Sukhwani Coloronic Phase - III

By S. S. D. Construction

RG-MH-22517 · RERA P52100032196 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 60 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
57 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Sukhwani Coloronic Phase - III is a Others project by S. S. D. Construction in Pune, Maharashtra, registered with MahaRERA as P52100032196 on 14 Dec 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 60 months from the original filing. 25 of the 82 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameSukhwani Coloronic Phase - III
  • TypeOthers
  • Location
    • Aundh Ravet BRTS Road
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032196
  • ReraGenie IDRG-MH-22517

Builder

  • NameS. S. D. Construction
  • Entity typePartnership
  • PartnerKANHAIYALAL HOTCHAND MATANI
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2021First promiseDec 2024Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2021
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed92 files

Current status

30%25 of 82 units booked
55.3%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A1NA8502929
Building ANA141347653

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Building A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered31
Open Space57
BuildingClosed/CoveredOpen SpaceTotal
Building A1123244
Building A192544

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,728 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPCMC, Pune
Permissible FSI4767.29
Proposed, not sanctioned4,767 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKamala Crossroad, Finolex Chowk, Opp PCMC Office, Pimpri, Pune - 411017
Estimated costRs 18.55 cr
Cost incurredRs 10.25 cr
Work done55.28%
BuildingWingEstimatedIncurred
Building A1NARs 9.52 crRs 1.57 cr
Building ANARs 7.02 crRs 7.02 cr
-NARs 2.00 crRs 1.65 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHrushikesh Deore
EngineerMr Umesh P Kapadane
Chartered AccountantA N J K & CO LLP
Chartered AccountantR V nevatia and Co
Chartered AccountantChevale Aghav & Co LLP
PartnerRole in project
S. S. D. Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027689Dec 2024 → Dec 2029

Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100032196 up to 31/12/2029

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate for RERA.pdf25 Jun 2026
Withdrawal Update Form 2File: Engineering Certificate for RERA.pdf25 Jun 2026
Withdrawal Update Form 3File: CA Certificate - June 2024- Sign.pdf25 Jun 2026
Withdrawal Update Form 1File: Architects Certificate for RERA.pdf11 Jun 2026
Withdrawal Update Form 1File: Architects Certificate for RERA.pdf11 Jun 2026
Withdrawal Update Form 2File: Engineering Certificate for RERA.pdf11 Jun 2026
Withdrawal Update Form 2File: Engineering Certificate for RERA.pdf11 Jun 2026
Withdrawal Update Form 3File: CA Certificate - June 2024- Sign.pdf11 Jun 2026
Withdrawal Update Form 3File: CA Certificate - June 2024- Sign.pdf11 Jun 2026
Form 1File: Architects Certificate for RERA.pdf11 May 2026
Form 2File: Engineering Certificate for RERA.pdf11 May 2026
Form 3File: CA Certificate for RERA_compressed.pdf11 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Buildingwise.pdf11 May 2026
Form 1File: Form 1 SSD.pdf24 Jan 2026
Form 2File: Form 2 SSD.pdf24 Jan 2026
Form 3File: Form 3 SSD_compressed.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold SSD Phase III.pdf24 Jan 2026
Form 5 (FY 2024-2025)File: CA Form 5_Coloronic Phase III_FY 2024-25_Signed.pdf2 Dec 2025
Form 1File: Architech Certificate (2).pdf7 Nov 2025
Form 2File: Coloronic_Engineer Certificate.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: Coloronic_Sold Unsold List.pdf7 Nov 2025
OthersFile: Sukhwani Coloronic A Bldg Completion Certificate.pdf7 Nov 2025
Form 3File: Coloronic_Form 3_compressed.pdf7 Nov 2025
Form 1File: Architech Certificate (2).pdf25 Jul 2025
Form 2File: Engineers Certificate (4).pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List (2).pdf25 Jul 2025
Form 3File: CA Certificate (3)_compressed.pdf25 Jul 2025
Form 1File: Form 1 - SSD Construction_Architect Certificate.pdf25 Jul 2025
Form 2File: Form 2 - SSD Construction_Engineers Certificate.pdf25 Jul 2025
Form 3File: Form 3 -SSD Construction_CA Certificate_compressed.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SSD Construction_Sold Unsold Booked List.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - SSD Construction_Architect Certificate.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -SSD Construction_CA Certificate_compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - SSD Construction_Engineers Certificate.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: SSD Construction_Sold Unsold Booked List.pdf22 Apr 2025
Declaration in FORM BFile: Form B -Declaration by promoter.pdf22 Mar 2025
Other - TechnicalFile: Plinth Certificate.pdf15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 Sukhwani coloronic Phase III.pdf27 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf19 Feb 2025
Declaration in FORM BFile: Form B -Declaration by promoter.pdf19 Feb 2025
CERSAI detailsFile: CERSAI Declaration.pdf19 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Dec 24.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - December 2024 signed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sept 2024 - Sign.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Phase III June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June 2024- Sign.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate sign_11zon.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate New Format_11zon.pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance March 2024 (1).pdf25 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Phase III March 2024.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format - Sukhwani Coloronic Phase III sign_11zon.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory .pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format - Sukhwani Coloronic Phase III Signed.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf5 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - FY 22-23.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SUKHWANI COLORONIC PHASE III FORM 5 22-23.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - FY 21-22.pdf15 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf15 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3_Compressed.pdf15 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SSD PHASE III RERA.pdf20 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SSD Construction_ColornicPhase-III_Form5.pdf27 Feb 2023
Copy of the legal title reportFile: SSD CONSTRUCTION LEGALTITLE REPORT.pdf2 Dec 2021
Copy of the legal title reportFile: SSD CONSTRUCTION SEARCH TITLE REPORT.pdf2 Dec 2021
CERSAI detailsFile: Undertaking for no Security Interest.pdf2 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed Coloronic III.pdf2 Dec 2021
Proforma of Allotment letterFile: Agreement Draft S Coloronic Ravet final 19112021 (1).pdf2 Dec 2021
Proforma of Allotment letterFile: allotment 5-6-2018.pdf2 Dec 2021
Layout approvalFile: lay out (1).pdf13 Nov 2021
Building plan approvalFile: 01 rera scan _compressed A1.pdf13 Nov 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sukhwani Coloronic Phase ISr no 90-5 91-1 Aundh Ravet BRTS Road Ravet Pimpri Chinchwad Pune 41210194CompletedDec 2016Late, Jul 2017

How this compares with Pune

30%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sukhwani Coloronic Phase - III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmSukhwani Coloronic PhaseCompleted 118Lapsed / revoked 51Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 281 registered projects within 2 km.

Builder: S. S. D. Construction

S. S. D. Construction has 2 registrations on MahaRERA, including Sukhwani Coloronic Phase II and Sukhwani Coloronic Phase - III. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sukhwani Coloronic Phase - III is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sukhwani Coloronic Phase - III?

The registered promoter entity is S. S. D. Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sukhwani Coloronic Phase - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sukhwani Coloronic Phase - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sukhwani Coloronic Phase - III?

The professionals named in the filing: Architect: Hrushikesh Deore; Engineer: Mr Umesh P Kapadane; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: R V nevatia and Co; Chartered Accountant: Chevale Aghav & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sukhwani Coloronic Phase - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sukhwani Coloronic Phase - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sukhwani Coloronic Phase - III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.