDA PATILThane (M Corp.)Thane
SHAKUNTALA SAWANTThane (M Corp.)Thane
VASANT MHATREThane (M Corp.)Thane
KALURAM MHATREThane (M Corp.)Thane
ROSHAN MHATREThane (M Corp.)Thane
NAVANATH MHATREThane (M Corp.)Thane
INDUBAI MHATREThane (M Corp.)Thane
SHUSHMA MHATREThane (M Corp.)Thane
SHAKTI MHATREThane (M Corp.)Thane
ARUNA PATILThane (M Corp.)Thane
RAKESH MHATREThane (M Corp.)Thane
INDRABAI MHATREThane (M Corp.)Thane
YOGESH MHATREThane (M Corp.)Thane
DHIRAJ MHATREThane (M Corp.)Thane
BALARAM MHATREThane (M Corp.)Thane
USHA MHATREThane (M Corp.)Thane
LAXMAN MHATREThane (M Corp.)Thane
LATA MHATREThane (M Corp.)Thane
BHARAT MHATREThane (M Corp.)Thane
DEVRAJ MHATREThane (M Corp.)Thane
KAILASH MHATREThane (M Corp.)Thane
CHHAYA GODHALIThane (M Corp.)Thane
SHAAM MHATREThane (M Corp.)Thane
RESHMA DHONDLEThane (M Corp.)Thane
VAALMIK MHATREThane (M Corp.)Thane
JANMANJAY MHATREThane (M Corp.)Thane
VAISHALI RAMDAS PATILThane (M Corp.)Thane
RAMCHANDRA MHATREThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPOATION
Permissible FSI28342.46
Proposed, not sanctioned11,426 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHADAKPADA BRANCH, KALYAN-DOMBIVLI-421301

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect10 FOLDS ARCHITECTS AND CONSULTANTS
EngineerKIRAN SHARAD WARE
Chartered AccountantSUNNY BHAGIA AND ASSOCIATES
Chartered AccountantVINOD SANTOSHKUMAR DHANKANI
PartnerRole in project
M/S THARWANI REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Final Form 5 _Tharwani Stella Phase I_2024 25.pdf3 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Stella Phase 1 _31-12-2024.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stella Phase 1.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned_Final Form 3 Stella Phase 1 Dec-24.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Stella Phase 1_Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Stella Phase 1_Sept 2024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Stella Phase 1 _Sept 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_Stella Phase I_Sep 2024.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Stella Ph 1_June 2024.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL SCANNED FORM 3.pdf23 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: THARWANI REALTORS STELLA PHASE -1.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 STELLA PHASE - I.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Stella Phase I.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Stella Phase I.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Stella Phase I_March 2024.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: STELLA PHASE 1 FORM 1.pdf20 May 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (3).pdf10 Jan 2024
Building plan approvalFile: Ground and First Floor.pdf31 Aug 2023
Building plan approvalFile: Typical Floor.pdf31 Aug 2023
Building plan approvalFile: Refugee Floor.pdf31 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground and First Floor.pdf31 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor.pdf31 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Refugee Floor.pdf31 Aug 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (3).pdf4 Aug 2023
Layout approvalFile: Layout plan.pdf3 Aug 2023
Building plan approvalFile: Index.pdf3 Aug 2023
Details of encumbrances concerned to FinanceFile: Financial encumbrances.pdf3 Aug 2023
Details of encumbrances concerned to LegalFile: Financial encumbrances.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout plan.pdf3 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Index.pdf3 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 07_STELLA PHASE I_COMMENCE CERTIFICATE.pdf3 Aug 2023
Declaration in FORM BFile: 12_Declaration in Form B.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_Architect's Certificate_Form I_Stella Phase I.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14_Engineer's Cert_Form2_Stella Phase I.pdf2 Aug 2023
CERSAI detailsFile: Cersai declaration.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Stella Phase I_Revised_09102023.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22a_Annexure A - Anil Tharwani.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22b_Annexure A - Dhiren Tharwani.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22c_Annexure A - Abhishek Tharwani.pdf2 Aug 2023
Proforma of Allotment letterFile: 30_PROFORMA ALLOTMENT LETTER_STELLA_PHASE I.pdf2 Aug 2023
Proforma of Agreement for saleFile: AFS Stella.pdf2 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration.pdf2 Aug 2023
Deviation Report with respect to Allotment letterFile: 40_DEVIATION REPORT WITH RESPECT TO ALLOMENT LETTER I.pdf2 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report.pdf2 Aug 2023
Details of encumbrances concerned to FinanceFile: 04_Non Encumbrance Certificate_Legal Phase I.pdf15 Feb 2023
Details of encumbrances concerned to LegalFile: 04_Non Encumbrance Certificate_Legal Phase I.pdf15 Feb 2023
Declaration about Commencement CertificateFile: 11_DECLARATION ABOUT COMMENCEMENT CERTIFICATE PHASE I.pdf15 Feb 2023
PAN CardFile: 01_Tharwani Realtors_PAN Card.pdf13 Oct 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
THARWANI ARIANA PHASE IIISURVEY NO 133 1 AND 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATH240CompletedApr 2022Late, Jun 2022
THARWANI SOLITAIRE PHASEIIITHARWANI SOLITAIRE KALYAN MURBAD ROAD MHARAL TALUKA KALYAN DIST THANE60CompletedDec 2019Late, Sep 2022
THARWANI SOLITAIRE PHASE IITHARWANI SOLITAIRE KALYAN MURBAD ROAD MHARAL TALUKA KALYAN DIST THANE 421301238CompletedDec 2019Oct 2019
THARWANI ARIANA PHASE 1SURVEY NO 133 1 AND 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATH238CompletedDec 2019Dec 2016
THARWANI SOLITAIRE PHASE ITHARWANI SOLITAIRE KALYAN MURBAD ROAD MHARAL TALUKA KALYAN DIST. THANE 421301196CompletedDec 2017Late, May 2018
THARWANI ARIANA PHASE IISURVEY NO 133 1 AND 133P VILLAGE CHIKHLOLI TALUKA AMBERNATH84CompletedSep 2017Apr 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THARWANI STELLA PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DESAI VILLAGE7,600+ in Thane

Builder: M/S THARWANI REALTORS

M/S THARWANI REALTORS has 2 registrations on MahaRERA, including THARWANI STELLA PHASE 1 and THARWANI STELLA PHASE II. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THARWANI STELLA PHASE 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THARWANI STELLA PHASE 1?

The registered promoter entity is M/S THARWANI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THARWANI STELLA PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THARWANI STELLA PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THARWANI STELLA PHASE 1?

The professionals named in the filing: Architect: 10 FOLDS ARCHITECTS AND CONSULTANTS; Engineer: KIRAN SHARAD WARE; Chartered Accountant: SUNNY BHAGIA AND ASSOCIATES; Chartered Accountant: VINOD SANTOSHKUMAR DHANKANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THARWANI STELLA PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THARWANI STELLA PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THARWANI STELLA PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.