TANIA WILLOWS

By TANIA REALTORS

RG-MH-89716 · RERA P99000081082 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 75%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

TANIA WILLOWS is a Others project by TANIA REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000081082 on 7 Jan 2026. Possession is promised by 31 Mar 2028.

At a glance

Project

  • NameTANIA WILLOWS
  • TypeOthers
  • Location
    • GOKHIWARE
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000081082
  • ReraGenie IDRG-MH-89716

Builder

  • NameTANIA REALTORS
  • Entity typePartnership

Key dates

this monthRegisteredJan 2026PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jan 2026
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 13, A-WING, SECTOR VNA77000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 75%.

BUILDING NO 13, A-WING, SECTOR V: 23% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Open Space47

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area253 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
MANVEL PASCAL KULASVasai-Virar City (M Corp)Palghar
ANIL RAMCHANDRA GUPTAVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI1831.23
Proposed, not sanctioned1,831 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1, LOTUS APT, SHRIPASTHA COMPLEX, NALLASOPARA WEST, TALUKA VASAI, DIST PALGHAR, PIN 401203

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTA MEHTA & ASSOCIATES
EngineerSS AND ASSOCIATES
Chartered AccountantSTR & ASSOCIATES
Chartered AccountantACG & Associates
PartnerRole in project
TANIA REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Sep 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FY_2025-26.pdf27 Jun 2026
Form 5 (FY 2025-2026)File: FORM 5_TANIA WILLOWS FY 2025-26-SIGNED.pdf18 Jun 2026
Form 1File: FORM 1.pdf30 May 2026
Form 2File: FORM 2.pdf30 May 2026
Form 3File: FORM 3_TANIA REALTORS-SIGNED.pdf30 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY.pdf30 May 2026
Other - LegalFile: Queries Raised TANIA WILLOWS.pdf16 Dec 2025
Other - LegalFile: TANIA WILLOWS RERA CLARIFICATION LETTER .pdf16 Dec 2025
Other - LegalFile: Declaration about Name on CC Revised.pdf2 Dec 2025
Other - LegalFile: Confirmation on FSI signed.pdf12 Nov 2025
Other - LegalFile: Index 2_Anil Gupta_SNO 85 10.pdf12 Nov 2025
Other - LegalFile: Conveyance Deed in favour of Anil Gupta_Compressed.pdf12 Nov 2025
Other - LegalFile: Confirmation of Ownership of SNo 85 HNo 10 Revised.pdf10 Nov 2025
Copy of the legal title reportFile: Legal Title AND Report Survey 8510 revised GP Pai 1.pdf28 Sep 2025
Other - TechnicalFile: Revised Appendix F Tania Willows.pdf28 Sep 2025
Other - TechnicalFile: VVCMC-TP-RDP-VP 672.pdf28 Sep 2025
Other - TechnicalFile: 4 Undertaking annex A order 50(1) doc.pdf28 Sep 2025
Other - LegalFile: Deed of Exchange_5564-2022_6.pdf11 Aug 2025
Other - LegalFile: Deed of Exchange_5564-2022_5.pdf11 Aug 2025
Other - LegalFile: Deed of Exchange_5564-2022_4.pdf11 Aug 2025
Other - LegalFile: Deed of Exchange_5564-2022_2.pdf11 Aug 2025
Other - LegalFile: Deed of Exchange_5564-2022_1.pdf11 Aug 2025
Other - LegalFile: Deed of Exchange_5564-2022_3.pdf11 Aug 2025
Other - TechnicalFile: Architect letter for confirmation of Appenix F.pdf11 Aug 2025
Other - LegalFile: Deed of Exchange betwn sai rydham and manvel pascal-61-76.pdf27 Jun 2025
Other - LegalFile: Deed of Exchange betwn sai rydham and manvel pascal-41-60.pdf27 Jun 2025
Other - LegalFile: Deed of Exchange betwn sai rydham and manvel pascal-21-40.pdf27 Jun 2025
Other - LegalFile: Deed of Exchange betwn sai rydham and manvel pascal-1-20.pdf27 Jun 2025
Layout approvalFile: LAYOUT_SECTOR V_VP329-241 29 07 22 HL - converted.pdf26 Jun 2025
Copy of Layout Approval (in case of layout)File: LAYOUT_SECTOR V_VP329-241 29 07 22 HL - converted.pdf26 Jun 2025
Other - LegalFile: POA_ BY LO TO TANIA REALTORS_2.pdf12 May 2025
Other - LegalFile: POA_ BY LO TO TANIA REALTORS_1.pdf12 May 2025
Other - LegalFile: 7-12 EXTRACT.pdf12 May 2025
Other - TechnicalFile: cc verification email revised.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 duo signed.pdf23 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RERA format B- Bank SIGNED.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft form I Bldg 13 wing A Sec V.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tania Realtors-signed.pdf15 Apr 2025
Other - LegalFile: 2 Consent Letter dated 22062022-highlighted.pdf15 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A on pro LH signed.pdf15 Apr 2025
Other - TechnicalFile: Declaration about Name on CC Revised.pdf15 Apr 2025
Other - TechnicalFile: 4 Undertaking annex A order 50(1) doc.pdf15 Apr 2025
Other - TechnicalFile: 2 Consent Letter dated 22062022-highlighted.pdf15 Apr 2025
Other - TechnicalFile: APPENDIX F SIGNED AND ACKNOWLEDGED.pdf15 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of finance on project doc.pdf15 Apr 2025
Layout approvalFile: BLOCK PLAN SECTOR V_VP329-241-29 07 22 HL.pdf14 Apr 2025
Building plan approvalFile: PLAN(1 OF 2).pdf14 Apr 2025
Building plan approvalFile: PLAN(2 OF 2).pdf14 Apr 2025
Details of encumbrances concerned to FinanceFile: DECLARATION FOR FINANCE ENCUMBRANCES.pdf14 Apr 2025
Details of encumbrances concerned to FinanceFile: DECLARATION FOR LEGAL ENCUNBRANCES.pdf14 Apr 2025
Copy of Layout Approval (in case of layout)File: BLOCK PLAN SECTOR V_VP329-241-29 07 22 HL.pdf14 Apr 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER ORDER60.pdf14 Apr 2025
Declaration in FORM BFile: 5 MAHARERA Form B (PROMOTER).pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: RDP 29 07 22 tania Willows - converted.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN(1 OF 2).pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN(2 OF 2).pdf14 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf14 Apr 2025
CERSAI detailsFile: SELF DECLARATION ABOUT CERSAI REPORT.pdf14 Apr 2025
Deviation Report with respect to Allotment letterFile: NO DEVIATION DECLARATION-ALLOTMENT LETTER.pdf14 Apr 2025
Details of encumbrances concerned to LegalFile: DECLARATION FOR LEGAL ENCUNBRANCES.pdf14 Apr 2025
Details of encumbrances concerned to LegalFile: DECLARATION FOR FINANCE ENCUMBRANCES.pdf14 Apr 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-SALE AGMT.pdf14 Apr 2025
Proforma of Agreement for saleFile: Model sale agreement_TANIA REALTORS.pdf14 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Mark.pdf14 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Francis.pdf14 Apr 2025
PAN CardFile: Tania Realtors PAN card.pdf8 Mar 2025

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TANIA WILLOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

Builder: TANIA REALTORS

TANIA REALTORS has 1 registration on MahaRERA, including TANIA WILLOWS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if TANIA WILLOWS is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TANIA WILLOWS?

The registered promoter entity is TANIA REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TANIA WILLOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TANIA WILLOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TANIA WILLOWS?

The professionals named in the filing: Architect: SANTA MEHTA & ASSOCIATES; Engineer: SS AND ASSOCIATES; Chartered Accountant: STR & ASSOCIATES; Chartered Accountant: ACG & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TANIA WILLOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TANIA WILLOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TANIA WILLOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.