Home / Browse projects / Mumbai Suburban, Maharashtra / Sunteck BKC51

Completed Litigation declared Commercial project

Sunteck BKC51

By SAHRISH CONSTRUCTIONS PRIVATE LIMITED

RG-MH-12722 · RERA P51800022320 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
75 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Sunteck BKC51 is a Commercial project by SAHRISH CONSTRUCTIONS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800022320 on 16 Sep 2019. The registration is recorded completed; possession was promised by 30 Jun 2023. 0 of the 75 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSunteck BKC51
  • TypeCommercial
  • Location
    • L.B.S. Marg
    • Opp Equinox Business Park
    • Kurla
    • Mumbai Suburban
    • 400070
  • Pincode400070
  • RERA no.P51800022320
  • ReraGenie IDRG-MH-12722

Builder

  • NameSAHRISH CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45400MH2012PTC233184
  • DirectorAjeet Singh

Key dates

this monthRegisteredSep 2019PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Sep 2019
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

0%0 of 75 units booked
68.3%Work done, per cost certificate

Figures as on 7 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sunteck BKC51NA15007575

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sunteck BKC51: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered180

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,373 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation (BMC)
Permissible FSI10577.69
Proposed, not sanctioned10,578 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManek Smruti Bldg, TPS 2, Nahru Road, Vile Parle East, Mumbai 400057
Estimated costRs 61.48 cr
Cost incurredRs 41.96 cr
Work done68.26%
BuildingWingEstimatedIncurred
Sunteck BKC51NARs 58.04 crRs 38.53 cr
-NARs 3.44 crRs 3.44 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIAG Consultant
ArchitectMorphogenesis
EngineerSanjay More
EngineerJagdish Korgaonkar
Chartered AccountantNidhi Somani & Co.
Chartered AccountantJhanwar & Maheshwari
PartnerRole in project
SAHRISH CONSTRUCTIONS PRIVATE LIMITED-

Litigation declared3

CaseCourtStatus
932/2016Bombay High CourtClosed
212/2014Bombay High CourtOngoing
932/2016Bombay High CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Aug 2023

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck BKC51_2023-24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck BKC51_2023-24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck BKC51_2022-23.pdf27 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2023 07 20 OCC Letter.pdf19 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Annexure E-Form 4- Architect Certificate_Signed .pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE BKC51_June-23.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE BKC51_June-23.pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE BKC51_June-23.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Assurance Certificate bkc51-12_Mar-23.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE BKC51_Mar-23.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE BKC51_Mar-23.pdf27 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE BKC51_Mar-23.pdf27 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE BKC51_2023 01 03.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE BKC51_2023 01 19.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE BKC51_2023 01 19.pdf21 Jan 2023
Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE BKC51.pdf2 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -ARCHITECT'S CERTIFICATE Sunteck BKC51_Oct-22.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE BKC51_Oct-22.pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE BKC51_Oct-22.pdf13 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck BKC51_2021-22.pdf30 Sep 2022
Building plan approvalFile: 2022 05 20 IOD.pdf20 Jul 2022
Building plan approvalFile: 2022 05 20 IOD Drawing 01.pdf20 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 2022 05 20 IOD.pdf20 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 2022 05 20 IOD Drawing 01.pdf20 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: 2022 06 07_FurtherCC_signed.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_June-22.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for BKC51_July-22.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 07 Form 3-CA Certificate BKC51_July-22.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_Mar-22.pdf15 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for BKC51_Mar-22.pdf15 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate bkc51-11_Mar-22 .pdf15 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 04 Form 3-CA Certificate BKC51_April-22.pdf15 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_Jan-22.pdf10 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for BKC51_Sep-21.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate bkc51-10_Dec-21.pdf8 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate BKC51_Jan-22.pdf8 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 2021 11 18_FCC.pdf19 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_Oct-21.pdf14 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate BKC51_Oct-21.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate bkc51-09_Sep-21.pdf28 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Sunteck BKC51 2020-21.pdf28 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Sunteck BKC51 2020-21.pdf28 Sep 2021
Building plan approvalFile: 2021 08 19 Amended IOD letter.pdf6 Sep 2021
Building plan approvalFile: 2021 08 19 Amended IOD Drawing to uload.pdf6 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 2021 08 19 Amended IOD letter.pdf6 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: 2021 08 19 Amended IOD Drawing to uload.pdf6 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_June-21.pdf16 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC 19 04 21.pdf22 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A)File: 06_2021 FORM 2A Quality Assurance Certificate bkc51.pdf22 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_Mar-21.pdf23 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A)File: 03_2021 FORM 2A Quality Assurance Certificate bkc51.pdf23 Mar 2021
Building plan approvalFile: IOD LETTER 22 01 2021.pdf29 Jan 2021
Building plan approvalFile: IOD DRAWING 22 01 2021 to upload.pdf29 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD LETTER 22 01 2021.pdf29 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING 22 01 2021 to upload.pdf29 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_Dec-20.pdf22 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 12_2020 12 FORM 2A Quality Assurance Certificate bkc51.pdf22 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA certificate -Form5-final to upload.pdf1 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51_Sep-20 Revised.pdf23 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 03_2020 03 FORM 2A Quality Assurance Certificate bkc51.pdf19 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 06_2020 06 FORM 2A Quality Assurance Certificate bkc51.pdf19 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 09_2020 09 FORM 2A Quality Assurance Certificate bkc51.pdf19 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51 Mar 20.pdf5 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 02_2019 12 FORM 2A Quality Assurance Certificate bkc51.pdf20 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck BKC51 Dec19.pdf12 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for BKC51.pdf6 Sep 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A certificate with inventory.pdf6 Sep 2019
Layout approvalFile: 2018 06 27_IOD_signed.pdf5 Sep 2019
Building plan approvalFile: 2018 06 27_IOD_signed.pdf5 Sep 2019
Building plan approvalFile: 2018 06 27 IOD DRAWING.pdf5 Sep 2019
Copy of the legal title reportFile: Sunteck BKC51 Title Certificate.pdf5 Sep 2019
Details of encumbrancesFile: Declaration encumbrance.pdf5 Sep 2019
Copy of Layout Approval (in case of layout)File: 2018 06 27_IOD_signed.pdf5 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: 2018 06 27_IOD_signed.pdf5 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: 2018 06 27 IOD DRAWING.pdf5 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: 2018 08 14 First CC.pdf5 Sep 2019
Declaration in FORM BFile: Declaration Promoter.pdf5 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf5 Sep 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Certificate .pdf5 Sep 2019
Proforma of Allotment letterFile: Revised declaration agreement 110919.pdf5 Sep 2019

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck BKC51 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp Equinox Business Park6,700+ in Mumbai Suburban

Builder: SAHRISH CONSTRUCTIONS PRIVATE LIMITED

SAHRISH CONSTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including Sunteck BKC51. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sunteck BKC51 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck BKC51?

The registered promoter entity is SAHRISH CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45400MH2012PTC233184 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck BKC51?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunteck BKC51?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck BKC51?

The professionals named in the filing: Architect: IAG Consultant; Architect: Morphogenesis; Engineer: Sanjay More; Engineer: Jagdish Korgaonkar; Chartered Accountant: Nidhi Somani & Co.; Chartered Accountant: Jhanwar & Maheshwari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck BKC51?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck BKC51. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck BKC51 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.