Home / Browse projects / Palghar, Maharashtra / SYMPHONY HEIGHTS
SYMPHONY HEIGHTS
RG-MH-30604 · RERA P99000031884 · Last updated on MahaRERA portal: 14 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 2 months past the filed date
- Litigation declared, 1 case
- Completion date moved by 17 months
- 2 extensions taken
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SYMPHONY HEIGHTS is a Residential / Group Housing project by Kreate Space LLP in Palghar, Maharashtra, registered with MahaRERA as P99000031884 on 22 Nov 2021. Possession was promised by 15 Aug 2026 and is now 2 months past that date. The completion date has moved by 17 months from the original filing. 53 of the 164 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSYMPHONY HEIGHTS
- TypeResidential / Group Housing
- Location
- Vevoor
- Palghar East
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000031884
- ReraGenie IDRG-MH-30604
Builder
- NameKreate Space LLP
- Entity typePartnership
- PartnersRamesh Hamirmal Bafna, Chomansingh Moolsingh Deora
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Nov 2021
- Promised completion15 Aug 2026
- Revised completionRevised to 15 Aug 2026 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 14 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Symphony Heights | NA | 10 | 10 | 136 | 28 | 164 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
Symphony Heights: 53% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed219
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Symphony Heights | NA | Rs 27.14 cr | Rs 19.53 cr |
| - | NA | Rs 2.09 cr | Rs 20.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Empire Architects |
| Engineer | Shah & Associates |
| Engineer | GANESH V HILE |
| Engineer | CENTRELINE CONSULTANTS & ENGINEERS |
| Chartered Accountant | Zenith M Jain & Co |
| Chartered Accountant | MUKESH H JAIN & CO |
| Partner | Role in project |
|---|---|
| Kreate Space LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. While registering the project with MahaRERA,we had underestimated the project completion time which proved to be less for such a project. 2. Still the project progress was on track but in between due to some issues with our labour contractor led to few months delay of works. 3. But rest assured,now the works are in full swing & will be completed with in the stipulated time lines of this extended date and OC will be obtained. 4. Also,we are uploading the PERTChart/work completion schedule of the project. 5. Hence,we request you to consider our request & justification & grant extension to our
Reason as filed by the promoter1. As CC has been revised & Total number of units have increased from 113 units to 164 units and sactioned builtup area have increased from 7555.62 SQ.MTR to 11149.40 Sq.Mtr. due to which we are applying for extension of project.Correction application for revised CC have been done and approved by Rera. 2. Also,we are uploading the PERTChart/work completion schedule of the project. 3. Hence,we request you to consider our request & justification & grant extension to our said project.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 45/2014/2014 | Civil Court Senior Division | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1.pdf | 14 Mar 2026 |
| Withdrawal Update Form 2File: Form_2 28_02_2026.pdf | 14 Mar 2026 |
| Withdrawal Update Form 3File: Form-3.pdf | 14 Mar 2026 |
| Form 1File: FOEM_1 31_3_2025.pdf | 21 Jan 2026 |
| Form 2File: Form_2 15_04_2025.pdf | 21 Jan 2026 |
| Form 3File: Form_3 31_3_25.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure 30_3_25.pdf | 21 Jan 2026 |
| Form 1File: FORM_1 31_12_24.pdf | 21 Jan 2026 |
| Form 2File: Form_2 31_12_24.pdf | 21 Jan 2026 |
| Form 3File: Form-3 31122024.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold 31122024.pdf | 21 Jan 2026 |
| Form 1File: FORM_1 30_9_24.pdf | 21 Jan 2026 |
| Form 2File: Form_2 30_09_24.pdf | 21 Jan 2026 |
| Form 3File: Form_3 30_9_24.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure 30_9_24.pdf | 21 Jan 2026 |
| Form 1File: FORM_1 30_6_24.pdf | 21 Jan 2026 |
| Form 2File: Form_2 30_6_24.pdf | 21 Jan 2026 |
| Form 3File: Form_3 30_6_24.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure 30_6_24.pdf | 21 Jan 2026 |
| Form 1File: FORM_1 31_3_24.pdf | 21 Jan 2026 |
| Form 2File: Form_2 31_03_24.pdf | 21 Jan 2026 |
| Form 3File: FORM_3 31_3_24.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure 30_3_24.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: FORM_1 30_6_25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: FORM_1 30_9_25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: FORM_1 31_12_25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form_2 08_07_2025.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form_2 1_10_25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form_2 17_01_26.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form-3 30062025.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form_3 30_9_25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form_3 31_12_25.pdf | 21 Jan 2026 |
| Form 2A (FY 2024-2025)File: FORM_2A 2024-25.pdf | 21 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 5 FY2023-24.pdf | 20 Jan 2026 |
| Form 2A (FY 2022-2023)File: Form2A 2022-23.pdf | 20 Jan 2026 |
| Form 2A (FY 2021-2022)File: Form 2A 2021-22.pdf | 20 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 FY2023-24.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form_5 24-25.pdf | 20 Jan 2026 |
| Form 5 (FY 2021-2022)File: Form 5 FY 2021-22.pdf | 20 Jan 2026 |
| Building plan approvalFile: SANCTION PLAN DRAWING (1).pdf | 23 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf | 18 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A FY 2022-23.pdf | 18 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A FY 2023-24.pdf | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY2023-24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -01 _SYMPHONY HEIGHTS.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1 new.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Symphony Heights Form-2 Revised to 55 as per architect certificate.pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Revised Declaration of Sold-Unsold.pdf | 17 Feb 2025 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 14 Feb 2025 |
| CERSAI detailsFile: Declaration.pdf | 14 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (1).pdf | 14 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real EstateOrganizations.pdf | 14 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interestin Other Real Estate Organizations.pdf | 14 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Chomansingh Deora.pdf | 14 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf | 7 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE QU.pdf | 7 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf | 7 Oct 2022 |
| Copy of the legal title reportFile: Rera Search Report_compressed_compressed.pdf | 16 Nov 2021 |
| Details of encumbrancesFile: encumberance letter.pdf | 16 Nov 2021 |
| Declaration in FORM BFile: Kreate Form-B.pdf | 25 Oct 2021 |
| Proforma of Allotment letterFile: Kreate Space Flat Agreement.pdf | 25 Oct 2021 |
| Proforma of Allotment letterFile: Declaration _ Allotment Letter.pdf | 25 Oct 2021 |
| Layout approvalFile: Layout.pdf | 3 Sep 2021 |
| Building plan approvalFile: Layout.pdf | 3 Sep 2021 |
| PAN CardFile: Kreate Space Pan Card.pdf | 3 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 3 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf | 3 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: cc_compressed.pdf | 3 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration About CC.pdf | 3 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 3 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SYMPHONY HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palghar East3,200+ in Palghar
Filed coordinates, straight-line distance. 293 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: Kreate Space LLP
Kreate Space LLP has 1 registration on MahaRERA, including SYMPHONY HEIGHTS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that SYMPHONY HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SYMPHONY HEIGHTS is delayed beyond 15 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SYMPHONY HEIGHTS?
The registered promoter entity is Kreate Space LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SYMPHONY HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SYMPHONY HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SYMPHONY HEIGHTS?
The professionals named in the filing: Architect: Empire Architects; Engineer: Shah & Associates; Engineer: GANESH V HILE; Engineer: CENTRELINE CONSULTANTS & ENGINEERS; Chartered Accountant: Zenith M Jain & Co; Chartered Accountant: MUKESH H JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SYMPHONY HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback