SUPRABHAT CLASSIC

By DENNIS JAMES FERNANDES

RG-MH-99072 · RERA P51800009781 · Last updated on MahaRERA portal: 30 Apr 2025

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA
  • Completion date moved by 96 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 63%
8Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

SUPRABHAT CLASSIC is a Residential / Group Housing project by DENNIS JAMES FERNANDES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009781 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 96 months from the original filing. 8 complaints are on record with the regulator.

At a glance

Project

  • NameSUPRABHAT CLASSIC
  • TypeResidential / Group Housing
  • Location
    • Shell Colony
    • Sahkar Nagar
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009781
  • ReraGenie IDRG-MH-99072

Builder

  • NameDENNIS JAMES FERNANDES
  • Entity typeIndividual
  • GSTIN27AAOPF1127B1Z8
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUPRABHAT CLASSICNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 63%.

SUPRABHAT CLASSIC: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure63%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises63%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.63%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.63%

Progress on shared amenities15

As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes63%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes63%
Storm Water DrainsYes63%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes63%
Electrical meter room, sub-station, receiving stationYes63%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area761 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
CHEMBUR SUPRABHAT CO OP HSG LTDKurlaMumbai Suburban

Approvals and building plan

Permissible FSI2544.65
Proposed, not sanctioned1,901 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch170/171, Anchorage Building, Central Avenue Road, Chembur, Mumbai-400071

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
DENNIS JAMES FERNANDES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001199Dec 2018 → Dec 2019

Reason as filed by the promoterPART Occupancy already applied and attached herewith. This is Redevelopment Project, Sale Component Clients and Original Tenants excluding 5 are ready to take possession as entire construction activity is completed and Building is ready for Possession. 5 Of Original Tenants are is dispute and moved to MHADA to file case against developer. However we are is opinion that Remaining Sale and Tenant Customer should not suffer because of dispute of 5 tenant clients . Hence we applied for PART OC. Once dispute is settled ,we will go for full OC and Conveyance Process

EXT51800009069Dec 2018 → Dec 2023

Reason as filed by the promoterThis is the Re-development project approved by MHADA and we are the Second Developer of the project and overtaken development activity of the said project after withdrawal of first developer. Currently I had completed 80% of the project development and also given possession to 97% to sale component customers till date. However original tenants of the project had gone into litigation and approached various forum including RERA, Consumer Court and Honb. Mumbai High Court. The litigation is pending on all these forums for final hearing. Due to said litigation MHADA - Plan Approving authority of t

EXT51800028244Dec 2018 → Dec 2026

Reason as filed by the promoterThe promoter is undertaking the construction of additional six floors in addition to existing 10 floors. The modifications required careful coordination with engineers, architects, and regulatory bodies to ensure that the structural integrity of the project remained uncompromised while adhering to quality and safety norms. Additionally, the integration of these additional floors requires adjustments in structural planning, procurement of materials, and execution timelines, all of which have contributed to the delay. Despite these challenges, the promoter remains fully committed to completing t

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000001939Dr Priya Bhosale JadhavDENNIS FERNANDES16/11/2017
CC006000000057815Anil Lakamashi Dedhia & OrsCityline Builders & Developers25/01/2019
CC006000000194857SHEELA S RAMBHIACITY LINE BUILDERS & DEVELOPERS10/11/2020
CC006000000194858HEMA MAHENDRA RAMBHIACITY LINE BUILDERS & DEVELOPERS10/11/2020
CC006000000199181SHEELA RAMBHIACITY LINE BUILDERS& DEVELOPERS29/11/2021
CC006000000199182HEMA MAHENDRA RAMBHIACITY LINE BUILDERS& DEVELOPERS29/11/2021
CC006000000220972DINESH MEGHJI LAKUMCITYLINE BUILDERS & DEVELOPERS29/04/2022
CC12503330Satyapal Bajranglal NirwanDENNIS JAMES FERNANDES17/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Concerned to Finance and Legal (1).pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Suprabahat Q4.pdf30 Apr 2025
Certificates of CA (Form 3)File: Q4 - Suprabhat Form 3_compressed.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: till 31-03-2025.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_31-03-2021.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Q4 Annexure B-Disclosure of Sold or Unsold Inventory (2).pdf30 Apr 2025
CERSAI detailsFile: Assets Based Declaration.pdf30 Apr 2025
CERSAI detailsFile: Assets Based Declaration.pdf30 Apr 2025
CERSAI detailsFile: Debtor Based Declaration (2).pdf30 Apr 2025
Details of encumbrances concerned to LegalFile: Non-Encumbrance Concerned to Finance and Legal (1).pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_31-03-2022.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31-03-2023.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_31-03-2024.pdf30 Apr 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf21 Apr 2025
Declaration in FORM BFile: FORM_B-Affidavit_on_Stamp_Paper_of_Rs_500.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Suprabahat (5).pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-03-2021 Form-2.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-03-2022 Form-2.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-03-2023 Form-2.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: till 31-03-2024.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: till 30-06-2024.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: till 30-09-2024.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: till 31-12-2024.pdf17 Apr 2025
Certificates of CA (Form 3)File: July 20 to March 21.pdf12 Apr 2025
Certificates of CA (Form 3)File: 21-22.pdf12 Apr 2025
Certificates of CA (Form 3)File: 22-23.pdf12 Apr 2025
Certificates of CA (Form 3)File: 23-24.pdf12 Apr 2025
Certificates of CA (Form 3)File: Q1.pdf12 Apr 2025
Certificates of CA (Form 3)File: Q2.pdf12 Apr 2025
Certificates of CA (Form 3)File: Q3.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 19-20.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 20-21.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Self Declaration for Form 2A (1).pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 21-22.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FY 22-23.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FY 23-24.pdf12 Apr 2025
Details of encumbrancesFile: Non-Encumbrance Concerned to Finance and Legal (1).pdf8 Apr 2025
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Concerned to Finance and Legal (1).pdf8 Apr 2025
Certificates of CA (Form 5)File: FY 19-20.pdf8 Apr 2025
Certificates of CA (Form 5)File: FY 20-21.pdf8 Apr 2025
Certificates of CA (Form 5)File: FY 21-22.pdf8 Apr 2025
Certificates of CA (Form 5)File: FY 22-23.pdf8 Apr 2025
Certificates of CA (Form 5)File: FY 23-24.pdf8 Apr 2025
Details of encumbrances concerned to LegalFile: Non-Encumbrance Concerned to Finance and Legal (1).pdf8 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations (2).pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory (2).pdf7 Apr 2025
CERSAI detailsFile: Assets Based Declaration.pdf7 Apr 2025
CERSAI detailsFile: Debtor Based Declaration.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory (2).pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory_compressed.pdf5 Jun 2021
Status of Formation of Legal EntityFile: Registration Certificate Suprabhat.pdf2 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Suprabhat.pdf22 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineer Certificate Suprabhat.pdf22 Sep 2020
Certificates of CA (Form 3)File: Form 3 Suprabhat 3132020.pdf22 Sep 2020
Certificates of CA (Form 3)File: Form 3 Suprabhat 3062020.pdf22 Sep 2020
Certificates of CA (Form 5)File: Form 5 Suprabhat 2019 20.pdf22 Sep 2020
OtherFile: CIVIL AVIATION NOC VALID UP TO - 04-09-2021.pdf16 Jul 2020
OtherFile: APPROVED EETC NOC.pdf16 Jul 2020
OtherFile: APPROVED CFO NOC DATED.pdf16 Jul 2020
Architect’s Certificate on Completion of Project (Form 4)File: BLDG_NO_-_1_RERA_CERTIFICATE.pdf15 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BLDG_NO_-_1_RERA_CERTIFICATE_Suprabhat.pdf4 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form_2A_Suprabhat_Dec_2019.pdf4 Feb 2020
Certificates of CA (Form 3)File: Form_3_Suprabhat_Dec_2019_compressed.pdf4 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5NSuprabhat 2018 2019.pdf19 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_CERTIFICATE_-_04-06-2019_Suprabhat_Q1_compressed.pdf20 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_CERTIFICATE_-_16-10-2019_Suprabhat_Q2_compressed.pdf20 Oct 2019
Certificates of CA (Form 3)File: Form_3_Suprabhat_June 2019.pdf20 Oct 2019
Certificates of CA (Form 3)File: Form_3_Suprabhat Sept 2019.pdf20 Oct 2019
Certificates of CA (Form 5)File: CITYLINE_FORM-5_FY 17-18_SUPRABHAT.pdf5 Jan 2019
OtherFile: resign letter for nitin gunjal 1.pdf24 Nov 2018
OtherFile: Unsold Inventory 02April18.pdf3 Apr 2018
OtherFile: Annexure A-Sold_Unsold inventory-26Mar2018.pdf2 Apr 2018
Building plan approvalFile: Suprabhat-Plan-copy-ilovepdf-compressed-1-1.pdf26 Mar 2018
Building plan approvalFile: Suprabhat-Plan-copy-ilovepdf-compressed-2-2.pdf26 Mar 2018
Building Plan Approval (IOD)File: Suprabhat-Plan-copy-ilovepdf-compressed-1-1.pdf26 Mar 2018
Building Plan Approval (IOD)File: Suprabhat-Plan-copy-ilovepdf-compressed-2-2.pdf26 Mar 2018
Status of Formation of Legal EntityFile: UNDERTAKING.pdf26 Mar 2018
OtherFile: Concession letter-BMC.pdf26 Mar 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf30 Jul 2017
Layout approvalFile: lay out.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 96 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUPRABHAT CLASSIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sahkar Nagar6,700+ in Mumbai Suburban

2 kmSUPRABHAT CLASSICCompleted 14Lapsed / revoked 17Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: DENNIS JAMES FERNANDES

DENNIS JAMES FERNANDES has 3 registrations on MahaRERA, including SUPRABHAT CLASSIC and SAILEELA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUPRABHAT CLASSIC is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUPRABHAT CLASSIC?

The registered promoter entity is DENNIS JAMES FERNANDES, an individual as per the filing. Its GSTIN 27AAOPF1127B1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUPRABHAT CLASSIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SUPRABHAT CLASSIC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SUPRABHAT CLASSIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SUPRABHAT CLASSIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUPRABHAT CLASSIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUPRABHAT CLASSIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.