Home / Browse projects / Mumbai Suburban, Maharashtra / Srushti Enclave

Registration lapsed Litigation declared Residential / Group Housing project

Srushti Enclave

By Gadkari Builders & Associates

RG-MH-25277 · RERA P51900011095 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Litigation declared, 2 cases
  • 12 complaints at MahaRERA
  • Completion date moved by 72 months
  • 4 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
29 of 59Units unsoldnot recorded sold or booked
12Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Srushti Enclave is a Residential / Group Housing project by Gadkari Builders & Associates in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51900011095 on 31 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing. 30 of the 59 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 12 complaints are on record with the regulator.

At a glance

Project

  • NameSrushti Enclave
  • TypeResidential / Group Housing
  • Location
    • Subhash Nagar
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900011095
  • ReraGenie IDRG-MH-25277

Builder

  • NameGadkari Builders & Associates
  • Entity typePartnership
  • PartnerMangesha Jaideep Gadkari
  • PartnerJaideep Suryakant Gadkari
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed90 files

Current status

51%30 of 59 units booked
100.5%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Srushti EnclaveNA161659059

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Srushti Enclave: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area742 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Dec 2025

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI5053.0
Proposed, not sanctioned5,052 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSir P M Road, Fort, Mumbai
Estimated costRs 42.15 cr
Cost incurredRs 42.36 cr
Work done100.5%
BuildingWingEstimatedIncurred
-NARs 22.33 crRs 23.35 cr
Srushti EnclaveNARs 19.82 crRs 19.01 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Saee Itkhede
ArchitectIcon Architect & Engineers
EngineerR C Tipnis tipnis
EngineerER NIVRUTI DALVI
Chartered AccountantP H Chaudhari
Chartered AccountantMAHENDRA TILAK
PartnerRole in project
Gadkari Builders & Associates-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005230Dec 2019 → Dec 2020

Reason as filed by the promoterApproval from MHADA pending

EXT51800010094Dec 2019 → Dec 2023

Reason as filed by the promoterWe have faced many difficulties since the project started, Covid 19 , delay in approval from a government authority, financial problems, and because the project is expired in 2019 we are not able to sell the pending flats, once we get the extension we are able to sell the pending flats and to complete the project at the earliest.

EXT51800019108Dec 2019 → Jun 2025

Reason as filed by the promoter1. In 2020 due to the Pandemic situation of COVID-19 and the lockdown imposed by the government, we could not proceed with the construction activities. 2. Also, due to the pandemic, there was a shortage of Materials, Labour and transportation services. 3. After the impact of the pandemic, the increasing prices of construction materials such as cement, steel, copper, electrical, plumping and paints resulted in the shortage of the progress of new multi-storied apartment projects. We suffering from delays in terms of the number of months it takes for the arrival of the Construction Material on th

EA30062501863Dec 2019 → Dec 2025

Reason as filed by the promotera. An explanatory note setting out the grounds and reasons for the delay in the completion of the real estate project 1. In 2020 due to the Pandemic situation of COVID-19 and the lockdown imposed by the government, we could not proceed with the construction activities. 2. Also, due to the pandemic, there was a shortage of Materials, Labour and transportation services. 3. After the impact of the pandemic, the increasing prices of construction materials such as cement, steel, copper, electrical, plumping and paints resulted in the shortage of the progress of new multi-storied apartment projects.

