STAR VISTA - MHADA

By RAVIE KHILUMAL OCHANNI

RG-MH-32257 · RERA P52100080257 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Litigation declared, 1 case
  • Completion date moved by 13 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
8 of 8Construction stages doneevery applicable stage filed complete
23 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

STAR VISTA - MHADA is a Residential / Group Housing project by RAVIE KHILUMAL OCHANNI in Pune, Maharashtra, registered with MahaRERA as P52100080257 on 15 May 2025. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 13 months from the original filing. 5 of the 28 units on this registration are recorded sold or booked, and 8 of 8 construction stages are filed complete.

At a glance

Project

  • NameSTAR VISTA - MHADA
  • TypeResidential / Group Housing
  • Location
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080257
  • ReraGenie IDRG-MH-32257

Builder

  • NameRAVIE KHILUMAL OCHANNI
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredMay 2025First promiseAug 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2025
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed59 files

Current status

18%5 of 28 units booked
61.1%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MHADANA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 8 construction stages are filed complete.

MHADA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYesNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered14
Open Space18

Land and ownership28

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,655 sq m
Land owned byNot the promoter
Named landowners28
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Dec 2025
LandownerVillageDistrict
Baban Daatu alias Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Mrs. Lilabai Baban BhondvePimpri Chinchawad (M Corp.)Pune
Mrs. Vaishali Ravindranath ShindePimpri Chinchawad (M Corp.)Pune
Rupali Rajesh WanjalePimpri Chinchawad (M Corp.)Pune
Makrand Baban BhondvePimpri Chinchawad (M Corp.)Pune
Madhukar Dattu alias DattatrayPimpri Chinchawad (M Corp.)Pune
Vijaya Madhukar BhondvePimpri Chinchawad (M Corp.)Pune
Shubhangi Santosh JadhavPimpri Chinchawad (M Corp.)Pune
Shital Somnath NalavadePimpri Chinchawad (M Corp.)Pune
Sandeep Madhukar BhondvePimpri Chinchawad (M Corp.)Pune
Sachin Madhukar BhondvePimpri Chinchawad (M Corp.)Pune
Shivaji Dattu alias Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Vimal Shivaji BhondvePimpri Chinchawad (M Corp.)Pune
Pronima Avinash JadhavPimpri Chinchawad (M Corp.)Pune
Ganesh Shivaji BhondvePimpri Chinchawad (M Corp.)Pune
Shubham Vilas BhondvePimpri Chinchawad (M Corp.)Pune
Rajashree Vilas BhondvePimpri Chinchawad (M Corp.)Pune
Tejashree Vilas BhondvePimpri Chinchawad (M Corp.)Pune
Babasaheb Dattu ailas Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Sita Babasaheb BhondvePimpri Chinchawad (M Corp.)Pune
Girish Babasaheb BhondvePimpri Chinchawad (M Corp.)Pune
Ms.Snehal Babasaheb BhondvePimpri Chinchawad (M Corp.)Pune
Ranjana Sudam BhondvePimpri Chinchawad (M Corp.)Pune
Sunil Sudam BhondvePimpri Chinchawad (M Corp.)Pune
Anil Sudam BhondvePimpri Chinchawad (M Corp.)Pune
Yogesh Sudam BhondvePimpri Chinchawad (M Corp.)Pune
RANJEET ASHOK GAWALIPune (M Corp.)Pune
Umesh Gangaram ChangudePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI2217.99
Proposed, not sanctioned2,218 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD. SR.NO. 90, LAKSHADEEP P ALACE SHOP NO.-1, PIMPLE SAUDAGAR, AUNDH CAMP, PUNE, MAHARASHTRA 411027
Estimated costRs 7.55 cr
Cost incurredRs 4.61 cr
Work done61.07%
BuildingWingEstimatedIncurred
MHADANARs 7.50 crRs 4.60 cr
-NARs 5.00 lakhRs 1.44 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SUTAR
EngineerNIKHIL SHIVADE
EngineerVishal Jagadale
Chartered AccountantGOTHE DURANDE
Chartered AccountantNPSR & Associates
Chartered AccountantC A Ganesh Sunil Mandlecha
PartnerRole in project
RAVIE KHILUMAL OCHANNI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15122518687Aug 2025 → Sep 2026

Reason as filed by the promoterWith reference to the above-mentioned project registered with MahaRERA under Registration No. P52100080257, we hereby submit the CPM-PERT statement along with this application and respectfully request for extension of the project registration. We wish to inform the Authority that all construction activities of the project have been completed in all respects. The project is now at the final statutory stage, and the only remaining milestone is receipt of the Completion Certificate (CC) from the competent authority. The application for Completion Certificate has already been submitted to the conc

