Home / Browse projects / TECHNO INDUSTRIAL HUB
TECHNO INDUSTRIAL HUB
By A-99 REALTY
RG-MH-06963 · RERA P99000054414 · Last updated on MahaRERA portal: 8 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TECHNO INDUSTRIAL HUB is a Mixed project by A-99 REALTY in -, 401208, registered with MahaRERA as P99000054414 on 19 Jan 2024. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 52 of the 64 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameTECHNO INDUSTRIAL HUB
- TypeMixed
- Location
- -
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000054414
- ReraGenie IDRG-MH-06963
Builder
- NameA-99 REALTY
- Entity typePartnership
- PartnersMUSTAQEEM MOHAMMED HANIF SUNASARA, ABDULLAH MUSTAQEEM SUNASARA, SABA SAFIK SUNASARA, SUMAIYA NAIM SUNASARA, MUSBASHIRA TOUFIK KADIWALA, MOHAMMED HUSEN YAQOOB BALSANIYA, HAJRA ABDUL DAYLA, AFRAH SHABBIR DAYLA, SAHEDA ASHRAF ATHANIA, ALIYA ABDUL BAMAD DAYALA, SARFRAJ ABDUL DAYLA, SAFIK AHMED DAYALA and 1 more
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Jan 2024
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 8 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TECHNO INDUSTRIAL HUB BUILDING NO 1 PLOT NO 2 INDUSTRIAL | NA | 3 | 3 | 0 | 64 | 64 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
TECHNO INDUSTRIAL HUB BUILDING NO 1 PLOT NO 2 INDUSTRIAL: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed161
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TECHNO INDUSTRIAL HUB BUILDING NO 1 PLOT NO 2 INDUSTRIAL | NA | Rs 20.70 cr | Rs 20.44 cr |
| - | NA | Rs 40.00 lakh | Rs 11.74 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIPUL M ADHIA ADHIA |
| Engineer | sufyan sunasara sadiq sunasara |
| Engineer | IRFAN SHAIKH |
| Chartered Accountant | NIKHITA M SHAH SHAH |
| Chartered Accountant | UMANG DEDHIA |
| Partner | Role in project |
|---|---|
| A-99 REALTY | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoteras per application enclosed
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration and undertaking (Annexure A)File: sold booked inventory 31-12-25.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: form1 Q3 25-26 05-01-26.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2 Q3 25-26 06-01-26.PDF | 8 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 Q3 25-26 07-01-2026.pdf | 8 Jan 2026 |
| Declaration and undertaking (Annexure A)File: sold booked inventory 30-09-25.pdf | 3 Jan 2026 |
| Withdrawal Update Form 1File: form1 Q2 25-26 30-09-25.pdf | 3 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2 Q2 25-26 07-10-25.PDF | 3 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 A99 Realty 30-12-25.pdf | 3 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24 31-03-24.pdf | 29 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25 31-03-2025.pdf | 29 Dec 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 SCAN 310324.pdf | 19 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 A-99 Realty 24-25.pdf | 19 Dec 2025 |
| Withdrawal Update Form 1File: Form1 Q1 25-26 30-06-25 .pdf | 9 Sep 2025 |
| Withdrawal Update Form 2File: FORM-2 Q1 25-26 12-07-25.pdf | 9 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 Q1 25-26 09-09-25.pdf | 9 Sep 2025 |
| Form 1File: FORM 1 Q1 30-06-24.pdf | 20 Jun 2025 |
| Form 2File: Form 2 Q1 30-06-24.pdf | 20 Jun 2025 |
| Form 3File: FORM 3 Q1 30-06-24.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold booked inventory 30-06-24.pdf | 20 Jun 2025 |
| Form 1File: Form 1 Q2 30-09-24.pdf | 20 Jun 2025 |
| Form 2File: Form 2 Q2 30-09-24.pdf | 20 Jun 2025 |
| Form 3File: FORM 3 Q2 30-09-24.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold booked inventory 30-09-24.pdf | 20 Jun 2025 |
| Form 1File: FORM 1 Q3 31-12-24.pdf | 20 Jun 2025 |
| Form 2File: Form 2 Q3 31-12-24.pdf | 20 Jun 2025 |
| Form 3File: FORM 3 Q3 31-12-2024.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold booked inventory 31-12-24.pdf | 20 Jun 2025 |
| Form 1File: form 1 Q4 31-03-25.pdf | 20 Jun 2025 |
| Form 2File: Form 2 Q4 31-03-25.pdf | 20 Jun 2025 |
| Form 3File: FORM 3 Q4 31-03-25.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold booked inventory 31-03-25.pdf | 20 Jun 2025 |
| Form 1File: form 1 scan 31-03-24.PDF | 18 Jun 2025 |
| Form 2File: form 2 scan 31-03-24.PDF | 18 Jun 2025 |
