Home / Browse projects / Sindhudurg, Maharashtra / Swami Samarth Nagar Survey No. 133 Hissa No. 3
Swami Samarth Nagar Survey No. 133 Hissa No. 3
RG-MH-48453 · RERA P52900049565 · Last updated on MahaRERA portal: 20 Oct 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 19 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Swami Samarth Nagar Survey No. 133 Hissa No. 3 is a Mixed project by Ranco Realty Pvt Ltd in Sindhudurg, Maharashtra, registered with MahaRERA as P52900049565 on 15 Feb 2023. Possession is promised by 31 Mar 2028. 0 of the 1 unit on this registration is recorded sold or booked, and 17 of 99 construction stages are filed complete.
At a glance
Project
- NameSwami Samarth Nagar Survey No. 133 Hissa No. 3
- TypeMixed
- Location
- Sawantwadi Vengurla Road
- Sawantwadi railway station
- Malgaon
- Sawantwadi
- Sindhudurg
- 416510
- Pincode416510
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900049565
- ReraGenie IDRG-MH-48453
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2023
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings9 building records
- Documents filed34 files
Current status
Figures as on 20 Oct 2023, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Plot no 3 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 4 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 5 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 7 | NA | 2 | 0 | 0 | 0 | 0 |
| Plot no 8 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 9 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 10 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 11 | NA | 1 | 0 | 0 | 0 | 0 |
| Plot no 12 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building10
As on 20 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 99 construction stages are filed complete across 10 buildings. The stage furthest along is Excavation, at 0%.
Plot no 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 455%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 80%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Plot no 100%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 110%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Plot no 120%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ranco Realty Pvt Ltd | Greater Mumbai (M Corp.) (Part) (802794) | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rupesh Narayan Tawate |
| Engineer | Rupesh Narayan Tawate |
| Chartered Accountant | Yogesh C Shirsat |
| Partner | Role in project |
|---|---|
| Ranco Realty Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed34
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 - swami 133 3.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 4 Oct 2023 |
| Building plan approval or NA orderFile: 12 plot bifurcation and total area (1).pdf | 8 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 12 plot bifurcation and total area (1).pdf | 8 Feb 2023 |
| Building plan approval or NA orderFile: highlighted builtup area.pdf | 7 Feb 2023 |
| Layout approvalFile: layout approval.pdf | 7 Feb 2023 |
| Layout approvalFile: layout approval 1.pdf | 7 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: layout approval.pdf | 7 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: layout approval 1.pdf | 7 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: highlighted builtup area.pdf | 7 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 7 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC GR.pdf | 7 Feb 2023 |
| Other - FinanceFile: Financial Encumbrances.pdf | 27 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: deviation report for allotment letter.pdf | 25 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation AFS upload_compressed.pdf | 25 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement Draft.pdf | 24 Jan 2023 |
| Other - TechnicalFile: Engineer Certificate.pdf | 23 Jan 2023 |
| Declaration in FORM BFile: Form B swami samarth nagar.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA SWAMI SAMARTH NAGAR-1 (1).pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA SWAMI SAMARTH NAGAR-2.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA SWAMI SAMARTH NAGAR-3.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA SWAMI SAMARTH NAGAR-4.pdf | 21 Jan 2023 |
| Building plan approval or NA orderFile: bhandkam permission1.pdf | 18 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: bhandkam permission1.pdf | 18 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest real estate project-annexture A.pdf | 16 Jan 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 14 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrance legal finance.pdf | 14 Dec 2022 |
| Details of encumbrances concerned to LegalFile: encumbrance legal finance.pdf | 14 Dec 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencement.pdf | 7 Dec 2022 |
| Copy of the legal title reportFile: Legal title report.pdf | 17 Nov 2022 |
| PAN CardFile: Ranco Realty Pan card.pdf | 14 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer certificate.pdf | 14 Nov 2022 |
| CERSAI detailsFile: Sarsai.pdf | 14 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1_3.pdf | 14 Nov 2022 |
Promoter's earlier projects19
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Swami Samarth Nagar 7 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Feb 2017 |
| Swami Samarth Nagar 5 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Jan 2017 |
| Swami Samarth Nagar 3 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Feb 2017 |
| Swami Samarth Nagar 22 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Feb 2017 |
| Swami Samarth Nagar 21 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Feb 2017 |
| Swami Samarth Nagar 20 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Jan 2017 |
| Swami Samarth Nagar 2 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Mar 2017 |
| Swami Samarth Nagar 19 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Feb 2017 |
| Swami Samarth Nagar 18 B | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Aug 2016 |
| Swami Samarth Nagar 18 A | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Aug 2016 |
| Swami Samarth Nagar 17 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Feb 2017 |
| Swami Samarth Nagar 16 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Jan 2017 |
| Swami Samarth Nagar 15 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | - | Completed | Feb 2018 | Sep 2015 |
| Swami Samarth Nagar 14 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Sep 2016 |
| Swami Samarth Nagar 12 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Mar 2017 |
| Swami Samarth Nagar 11 B | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Dec 2016 |
| Swami Samarth Nagar 11 A | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Nov 2016 |
| Swami Samarth Nagar 1 | at post malagaon taluka sawantadi district sindhudurg pincode-416510 behin annapurna khanawal | 1 | Completed | Feb 2018 | Dec 2016 |
| Mohor | mohor at nirawade taluka sawantwadi district sindhudurg pincode 416510 towards tulas vengurla road from sawantwadi railway station 1 km | 13 | Completed | Dec 2017 | Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 34 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Swami Samarth Nagar Survey No. 133 Hissa No. on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sawantwadi railway station530+ in Sindhudurg
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
perto de goa phase R 1
ANKIT VASTU CREATIONS PRIVATE LIMITED
ASHTVINAYAK GRUHSANKUL
MR PANKAJ ROHIDAS NARVEKAR
SAWANTWADI ENCLAVE
LANDKRAFT SPACES PRIVATE LIMITED
APNA GHAR
VYANKATESH VASANT DESHPANDE
Riviera Suites
Home and Soul Developers Private Limited
HERITAGE HOMES
HERITAGE REALTORS
See every Sindhudurg project, with the district possession charts
Builder: Ranco Realty Pvt Ltd
Ranco Realty Pvt Ltd has 7 registrations on MahaRERA, including Bapusaheb Nadkarni Nagar and Swami Samarth Nagar. Its filings disclose 19 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if Swami Samarth Nagar Survey No. 133 Hissa No. 3 is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Swami Samarth Nagar Survey No. 133 Hissa No. 3?
The registered promoter entity is Ranco Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Swami Samarth Nagar Survey No. 133 Hissa No. 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Swami Samarth Nagar Survey No. 133 Hissa No. 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Swami Samarth Nagar Survey No. 133 Hissa No. 3?
The professionals named in the filing: Architect: Rupesh Narayan Tawate; Engineer: Rupesh Narayan Tawate; Chartered Accountant: Yogesh C Shirsat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Swami Samarth Nagar Survey No. 133 Hissa No. 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback