Home / Browse projects / Nashik, Maharashtra / SUN CITY

Registered No litigation declared Others project

SUN CITY

By SAMRUDDHI BUILDERS & DEVELOPERS

RG-MH-14946 · RERA P51600033203 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
29 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 50%
92 of 172Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

SUN CITY is a Others project by SAMRUDDHI BUILDERS & DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600033203 on 9 Feb 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 80 of the 172 units on this registration are recorded sold or booked, and 29 of 33 construction stages are filed complete.

At a glance

Project

  • NameSUN CITY
  • TypeOthers
  • Location
    • AGARTAKLI RAOD
    • NASHIK
    • 422037
  • Pincode422037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600033203
  • ReraGenie IDRG-MH-14946

Builder

  • NameSAMRUDDHI BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersNITIN SAHANE, KUNDAN SAHANE, SUNIL PATEL, ARVIND PATEL
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2022First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings3 building records
  • Documents filed121 files

Current status

47%80 of 172 units booked
78.6%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNCITY BUILDING 1NA7756561
SUNCITY BUILDING 2NA7756561
SUNCITY BUILDING 3NA3305050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

SUNCITY BUILDING 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
SUNCITY BUILDING 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
SUNCITY BUILDING 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2026
LandownerVillageDistrict
PUNDLIK PUNJA JAMKARNashikNashik
KANTA SHIVALENashikNashik
BHAGWAT RANPISENashik RoadNashik
SHUBHASH JAMKARNashikNashik
SHAM JAMKARNashikNashik
ANIL ZAKANENashikNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI5285.09
Proposed, not sanctioned5,285 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNASHIK ROAD
Estimated costRs 18.74 cr
Cost incurredRs 14.73 cr
Work done78.62%
BuildingWingEstimatedIncurred
SUNCITY BUILDING 1NARs 17.62 crRs 14.09 cr
-NARs 1.12 crRs 64.09 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHIRAJ T WALUNJ
EngineerSUFIYAN MANIYAR
Chartered AccountantDILIP PANDURANG PALDE
Chartered AccountantSOUMITRA MUKHERJEE
PartnerRole in project
SAMRUDDHI BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600025995Dec 2024 → Dec 2026

Reason as filed by the promoterthe delay in construction activities have occurred due to unavoidable reasons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jan 2025

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf29 May 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf29 May 2026
Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE0326.pdf29 May 2026
Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE0326.pdf29 May 2026
Withdrawal Update Form 3File: FORM 3 FORMAT NEW0326.pdf29 May 2026
Withdrawal Update Form 3File: FORM 3 FORMAT NEW0326.pdf29 May 2026
Form 5 (FY 2021-2022)File: ANUAL REPORT FY-21-22.pdf29 May 2026
Form 5 (FY 2023-2024)File: Suncity - Form 5 FY-23-24 - MAR-24.pdf29 May 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE 1225.pdf25 Jan 2026
Form 2File: FORM 2 ENGG CERTIFICATE 1225.pdf25 Jan 2026
Form 3File: FORM 3 CA CERTIFICATE 1225.pdf25 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf25 Jan 2026
Form 1File: FORM 1 ARCHITECT.pdf28 Dec 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf28 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon (16).pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT.pdf28 Dec 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf28 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon (17).pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf28 Dec 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf28 Dec 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf28 Dec 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf25 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf25 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf25 Nov 2025
Form 1File: form 1 architect.pdf25 Nov 2025
Form 2File: form 2 engg cert.pdf25 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf25 Nov 2025
Form 1File: FORM 1 ARCHITECT CERT.pdf25 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf25 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf25 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf25 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf25 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf25 Nov 2025
Disclosure of sold/ booked inventoryFile: Sold unsold-170725.pdf17 Jul 2025
Disclosure of sold/ booked inventoryFile: sold inventory.pdf28 Jun 2025
Other - TechnicalFile: PERT CHART.pdf28 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANUAL REPORT FY-21-22.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf8 May 2025
Declaration in FORM BFile: FORM B.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf5 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Suncity - Form 5 FY-23-24 - MAR-24.pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Supervisor Certificate.pdf24 Jan 2025
Other - LegalFile: Declaration-cum-undertaking annexure A.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventor 300924.pdf22 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: declaration about rera designated bank account format A.pdf22 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Opening of RERA designated Bank Accounts.pdf22 Jan 2025
Proforma of Agreement for saleFile: Blank Draft Suncity.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf16 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE BUILDING 1.pdf8 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BUILDING 1 COMPLETION.pdf5 Jan 2025
PAN CardFile: PAN.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE_11zon.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE_11zon.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE_11zon.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE_11zon.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE_11zon.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE_11zon.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE_11zon.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - FY 22-23.pdf4 Mar 2024

How this compares with Nashik

47%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 24 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUN CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmSUN CITYCompleted 19Lapsed / revoked 7Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: SAMRUDDHI BUILDERS & DEVELOPERS

SAMRUDDHI BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including SUN CITY and TANUSH PARK PHASE- 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SUN CITY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUN CITY?

The registered promoter entity is SAMRUDDHI BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUN CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUN CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUN CITY?

The professionals named in the filing: Architect: DHIRAJ T WALUNJ; Engineer: SUFIYAN MANIYAR; Chartered Accountant: DILIP PANDURANG PALDE; Chartered Accountant: SOUMITRA MUKHERJEE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUN CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUN CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUN CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.