Litigation declared1

CaseCourtStatus
760/2012/2012PIMPRI COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certifcate - MHADA.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate.pdf16 Jul 2026
Withdrawal Update Form 3File: form 3 scan without B_compressed.pdf16 Jul 2026
Withdrawal Update Form 1File: Architect Certifcate mhada bunglow 1 2.pdf13 Jul 2026
Withdrawal Update Form 2File: FORM 2 NEW.pdf13 Jul 2026
Withdrawal Update Form 3File: FORM 3 NEW SCAN WITH SIGN.pdf13 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A (1) (1).pdf10 Jul 2026
Withdrawal Update Form 1File: Architect Certifcate - MHADA.pdf9 Jul 2026
Withdrawal Update Form 2File: form 2 mhada.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3 WITH SIGN.pdf9 Jul 2026
Withdrawal Update Form 1File: Form 1 - Mhada as on 31_12_2025.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 - Mhada as on 31_12_2025.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 Q4 with sign.pdf30 May 2026
Withdrawal Update Form 1File: 30-09-2025 MHADA.pdf15 Dec 2025
Withdrawal Update Form 2File: Document 18.pdf15 Dec 2025
Withdrawal Update Form 3File: FORM 3 With sign.pdf15 Dec 2025
Form 1File: Form 1 MHADA.pdf6 Dec 2025
Form 2File: form 2.pdf6 Dec 2025
Form 3File: Form 3 MHADA with sign correct_11zon.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled 30-06-2025.pdf6 Dec 2025
Other - LegalFile: akram Choudhary_11zon.pdf3 Apr 2025
Other - LegalFile: Srsale deed 8715 2015_11zon.pdf3 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (16).pdf22 Jan 2025
Other - FinanceFile: CA Cost zero clarification.pdf22 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (22 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured and unsecured loan.pdf22 Jan 2025
Copy of the legal title reportFile: 1 Copy of the legal title report (9) (1).pdf7 Dec 2024
Other - TechnicalFile: Declaration.pdf21 Nov 2024
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cert.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate MHADA (1).pdf20 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Agreement Deviation.pdf16 Aug 2024
Proforma of Agreement for saleFile: Agreement for Star Vista.pdf16 Aug 2024
Details of encumbrances concerned to FinanceFile: Financial Declaration.pdf14 Aug 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf14 Aug 2024
Other - LegalFile: Legal Encumbrance.pdf14 Aug 2024
Details of encumbrances concerned to LegalFile: Financial Declaration.pdf14 Aug 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf14 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest by 2.pdf14 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest by 1.pdf14 Aug 2024
Declaration in FORM BFile: FORMAT B.pdf10 Aug 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf8 Aug 2024
Deviation Report with respect to Allotment letterFile: No deviation Allotment letter.pdf6 Aug 2024
Deviation Report with respect to model copy of AgreementFile: No deviation agreement to sale.pdf6 Aug 2024
Layout approvalFile: Layout (2).pdf1 Aug 2024
Building plan approvalFile: MHADA PLAN.pdf1 Aug 2024
PAN CardFile: Ravie Pancard.pdf1 Aug 2024
Copy of Layout Approval (in case of layout)File: Layout (2).pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Architect_Certificate-Mhada-1_compressed.pdf1 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf1 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER STAR VISTA-compressed.pdf1 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MHADA PLAN.pdf1 Aug 2024
Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf1 Aug 2024
CERSAI detailsFile: Cresai.pdf1 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: BUSINESS DECLARATION.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERTIFICATE ENGG.pdf1 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BALBOA AVENUESURVEY NO 20 NEAR BONDVE LAWNS RAVET 41210164CompletedDec 2018Late, Feb 2019

How this compares with Pune

18%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 13 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep STAR VISTA - MHADA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmSTAR VISTA - MHADACompleted 110Lapsed / revoked 51Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 287 registered projects within 2 km.

Builder: RAVIE KHILUMAL OCHANNI

Ravie Khilumal Ochanni has 4 registrations on MahaRERA, including BALBOA AVENUE PHASE 1 and STAR VISTA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if STAR VISTA - MHADA is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STAR VISTA - MHADA?

The registered promoter entity is RAVIE KHILUMAL OCHANNI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STAR VISTA - MHADA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STAR VISTA - MHADA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STAR VISTA - MHADA?

The professionals named in the filing: Architect: SACHIN SUTAR; Engineer: NIKHIL SHIVADE; Engineer: Vishal Jagadale; Chartered Accountant: GOTHE DURANDE; Chartered Accountant: NPSR & Associates; Chartered Accountant: C A Ganesh Sunil Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STAR VISTA - MHADA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STAR VISTA - MHADA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STAR VISTA - MHADA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.