ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / SUNRISE HEIGHTS

Registration lapsed No litigation declared Others project

SUNRISE HEIGHTS

By YASHODA BUILDERS AND DEVELOPERS

RG-MH-44931 · RERA P51600056204 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 12 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
14 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

SUNRISE HEIGHTS is a Others project by YASHODA BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600056204 on 21 May 2024. Possession was promised by 29 Oct 2025 and is now 12 months past that date.

At a glance

Project

  • NameSUNRISE HEIGHTS
  • TypeOthers
  • Location
    • AMBAD LINK ROAD
    • CHUNCHALE SHIWAR
    • Nashik (M Corp.)
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600056204
  • ReraGenie IDRG-MH-44931

Builder

  • NameYASHODA BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersRAMKALYAN PANDEY, PREMSAGAR PANDEY

Key dates

12 months past promisethis monthRegisteredMay 2024PromisedOct 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 May 2024
  • Promised completion29 Oct 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed71 files

Current status

100.0%Work done, per cost certificate

Figures as on 29 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA60000
WING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

WING A64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered60
Open Space45
BuildingClosed/CoveredOpen SpaceTotal
WING A302353
WING B302252

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area948 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Sep 2025
LandownerVillageDistrict
Ramasray KewatSakiMumbai Suburban
Mobeen Ahmed N ChaudharySakiMumbai Suburban

Approvals and building plan

Sanctioning authorityNashik Municipal corporation
Permissible FSI3029.41
Proposed, not sanctioned3,029 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1-4 PLOT NO 25-28 URJAYANT ARCHID SYMBIOSIS COLLEGE CHOWK PATHARDI PHATA AMBAD
Estimated costRs 7.80 cr
Cost incurredRs 7.80 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING ANARs 7.80 crRs 7.80 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMUZAFFAR G MANSURI
ArchitectMOINNAWAZ MANIYAR
EngineerBhanuvilas Pundalik Bhavsar
EngineerBhanuvilas Pundlik Bhavsar
EngineerMoinnawaz Maniyar
Chartered AccountantCA SHUBHAM SINGH
Chartered AccountantMAHENDRA R JAMDHADE
PartnerRole in project
YASHODA BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q4.pdf29 Sep 2025
Withdrawal Update Form 2File: FORM 2 Q2.pdf29 Sep 2025
Withdrawal Update Form 3File: FORM 3 Q4.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf23 Sep 2025
Withdrawal Update Form 1File: FORM 1 Q1.pdf23 Sep 2025
Withdrawal Update Form 1File: FORM 1 Q2.pdf23 Sep 2025
Withdrawal Update Form 1File: FORM 1 Q4.pdf23 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf23 Sep 2025
Withdrawal Update Form 2File: FORM 2 Q1.pdf23 Sep 2025
Withdrawal Update Form 2File: FORM 2 Q2.pdf23 Sep 2025
Withdrawal Update Form 2File: FORM 2 Q2.pdf23 Sep 2025
Withdrawal Update Form 3File: FORM 3 Q3.pdf23 Sep 2025
Withdrawal Update Form 3File: FORM 3 Q1.pdf23 Sep 2025
Withdrawal Update Form 3File: FORM 3 Q2.pdf23 Sep 2025
Withdrawal Update Form 3File: FORM 3 Q4.pdf23 Sep 2025
Form 1File: FORM 1 Q3.pdf18 Sep 2025
Form 2File: FORM 2 Q3.pdf18 Sep 2025
Form 3File: FORM 3 Q3.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Q3.pdf18 Sep 2025
Form 1File: FORM 1 Q1.pdf11 Sep 2025
Form 2File: FORM 2 Q1.pdf11 Sep 2025
Form 3File: FORM 3 Q1.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Q1.pdf11 Sep 2025
Form 1File: FORM 1 Q2.pdf11 Sep 2025
Form 2File: FORM 2 Q2.pdf11 Sep 2025
Form 3File: FORM 3 Q2.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Q2.pdf11 Sep 2025
Form 1File: FORM 1 Q3.pdf11 Sep 2025
Form 2File: FORM 2 Q3.pdf11 Sep 2025
Form 3File: FORM 3 Q3.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Q3.pdf11 Sep 2025
Details of encumbrances concerned to FinanceFile: 1Financial Encumbrances.pdf8 May 2024
Details of encumbrances concerned to LegalFile: 1Financial Encumbrances.pdf8 May 2024
Layout approvalFile: Plot Layout_compressed.pdf16 Apr 2024
Copy of Layout Approval (in case of layout)File: Plot Layout_compressed.pdf16 Apr 2024
CERSAI detailsFile: 2CERSAI.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3RERA CA Certificate.pdf16 Apr 2024
Proforma of Allotment letterFile: Proforma_Agreement.pdf16 Apr 2024
Building plan approvalFile: scan0017_11zon.pdf23 Mar 2024
Building plan approvalFile: Building Plan.pdf23 Mar 2024
Copy of the legal title reportFile: Adobe Scan 22 Mar 2024_compressed.pdf23 Mar 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances Con to finance.pdf23 Mar 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances.pdf23 Mar 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances Con to finance.pdf23 Mar 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances.pdf23 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0017_11zon.pdf23 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf23 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commenceent Certificate.pdf23 Mar 2024
Declaration about Commencement CertificateFile: Declaration_Commencement.pdf23 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details.pdf23 Mar 2024
Other - LegalFile: Declaration-cum-Undertaking_Annexure A.pdf23 Mar 2024
Other - TechnicalFile: Declaration-cum-Undertaking_Annexure A.pdf23 Mar 2024
Other - TechnicalFile: Verification of CC.pdf23 Mar 2024
Other - TechnicalFile: Verification of CC-Circular 45.pdf23 Mar 2024
Declaration in FORM BFile: Form B-Developer.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 12 Disclosure of interest in other real estate organisations.pdf31 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation - Proforma Letter.pdf31 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 11 Deviation report-Agreement for sale.pdf31 Jan 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf30 Jan 2024
PAN CardFile: PAN Card.pdf30 Jan 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf30 Jan 2024
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal.pdf30 Jan 2024
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf30 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf30 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf30 Jan 2024
Proforma of Agreement for saleFile: Model Form of Agreement for sale.pdf30 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank_Disclosure.pdf30 Jan 2024

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNRISE HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHUNCHALE SHIWAR4,100+ in Nashik

Builder: YASHODA BUILDERS AND DEVELOPERS

YASHODA BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SUNRISE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that SUNRISE HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SUNRISE HEIGHTS is delayed beyond 29 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNRISE HEIGHTS?

The registered promoter entity is YASHODA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNRISE HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUNRISE HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNRISE HEIGHTS?

The professionals named in the filing: Architect: MUZAFFAR G MANSURI; Architect: MOINNAWAZ MANIYAR; Engineer: Bhanuvilas Pundalik Bhavsar; Engineer: Bhanuvilas Pundlik Bhavsar; Engineer: Moinnawaz Maniyar; Chartered Accountant: CA SHUBHAM SINGH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNRISE HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNRISE HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNRISE HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.