Litigation declared2

CaseCourtStatus
1763/2017RERAClosed
WPL/4178/2018Bombay High CourtOngoing

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000023437LEKHARAJAU VENKATA NAGARAJA RAOM/S Gadkari Builders and Associates21/02/2018
CC006000000001763Durgaprasad Gundopant TambulwadkarGadkari Builders & Associates20/11/2017
CC006000000056142Shrikrishna KulkarniGadkari Builder and Associates10/09/2018
CC006000000056153Amit SaxenaGadkari Builder and Associates10/09/2018
CC006000000056155Pallavi OtawkarGadkari Builder and Associates10/09/2018
CC006000000056159Asavari OtawkarGadkari Builder and Associates10/09/2018
CC006000000056160Sameer WalishettyGadkari Builder and Associates10/09/2018
CC006000000056224Basawantray Shivappa HampanagoudurGadkari Builder and Associates16/09/2018
CC006000000056358Samir ThakkerGadkari Builders and Associates27/09/2018
CC006000000056565SHEETAL GADKARI, APARNA GADKARIM/s GADKARI BUILDERS AND ASSOCIATES14/10/2018
CC006000000089820Rajesh Tukaram BhatkarGadkari Builders and Associate22/06/2019
CC006000000195464Lekharaju Venkata Nagaraja RaoGadkari Builders & Associates31/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architects Certificate_March26.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate_March26.pdf29 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate_March26.pdf29 May 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate Dec25.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate Dec25.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec25.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate Dec25.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate Dec25.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec25.pdf28 Jan 2026
Withdrawal Update Form 1File: Form 1_Architectu0027s Certificate_Sept25.pdf16 Dec 2025
Withdrawal Update Form 2File: Form 2_Engineeru0027s Certificate_Sept25.pdf16 Dec 2025
Withdrawal Update Form 3File: Form 3_CA Certiifcate_Sept25.pdf16 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A - Site Supervisor Certificate - 2024 to 2025.pdf25 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ SRUSHTI ENCLAVE.pdf25 Sep 2025
Withdrawal Update Form 1File: Form 1_Architectu0027s Certificate _June25.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2_Engineer Certificate_June25.pdf5 Sep 2025
Withdrawal Update Form 3File: Form 3_CA Certificate_June25.pdf5 Sep 2025
Form 1File: FORM 1_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Form 2File: FORM 2_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Form 3File: FORM 3_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Withdrawal Update Form 1File: FORM 1_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Withdrawal Update Form 1File: FORM 1_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Withdrawal Update Form 2File: FORM 2_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Withdrawal Update Form 2File: FORM 2_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Withdrawal Update Form 3File: FORM 3_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Withdrawal Update Form 3File: FORM 3_MARCH 25_SHRUSHTI ENCLAVE_GADKARI.pdf30 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf18 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf18 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf18 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf18 Mar 2025
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf18 Mar 2025
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf18 Mar 2025
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf18 Mar 2025
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf18 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf18 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf18 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf18 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory.pdf18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Certificate - 2023 to 2024.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - Annual Statement of CA.pdf18 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Final.pdf25 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Structural Certificate.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A - Site Supervisor’s Certificate.pdf20 Feb 2024
Declaration in FORM BFile: Decleration Form B Promoter.pdf17 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf17 Feb 2024
CERSAI detailsFile: 1 Details of encumbrances.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Feb 2024
Certificates of CA (Form 3)File: FORM 3.pdf17 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate -2.pdf17 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate -2[5].pdf17 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf17 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decleration of Separate Bank Account.pdf17 Feb 2024
Declaration in FORM BFile: Srushti Enclave.pdf20 May 2023
Declaration in FORM BFile: Affidavit cum Declaration - Form B.pdf20 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineers Certificates.pdf20 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineers Certificates.pdf20 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineers Certificates.pdf20 May 2023
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate (Formate D).pdf18 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked (1).pdf18 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Audit Report - FY 2018-2019.pdf26 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 gakari 2019-20.pdf2 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 gadkari 2020-21.pdf2 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 gadkari 2021-22.pdf2 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - New.pdf23 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Architect Certificate.pdf23 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Structural Engineer Certificate.pdf23 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - CA Certificate - Srushti Enclave.pdf23 Aug 2022
Certificates of CA (Form 5)File: Scan 2.pdf1 Jan 2019
PAN CardFile: GBA Pancard - 1.pdf8 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC of Srushti.pdf8 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Amended Plan of Part OC - 9th Floor 1.pdf8 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Concession Report -Srushti_1(LV) part 1.pdf8 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Concession Report- Srushti_1 (LV)part 2.pdf8 Dec 2018
OtherFile: Concessional Plan_optimized.pdf8 Dec 2018
Building plan approvalFile: Amended Plan.PDF31 Jul 2017

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 72 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Srushti Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmSrushti EnclaveCompleted 139Lapsed / revoked 110Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: Gadkari Builders & Associates

Gadkari Builders & Associates has 2 registrations on MahaRERA, including Srushti Enclave and Gadkari Paradise. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Srushti Enclave shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Srushti Enclave is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Srushti Enclave?

The registered promoter entity is Gadkari Builders & Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Srushti Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Srushti Enclave?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Srushti Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Srushti Enclave?

The professionals named in the filing: Architect: Ar Saee Itkhede; Architect: Icon Architect & Engineers; Engineer: R C Tipnis tipnis; Engineer: ER NIVRUTI DALVI; Chartered Accountant: P H Chaudhari; Chartered Accountant: MAHENDRA TILAK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Srushti Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Srushti Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Srushti Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.