| Form 3File: Form 3 scan 310324.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold booked inventory 31-03-24.pdf | 18 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 scan 31-03-24.PDF | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 scan 31-03-24.PDF | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 31.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SCAN 310324.pdf | 8 Oct 2024 |
| Proforma of Agreement for saleFile: Final RERA AFS legal A99R 19 dec 23.pdf | 28 Feb 2024 |
| Proforma of Agreement for saleFile: d agr.pdf | 9 Jan 2024 |
| Layout approvalFile: layout undertaking.pdf | 29 Nov 2023 |
| Layout approvalFile: 241 SN ferfar.pdf | 29 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: non encrumbrance - finance.pdf | 29 Nov 2023 |
| Details of encumbrances concerned to LegalFile: non encrumbrance - finance.pdf | 29 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: layout undertaking.pdf | 29 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 241 SN ferfar.pdf | 29 Nov 2023 |
| CERSAI detailsFile: cersai undertaking.pdf | 4 Nov 2023 |
| Copy of the legal title reportFile: legal title report latest final.pdf | 31 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (1) A-99 industry building.pdf | 31 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 31 Oct 2023 |
| Layout approvalFile: layout (1)_compressed_compressed.pdf | 30 Oct 2023 |
| Building plan approvalFile: BUILDING PLAN_compressed_compressed.pdf | 30 Oct 2023 |
| PAN CardFile: Pan Card.pdf | 30 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: encrumbrance legal.pdf | 30 Oct 2023 |
| Details of encumbrances concerned to LegalFile: encrumbrance legal.pdf | 30 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: layout (1)_compressed_compressed.pdf | 30 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_compressed_compressed.pdf | 30 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: revised CC.pdf | 30 Oct 2023 |
| Declaration about Commencement CertificateFile: CC declaration.pdf | 30 Oct 2023 |
| Declaration in FORM BFile: Form B 29-11-23.PDF | 30 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DO iSaheda.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Aamena.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Abdullah.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Afrah.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Aliya.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Hazra.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi husain.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Mushbashira.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Mustaqeem.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Saba.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Safiq.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Sarafaraz.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOi Sumaiya.pdf | 30 Oct 2023 |
| Proforma of Allotment letterFile: Proforma allotment Letter.pdf | 30 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration.pdf | 30 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTEMENT.pdf | 30 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation AFS 19 dec 2023.pdf | 30 Oct 2023 |
| Other - LegalFile: conveyance compress 1.pdf | 30 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TECHNO INDUSTRIAL HUB on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
Builder: A-99 REALTY
A-99 REALTY has 1 registration on MahaRERA, including TECHNO INDUSTRIAL HUB. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if TECHNO INDUSTRIAL HUB is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TECHNO INDUSTRIAL HUB?
The registered promoter entity is A-99 REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TECHNO INDUSTRIAL HUB?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TECHNO INDUSTRIAL HUB?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TECHNO INDUSTRIAL HUB?
The professionals named in the filing: Architect: VIPUL M ADHIA ADHIA; Engineer: sufyan sunasara sadiq sunasara; Engineer: IRFAN SHAIKH; Chartered Accountant: NIKHITA M SHAH SHAH; Chartered Accountant: UMANG DEDHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TECHNO INDUSTRIAL HUB?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback