Home / Browse projects / Satara, Maharashtra / SWARA GARDEN

Registration lapsed No litigation declared Residential / Group Housing project

SWARA GARDEN

By SWARA CONSTRUCTION

RG-MH-14613 · RERA P52700023328 · Last updated on MahaRERA portal: 18 Feb 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

SWARA GARDEN is a Residential / Group Housing project by SWARA CONSTRUCTION in Satara, Maharashtra, registered with MahaRERA as P52700023328 on 12 Dec 2019. Possession was promised by 30 Dec 2022 and is now 46 months past that date.

At a glance

Project

  • NameSWARA GARDEN
  • TypeResidential / Group Housing
  • Location
    • SATARA RAOD
    • THAKURKI PHALTAN
    • Phaltan (M Cl)
    • Phaltan
    • Satara
    • 415523
  • Pincode415523
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700023328
  • ReraGenie IDRG-MH-14613

Builder

  • NameSWARA CONSTRUCTION
  • Entity typePartnership
  • PartnersJAGDISH RAMVILAS KARVA, MAYURI JAGDISH KARVA, KEDAR RAMVILAS KARWA, KIRTI KEDAR KARWA, KIRANKUMAR DNYANDEO NALE, RAJASHREE KIRANKUMAR NALE, BABAJI SALU KALE, PAVAN SHRINIVAS BHATTAD
  • Other registrations4 more →
  • Completed4 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

46 months past promisethis monthRegisteredDec 2019PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Dec 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWARA GARDEN PHASE ANA20000
SWARA GARDEN PHASE BNA20000
SWARA GARDEN PHASE CNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

SWARA GARDEN PHASE A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SWARA GARDEN PHASE B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SWARA GARDEN PHASE C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2134.02
Proposed, not sanctioned2,134 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOLIBAR MAIDAN PHALTAN

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL L NALAWADE
EngineerVIJAY SALUNKHE
EngineerSUNIL NIMBALKAR
Chartered AccountantNIKHIL BHOITE
PartnerRole in project
SWARA CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2023

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 20-21 SGABC.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 SGABC.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SGABC.pdf13 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SGABC_compressed.pdf13 Feb 2023
Proforma of Agreement for saleFile: Sale agreement SG.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC arch SG A.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC arch SG B.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC arch SG C.pdf13 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment SJ.pdf13 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AGS SJ.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Swara Construction.pdf10 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC SG ABC.pdf10 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Complete SG A B C.pdf6 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Building Permission SG.pdf19 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate SG New.pdf19 Nov 2019
Proforma of Allotment letterFile: Allotment.pdf25 Oct 2019
OtherFile: POA SC.pdf25 Oct 2019
OtherFile: Sale agreement SG.pdf24 Oct 2019
Layout approvalFile: Sanction Plan SG.pdf14 Oct 2019
Building plan approvalFile: Sanction Plan SG.pdf14 Oct 2019
PAN CardFile: SC Pan Card.pdf14 Oct 2019
Copy of the legal title reportFile: Search Report SG.pdf14 Oct 2019
Details of encumbrancesFile: Non-Encumbrance SG.pdf14 Oct 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan SG.pdf14 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan SG.pdf14 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: Building Permission SG.pdf14 Oct 2019
Declaration in FORM BFile: Form B SG.pdf14 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SG.pdf14 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate SG.pdf14 Oct 2019
Proforma of Allotment letterFile: Draft Agrrement SG.pdf14 Oct 2019

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SWARA GARDEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THAKURKI PHALTAN1,100+ in Satara

2 kmSWARA GARDENCompleted 15Lapsed / revoked 21Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: SWARA CONSTRUCTION

SWARA CONSTRUCTION has 5 registrations on MahaRERA, including SWARA YAMUNA PLAZA and SWARA GARDEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that SWARA GARDEN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SWARA GARDEN is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWARA GARDEN?

The registered promoter entity is SWARA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWARA GARDEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWARA GARDEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWARA GARDEN?

The professionals named in the filing: Architect: RAHUL L NALAWADE; Engineer: VIJAY SALUNKHE; Engineer: SUNIL NIMBALKAR; Chartered Accountant: NIKHIL BHOITE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWARA GARDEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWARA GARDEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWARA GARDEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.