Home / Browse projects / Pune, Maharashtra / Sukhwani Coloronic Phase - III
Sukhwani Coloronic Phase - III
RG-MH-22517 · RERA P52100032196 · Last updated on MahaRERA portal: 25 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 60 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sukhwani Coloronic Phase - III is a Others project by S. S. D. Construction in Pune, Maharashtra, registered with MahaRERA as P52100032196 on 14 Dec 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 60 months from the original filing. 25 of the 82 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NameSukhwani Coloronic Phase - III
- TypeOthers
- Location
- Aundh Ravet BRTS Road
- Ravet
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032196
- ReraGenie IDRG-MH-22517
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Dec 2021
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2024)
- Buildings2 building records
- Documents filed92 files
Current status
Figures as on 25 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A1 | NA | 8 | 5 | 0 | 29 | 29 |
| Building A | NA | 14 | 13 | 47 | 6 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
Building A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed88
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building A1 | 12 | 32 | 44 |
| Building A | 19 | 25 | 44 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building A1 | NA | Rs 9.52 cr | Rs 1.57 cr |
| Building A | NA | Rs 7.02 cr | Rs 7.02 cr |
| - | NA | Rs 2.00 cr | Rs 1.65 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hrushikesh Deore |
| Engineer | Mr Umesh P Kapadane |
| Chartered Accountant | A N J K & CO LLP |
| Chartered Accountant | R V nevatia and Co |
| Chartered Accountant | Chevale Aghav & Co LLP |
| Partner | Role in project |
|---|---|
| S. S. D. Construction | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100032196 up to 31/12/2029
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architects Certificate for RERA.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Engineering Certificate for RERA.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate - June 2024- Sign.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Architects Certificate for RERA.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Architects Certificate for RERA.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Engineering Certificate for RERA.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Engineering Certificate for RERA.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate - June 2024- Sign.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate - June 2024- Sign.pdf | 11 Jun 2026 |
| Form 1File: Architects Certificate for RERA.pdf | 11 May 2026 |
| Form 2File: Engineering Certificate for RERA.pdf | 11 May 2026 |
| Form 3File: CA Certificate for RERA_compressed.pdf | 11 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Buildingwise.pdf | 11 May 2026 |
| Form 1File: Form 1 SSD.pdf | 24 Jan 2026 |
| Form 2File: Form 2 SSD.pdf | 24 Jan 2026 |
| Form 3File: Form 3 SSD_compressed.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold SSD Phase III.pdf | 24 Jan 2026 |
| Form 5 (FY 2024-2025)File: CA Form 5_Coloronic Phase III_FY 2024-25_Signed.pdf | 2 Dec 2025 |
| Form 1File: Architech Certificate (2).pdf | 7 Nov 2025 |
| Form 2File: Coloronic_Engineer Certificate.pdf | 7 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Coloronic_Sold Unsold List.pdf | 7 Nov 2025 |
| OthersFile: Sukhwani Coloronic A Bldg Completion Certificate.pdf | 7 Nov 2025 |
| Form 3File: Coloronic_Form 3_compressed.pdf | 7 Nov 2025 |
| Form 1File: Architech Certificate (2).pdf | 25 Jul 2025 |
| Form 2File: Engineers Certificate (4).pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold List (2).pdf | 25 Jul 2025 |
| Form 3File: CA Certificate (3)_compressed.pdf | 25 Jul 2025 |
| Form 1File: Form 1 - SSD Construction_Architect Certificate.pdf | 25 Jul 2025 |
| Form 2File: Form 2 - SSD Construction_Engineers Certificate.pdf | 25 Jul 2025 |
| Form 3File: Form 3 -SSD Construction_CA Certificate_compressed.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SSD Construction_Sold Unsold Booked List.pdf | 25 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - SSD Construction_Architect Certificate.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -SSD Construction_CA Certificate_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - SSD Construction_Engineers Certificate.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SSD Construction_Sold Unsold Booked List.pdf | 22 Apr 2025 |
| Declaration in FORM BFile: Form B -Declaration by promoter.pdf | 22 Mar 2025 |
| Other - TechnicalFile: Plinth Certificate.pdf | 15 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 Sukhwani coloronic Phase III.pdf | 27 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf | 19 Feb 2025 |
| Declaration in FORM BFile: Form B -Declaration by promoter.pdf | 19 Feb 2025 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 19 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Dec 24.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - December 2024 signed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 2024.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sept 2024 - Sign.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Phase III June 2024.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June 2024- Sign.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate sign_11zon.pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate New Format_11zon.pdf | 25 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance March 2024 (1).pdf | 25 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Phase III March 2024.pdf | 25 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format - Sukhwani Coloronic Phase III sign_11zon.pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 6 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory .pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format - Sukhwani Coloronic Phase III Signed.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 5 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - FY 22-23.pdf | 5 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SUKHWANI COLORONIC PHASE III FORM 5 22-23.pdf | 29 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - FY 21-22.pdf | 15 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 15 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3_Compressed.pdf | 15 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SSD PHASE III RERA.pdf | 20 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SSD Construction_ColornicPhase-III_Form5.pdf | 27 Feb 2023 |
| Copy of the legal title reportFile: SSD CONSTRUCTION LEGALTITLE REPORT.pdf | 2 Dec 2021 |
| Copy of the legal title reportFile: SSD CONSTRUCTION SEARCH TITLE REPORT.pdf | 2 Dec 2021 |
| CERSAI detailsFile: Undertaking for no Security Interest.pdf | 2 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed Coloronic III.pdf | 2 Dec 2021 |
| Proforma of Allotment letterFile: Agreement Draft S Coloronic Ravet final 19112021 (1).pdf | 2 Dec 2021 |
| Proforma of Allotment letterFile: allotment 5-6-2018.pdf | 2 Dec 2021 |
| Layout approvalFile: lay out (1).pdf | 13 Nov 2021 |
| Building plan approvalFile: 01 rera scan _compressed A1.pdf | 13 Nov 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sukhwani Coloronic Phase I | Sr no 90-5 91-1 Aundh Ravet BRTS Road Ravet Pimpri Chinchwad Pune 412101 | 94 | Completed | Dec 2016 | Late, Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sukhwani Coloronic Phase - III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ravet13,700+ in Pune
Filed coordinates, straight-line distance. 281 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: S. S. D. Construction
S. S. D. Construction has 2 registrations on MahaRERA, including Sukhwani Coloronic Phase II and Sukhwani Coloronic Phase - III. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sukhwani Coloronic Phase - III is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sukhwani Coloronic Phase - III?
The registered promoter entity is S. S. D. Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sukhwani Coloronic Phase - III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sukhwani Coloronic Phase - III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sukhwani Coloronic Phase - III?
The professionals named in the filing: Architect: Hrushikesh Deore; Engineer: Mr Umesh P Kapadane; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: R V nevatia and Co; Chartered Accountant: Chevale Aghav & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sukhwani Coloronic Phase - III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback