SUKAN SANKUL

By SHAILESHKUMAR VITHALBHAI RAKHOLIYA

RG-MH-75845 · RERA P51600051291 · Last updated on MahaRERA portal: 24 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
21 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
31 of 51Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

SUKAN SANKUL is a Others project by SHAILESHKUMAR VITHALBHAI RAKHOLIYA in Nashik, Maharashtra, registered with MahaRERA as P51600051291 on 8 Jun 2023. Possession is promised by 4 Mar 2027. 20 of the 51 units on this registration are recorded sold or booked, and 21 of 44 construction stages are filed complete.

At a glance

Project

  • NameSUKAN SANKUL
  • TypeOthers
  • Location
    • PATHARDI
    • PATHARDI SHIWAR
    • Nashik (M Corp.)
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600051291
  • ReraGenie IDRG-MH-75845

Builder

  • NameSHAILESHKUMAR VITHALBHAI RAKHOLIYA
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion4 Mar 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed60 files

Current status

39%20 of 51 units booked
75.8%Work done, per cost certificate

Figures as on 24 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUKAN SANKUL - WING ANA1113013
SUKAN SANKUL - WING BNA2212315
SUKAN SANKUL - WING CNA119312
SUKAN SANKUL - WING DNA1111011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 24 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

SUKAN SANKUL - WING A42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SUKAN SANKUL - WING B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SUKAN SANKUL - WING C73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SUKAN SANKUL - WING D35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes60%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Open Space69
BuildingOpen SpaceTotal
SUKAN SANKUL - WING A2020
SUKAN SANKUL - WING B1616
SUKAN SANKUL - WING C1818
SUKAN SANKUL - WING D1515

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,338 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025
LandownerVillageDistrict
MANDA NIVRUTTI DEMASENashikNashik
VINOD NIVRUTTI DEMASENashikNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI3453.23
Proposed, not sanctioned3,453 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC F C BUILDING MIDC NASHIK AMBAD INDUSTRIAL ESTATE NASHIK 422010
Estimated costRs 5.39 cr
Cost incurredRs 4.09 cr
Work done75.85%
BuildingWingEstimatedIncurred
SUKAN SANKUL - WING ANARs 1.54 crRs 1.00 cr
SUKAN SANKUL - WING BNARs 1.39 crRs 1.39 cr
SUKAN SANKUL - WING DNARs 1.26 crRs 56.66 lakh
SUKAN SANKUL - WING CNARs 1.02 crRs 1.02 cr
-NARs 17.45 lakhRs 10.47 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY K SANAP
EngineerC D PATEL
EngineerAPPUL VITHALBHAI RAKHOLIYA
Chartered AccountantRUSHIKESH VIJAY NANDAPURE
Chartered AccountantOMKAR SONAWANE
Chartered AccountantVAIBHAVI KULKARNI
PartnerRole in project
SHAILESHKUMAR VITHALBHAI RAKHOLIYA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 4 Mar 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sukan Sankul form 1 q3 portal signed 25_26.pdf24 May 2026
Withdrawal Update Form 2File: Sukan Sankul Form 2 q3 portal signed 25_26.pdf24 May 2026
Withdrawal Update Form 3File: form 3 signed portal Q3 25_26.pdf24 May 2026
Withdrawal Update Form 1File: Q2 Form 1 Sankul 25_26.pdf2 Apr 2026
Withdrawal Update Form 2File: Q2Form 2 Sankul 25_26.pdf2 Apr 2026
Withdrawal Update Form 3File: FORM 3 SCAN TILL 30_9_25 SUKAN SANKUL.pdf2 Apr 2026
Form 2A (FY 2023-2024)File: Sukan Sankul Form 2A. 24.pdf21 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A Sukan Sankul 25.pdf21 Nov 2025
Form 5 (FY 2023-2024)File: sukan sankul_form_5.pdf21 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Sukan Sankul sign.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 Sukan Sankul.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Sankul 08-07-2025.pdf29 Oct 2025
Withdrawal Update Form 3File: form 3 SUKAN SANKUL 25_09_25.pdf29 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 SUKAN SANKUL 24-25_compressed.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q SUKAN SANKUL 24-25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sukan Sankul Form 1_compressed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sankul 08-01-2025.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SINGNED FORM 3 30_09_23.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SINGNED FORM 3 28_02_24.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: sukan sankul_form_5.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sukan Sankul.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sukan Sankul_compressed.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sankul.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sankul 15_04_2024_compressed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sankul 15_04_2024.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sukan Sankul_compressed.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sankul 08_01_2024.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sankul_compressed.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sankul (2)_compressed.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SANKUL_11zon.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sankul.pdf22 Aug 2023
Other - TechnicalFile: LAND ENCUMBRANCE.pdf17 May 2023
Other - TechnicalFile: Query regarding floor.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf13 May 2023
Layout approvalFile: Layout Sukan sankul_11zon.pdf8 May 2023
Building plan approvalFile: Plan Sukan Sankul 1_11zon.pdf8 May 2023
Building plan approvalFile: Plan Sukan Sankul 2_11zon.pdf8 May 2023
PAN CardFile: PAN.pdf8 May 2023
Copy of the legal title reportFile: lEGAL tITLE_11zon.pdf8 May 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCES.pdf8 May 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCES.pdf8 May 2023
Copy of Layout Approval (in case of layout)File: Layout Sukan sankul_11zon.pdf8 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Sukan Sankul 1_11zon.pdf8 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Sukan Sankul 2_11zon.pdf8 May 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf8 May 2023
Declaration about Commencement CertificateFile: Declaration of Commencement .pdf8 May 2023
Declaration in FORM BFile: form B developer _merged.pdf8 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 May 2023
CERSAI detailsFile: CERSAI REPORT.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest .pdf8 May 2023
Proforma of Agreement for saleFile: Model_AFS_in_English LATEST.pdf8 May 2023
Proforma of Allotment letterFile: Model Allotment Letter Latest.pdf8 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT A.pdf8 May 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter .pdf8 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement .pdf8 May 2023
Other - FinanceFile: bank encumbrance .pdf8 May 2023
Other - TechnicalFile: CREDAI .pdf8 May 2023

How this compares with Nashik

39%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUKAN SANKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PATHARDI SHIWAR4,100+ in Nashik

2 kmSUKAN SANKULCompleted 87Lapsed / revoked 14Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 156 registered projects within 2 km.

Builder: SHAILESHKUMAR VITHALBHAI RAKHOLIYA

SHAILESHKUMAR VITHALBHAI RAKHOLIYA has 1 registration on MahaRERA, including SUKAN SANKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SUKAN SANKUL is delayed beyond 4 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUKAN SANKUL?

The registered promoter entity is SHAILESHKUMAR VITHALBHAI RAKHOLIYA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUKAN SANKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUKAN SANKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUKAN SANKUL?

The professionals named in the filing: Architect: VIJAY K SANAP; Engineer: C D PATEL; Engineer: APPUL VITHALBHAI RAKHOLIYA; Chartered Accountant: RUSHIKESH VIJAY NANDAPURE; Chartered Accountant: OMKAR SONAWANE; Chartered Accountant: VAIBHAVI KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUKAN SANKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUKAN SANKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUKAN SANKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.