STAR VISTA
RG-MH-22407 · RERA P52100031091 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 26 months
- 3 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
STAR VISTA is a Residential / Group Housing project by RAVIE KHILUMAL OCHANNI in Pune, Maharashtra, registered with MahaRERA as P52100031091 on 5 Oct 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 26 months from the original filing. 136 of the 150 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSTAR VISTA
- TypeResidential / Group Housing
- Location
- RAVET
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100031091
- ReraGenie IDRG-MH-22407
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2021
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Jul 2024)
- Buildings2 building records
- Documents filed194 files
Current status
Figures as on 10 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C | NA | 23 | 15 | 90 | 0 | 90 |
| D | NA | 23 | 15 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.
C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| C | 4 | 10 | 14 |
| D | 4 | 10 | 14 |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ARKO REALTY | Pimpri Chinchawad (M Corp.) | Pune |
| UMESH GANGARAM CHANDGUDE | Pimpri Chinchawad (M Corp.) | Pune |
| RANJEET ASHOK GAWALI | Keshavnagar-Mundwa | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 43.81 cr | Rs 43.20 cr |
| C | NA | Rs 21.91 cr | Rs 21.60 cr |
| D | NA | Rs 21.91 cr | Rs 21.60 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SACHIN SUTAR |
| Engineer | KP BADGUJAR |
| Engineer | Vishal Jagadale |
| Engineer | Nikhil Shivade |
| Chartered Accountant | GOTHE DURANDE |
| Chartered Accountant | NPSR & associates |
| Chartered Accountant | Ganesh Sunil Mandlecha |
| Partner | Role in project |
|---|---|
| RAVIE KHILUMAL OCHANNI | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Financial Issues
Reason as filed by the promoterThe delay in the project’s timeline has been primarily due to unforeseen labor shortages and financial constraints. The shortage of skilled and unskilled labor, caused by challenges in recruitment and retention, has significantly slowed down the construction progress. Additionally, financial difficulties, including issues in securing adequate funding, rising material costs, and higher-than-expected interest rates on loans, have further impacted the project timeline. Despite these challenges, we are actively addressing the issues by streamlining operations, recruiting additional workers, and ne
Reason as filed by the promoterWith reference to the above-mentioned project registered with MahaRERA under Registration No. P52100031091, we hereby submit the CPM-PERT statement along with this application and respectfully request for extension of the project registration. We wish to inform the Authority that all construction activities of the project have been completed in all respects. The project is now at the final statutory stage, and the only remaining milestone is receipt of the Completion Certificate (CC) from the competent authority. The application for Completion Certificate has already been submitted to the conc
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 760/2012/2012 | PIMPRI COURT | PENDING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600635 | TANAJI NARAYAN DHAWALE | RAVIE KHILUMAL OCHANNI | 03/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed194
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 194 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A(25-26) 280226.pdf | 10 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A(25-26) 280226.pdf | 10 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 9 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 C D bldg.pdf | 9 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 WITH SIGN.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Q4.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: form 2 Q4 with sign.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Q4 WITH SIGN_compressed.pdf | 30 May 2026 |
| Withdrawal Update Form 1File: Form 1_C and D_31122025.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: Form 2_C and D_31122025.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: Form 3 C and D_31122025.pdf | 29 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A (24-25) (3).pdf | 28 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: 30-06-2025 CD.pdf | 26 Dec 2025 |
| Withdrawal Update Form 1File: 30-09-2025 CD.pdf | 26 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1_11zon.pdf | 26 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2_11zon (1).pdf | 26 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 with sign Q1 0-2_11zon.pdf | 26 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 with sign Q1 0-2_11zon.pdf | 26 Dec 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A-2022.pdf | 19 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A-2023.pdf | 19 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A-2024.pdf | 19 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2024.pdf | 19 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form Sep 2024 (2).pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form Dec 2024 (2).pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form March 2025.pdf | 6 May 2025 |
| Declaration in FORM BFile: P52100031091_FileName_6 (2).pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Sep 2024.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold inventory Dec- 2024.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold March 2025.pdf | 28 Apr 2025 |
| Declaration about Commencement CertificateFile: P52100031091_FileName_4.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form Sep 2024.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form Dec 2024.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form Mar 2025.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep 24.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 24.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar 25.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sep 2024.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Dec 2024.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate March 2025.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Sep 2024.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Dec 2024.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold March 2025.pdf | 23 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineer CERT 2A-2024-2025.pdf | 23 Apr 2025 |
| Declaration in FORM BFile: Form B.pdf | 21 Apr 2025 |
| Declaration about Commencement CertificateFile: Affidavit cum Declaration.pdf | 21 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2024 C.pdf | 1 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 1 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold details June 2024 c.pdf | 1 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE JUNE 2024 C.pdf | 1 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 29 Jul 2024 |
| CERSAI detailsFile: Cersai Report Decleretion.pdf | 22 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 22 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaretion Format A.pdf | 22 Jul 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200314281656_For_Asset_Based_Search_20_07_2024_17_31_33_902.pdf | 20 Jul 2024 |
| Declaration in FORM BFile: Notary.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC 2021.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE MARCH 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JUNE 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SEP 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE MARCH 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SEP 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JUNE 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE MARCH 2024.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE MARCH 2024.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC 2021.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate dec 2021.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate march 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate june 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate sep 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate sep 2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate dec2022.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate march 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate june 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate sep 2023.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate march 2024.pdf | 11 Jul 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BALBOA AVENUE | SURVEY NO 20 NEAR BONDVE LAWNS RAVET 412101 | 64 | Completed | Dec 2018 | Late, Feb 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 194 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep STAR VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAVET13,700+ in Pune
Filed coordinates, straight-line distance. 263 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: RAVIE KHILUMAL OCHANNI
Ravie Khilumal Ochanni has 4 registrations on MahaRERA, including BALBOA AVENUE PHASE 1 and STAR VISTA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if STAR VISTA is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of STAR VISTA?
The registered promoter entity is RAVIE KHILUMAL OCHANNI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in STAR VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against STAR VISTA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for STAR VISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at STAR VISTA?
The professionals named in the filing: Architect: SACHIN SUTAR; Engineer: KP BADGUJAR; Engineer: Vishal Jagadale; Engineer: Nikhil Shivade; Chartered Accountant: GOTHE DURANDE; Chartered Accountant: NPSR & associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in STAR VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback