STERLING HEIGHTS B WING
RG-MH-77594 · RERA P99000018952 · Last updated on MahaRERA portal: 29 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
STERLING HEIGHTS B WING is a Others project by SHANTEE SWARG in Palghar, Maharashtra, registered with MahaRERA as P99000018952 on 17 Dec 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameSTERLING HEIGHTS B WING
- TypeOthers
- Location
- Gokhivare
- Yashwant Smart City
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000018952
- ReraGenie IDRG-MH-77594
Builder
- NameSHANTEE SWARG
- Entity typePartnership
- PartnersFAYAZZUDDIN YASIN KHANPADIYAR, MOHAMMED SHAMOON MOHAMMED ISHAQUE CHOUDHARY
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Dec 2018
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| STERLING HEIGHTS B WING | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
STERLING HEIGHTS B WING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 29 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANAT MEHTA & ASSOCATES |
| Architect | MUFADDAL MERCHANT |
| Engineer | JAYSHREE KRISHNA CONSULTING ENGINEER |
| Engineer | MOHAMMED SHOEB BHATI |
| Partner | Role in project |
|---|---|
| SHANTEE SWARG | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Apr 2025
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 STERLING B WING MAR 25.pdf | 29 Apr 2025 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HEIGHTS B-WING.pdf | 29 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 STERLING B WING MAR 25.pdf | 29 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: STERLING HEIGHTS A, B AND E WING OC.pdf | 8 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STERLING HEIGHT WING B FORM 1.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: STERLING HEIGHTS B WING FORM 3 REDUCE.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING FORM 2.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 STERLING HEIGHTS B WING.pdf | 15 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 STERLING B WING.pdf | 11 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: STERLING A and B WING SOC REG CERTI.pdf | 8 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC STERLING B WING 03122024.pdf | 8 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STERLING HEIGHT B WING.pdf | 5 Nov 2024 |
| Certificates of CA (Form 3)File: STERLING HEIGHTS B WING.pdf | 5 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING HEIGHT B WING.pdf | 5 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STERLING B WING.pdf | 1 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING B WING.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: STERLING B WING.pdf | 26 Jul 2024 |
| Certificates of CA (Form 3)File: STERLING HEIGHT B WING.pdf | 26 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING HEIGHT B-WING.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING B WING.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 STERLING HIEGHT B-WING.pdf | 9 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A STERLING HEIGHT B WING 31032024.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A STERLING HEIGHT B WING 31032023.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HIEGHT BWING 300623.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HIGHT B WING.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HEIGHT B WING.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING B WING.pdf | 1 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING HEIGHT B WING.pdf | 1 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 STERLING HEIGHT B-WING.pdf | 1 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STERLING HEIGHT B WING.pdf | 1 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 STERLING HEIGHT B WING.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HIEGHT BWING 300623.pdf | 1 Mar 2024 |
| Certificates of CA (Form 3)File: FORM-3 STERLING HIGHT B WING.pdf | 1 Mar 2024 |
| Certificates of CA (Form 3)File: STERLING HEIGHTS B WING.pdf | 1 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-3 STERLING HEIGHT B WING.pdf | 1 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: STERLING B REVISED CC.pdf | 6 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: STERLING HEIGHTS B WING.pdf | 25 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: STERLING HEIGHTS B WING.pdf | 24 Apr 2023 |
| Layout approvalFile: STERLING HEIGHTS B WING LAYOUT.pdf | 16 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: STERLING HEIGHTS B WING LAYOUT.pdf | 16 Aug 2022 |
| Form 2AFile: FORM 2A STERLING B.pdf | 25 Nov 2021 |
| Form 2AFile: FORM 2A STERLING B.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A STERLING B.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A STERLING B.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A STERLING B.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A STERLING B.pdf | 25 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD STERLING HEIGHTS B.pdf | 24 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA AUDIT STERLING B WING Form 5.pdf | 26 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA AUDIT STERLING B WING Form 5.pdf | 26 Feb 2021 |
| Form 2AFile: FORM-2A - STERLING B WING.pdf | 24 Feb 2020 |
| Form 2AFile: FORM-2 STERLING B WING 30-09-20.pdf | 13 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 1819 STERLING HEIGHTS B WING-30-11-19.pdf | 31 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COM CRT REVISED .pdf | 24 Dec 2019 |
| Form 2AFile: FORM-2A STERLING HEIGHT B WING.pdf | 4 Jun 2019 |
| Proforma of Allotment letterFile: ALLOTMENT B WING.pdf | 1 Dec 2018 |
| Building plan approvalFile: Sterline Height B WING PG 1.pdf | 29 Nov 2018 |
| Building plan approvalFile: Strrline Height B WING PG 2.pdf | 29 Nov 2018 |
| Layout approvalFile: Sterline Height B WING PG 1.pdf | 29 Nov 2018 |
| Layout approvalFile: Strrline Height B WING PG 2.pdf | 29 Nov 2018 |
| PAN CardFile: SHANTEE SWARG PAN CARD.pdf | 29 Nov 2018 |
| Copy of the legal title reportFile: SEARCH TITLE REPORT B WING.pdf | 29 Nov 2018 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE STERLING B WING.pdf | 29 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: Sterline Height B WING PG 1.pdf | 29 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: Strrline Height B WING PG 2.pdf | 29 Nov 2018 |
| Building Plan Approval (IOD)File: Sterline Height B WING PG 1.pdf | 29 Nov 2018 |
| Building Plan Approval (IOD)File: Strrline Height B WING PG 2.pdf | 29 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COM CRT OF B WING.pdf | 29 Nov 2018 |
| Declaration in FORM BFile: FORM B STERLING B WING.pdf | 29 Nov 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep STERLING HEIGHTS B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Yashwant Smart City3,200+ in Palghar
Filed coordinates, straight-line distance. 93 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: SHANTEE SWARG
SHANTEE SWARG has 2 registrations on MahaRERA, including STERLING HEIGHTS B WING and STERLING HEIGHTS E WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that STERLING HEIGHTS B WING shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if STERLING HEIGHTS B WING is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of STERLING HEIGHTS B WING?
The registered promoter entity is SHANTEE SWARG, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in STERLING HEIGHTS B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for STERLING HEIGHTS B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at STERLING HEIGHTS B WING?
The professionals named in the filing: Architect: SANAT MEHTA & ASSOCATES; Architect: MUFADDAL MERCHANT; Engineer: JAYSHREE KRISHNA CONSULTING ENGINEER; Engineer: MOHAMMED SHOEB BHATI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in STERLING HEIGHTS B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback