Home / Browse projects / Palghar, Maharashtra / SPANISH VILLA
SPANISH VILLA
By SHANTEE REALTY AND LIFE SPACE
RG-MH-29792 · RERA P99000029046 · Last updated on MahaRERA portal: 5 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SPANISH VILLA is a Residential / Group Housing project by SHANTEE REALTY AND LIFE SPACE in Palghar, Maharashtra, registered with MahaRERA as P99000029046 on 23 Apr 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameSPANISH VILLA
- TypeResidential / Group Housing
- Location
- VILL CHINCHOTI
- CHINCHOTI
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- RERA no.P99000029046
- ReraGenie IDRG-MH-29792
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Apr 2021
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CLUSTER 3 | NA | 17 | 0 | 0 | 0 | 0 |
| CLUSTER 4 | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
CLUSTER 391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLUSTER 491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| CLUSTER 3 | 14 | 14 |
| CLUSTER 4 | 16 | 16 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Himesh Gupta & Associates |
| Architect | Mufaddal Merchant |
| Engineer | Mohammed Shoeb bhati |
| Chartered Accountant | JINESH JOSHI |
| Chartered Accountant | HARESH MEHTA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHANTEE REALTY AND LIFE SPACE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Apr 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Apr 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 SAPNISH VILLA CL3 4.pdf | 5 Feb 2026 |
| Form 2File: FORM 2 SPANISH VILLA CL3 4.pdf | 5 Feb 2026 |
| Form 3File: FORM 3 SPANISH VILLA 3 4_compressed.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SPANISH VILLA C3-4.pdf | 5 Feb 2026 |
| Form 5 (FY 2024-2025)File: FORM-05 SPANISH VILLA CL 3 4.pdf | 1 Feb 2026 |
| Form 1File: FORM 1 SPANISH VILLA-3&4.pdf | 9 Nov 2025 |
| Form 2File: FORM 2 SPANISH VILLA 3&4.pdf | 9 Nov 2025 |
| Form 3File: FORM 3 SPANISH VILLA 3&4_compressed.pdf | 9 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SPANISH VILLA CL3-4.pdf | 9 Nov 2025 |
| Form 1File: FORM-1 SPANISH VILLA C- 3&4.pdf | 13 Aug 2025 |
| Form 2File: FORM-2 SPANISH VILLA C-3&4.pdf | 13 Aug 2025 |
| Form 3File: FORM-3 SPANISH VILLA CL3-4.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD & UNSOLD (SPANISH VILLA) 3 & 4.pdf | 13 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SPANISH VILLA 3-4.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA 3-4.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SPANISH VILLA 3-4 MAR 25.pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPANISH VILLA CL-3-4 FORM 1.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPANISH VILLA CL-3-4 FORM 3.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPANISH VILLA CL-3-4 FORM 3.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPANISH VILLA CL-3-4 FORM 2.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-3 SPANISH VILLA CL 3 AND 4.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPANISH VILLA CL-3AND4.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPANISH VILLA 3AND4.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SPANISH VILLA CL-3-4.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SPANISH VILLA CL-3-4.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPANISH VILLA 3AND4.pdf | 29 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A SPANISH VILLA CFC 31032024.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A SPANISH VILLA CL 3 AND 4 31032024.pdf | 8 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CL-3 AND 4.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA CL-3 AND 4.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: SPANISH VILLA-CL 3-4.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA CL 3 AND 4.pdf | 2 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 SPANISH VILLA CL3-4.pdf | 1 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CL 3-4.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA 3-4.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA 3-4.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CL 3_4 JUNE23.pdf | 25 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA CL3_4 JUN 23.pdf | 25 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA 3_4 JUN23.pdf | 25 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SPANISH VILLA CL-3-4.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 SPANISH VILLA PH-1 FY 20-21.pdf | 16 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SPANISH VILLA SOCIETY REGN.pdf | 27 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SPANISH VILLA CL-3-4.pdf | 9 Mar 2022 |
| OtherFile: SPANISH VILLA ELIMINATION LETTER.pdf | 29 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2 - SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SPANISH VILLA.pdf | 25 Nov 2021 |
| Layout approvalFile: REV DEV PERMISION.pdf | 2 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: REV DEV PERMISION.pdf | 2 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: REV DEV PERMISION.pdf | 2 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD SPANISH VILLA PH-2.pdf | 21 Aug 2021 |
| Layout approvalFile: COM CERTIFICATE.pdf | 16 Apr 2021 |
| Building plan approvalFile: LAYOUT REVISED.pdf | 16 Apr 2021 |
| PAN CardFile: PAN CARD.PDF | 16 Apr 2021 |
| Copy of the legal title reportFile: TITLE SERACH REPORT.pdf | 16 Apr 2021 |
| Details of encumbrancesFile: ENCUMBERANCE CERT.pdf | 16 Apr 2021 |
| Details of encumbrancesFile: ENCUMEBRANCE CERT CERTIFIED.pdf | 16 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: COM CERTIFICATE.pdf | 16 Apr 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT REVISED.pdf | 16 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COM CERTIFICATE.pdf | 16 Apr 2021 |
| Declaration in FORM BFile: FORM B.pdf | 16 Apr 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 16 Apr 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 16 Apr 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 16 Apr 2021 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE AND ALLOTMENT SPANISH VILLA.pdf | 16 Apr 2021 |
| OtherFile: BUILDER APOROVAL 1.pdf | 16 Apr 2021 |
| OtherFile: BUILDER APPROVAL 2.pdf | 16 Apr 2021 |
| OtherFile: OTHER CETI.pdf | 16 Apr 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SPANISH VILLA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHINCHOTI3,200+ in Palghar
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: SHANTEE REALTY AND LIFE SPACE
SHANTEE REALTY AND LIFE SPACE has 8 registrations on MahaRERA, including SPANISH RESIDENCY and SPANISH VILLA. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that SPANISH VILLA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SPANISH VILLA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SPANISH VILLA?
The registered promoter entity is SHANTEE REALTY AND LIFE SPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SPANISH VILLA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SPANISH VILLA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SPANISH VILLA?
The professionals named in the filing: Architect: Himesh Gupta & Associates; Architect: Mufaddal Merchant; Engineer: Mohammed Shoeb bhati; Chartered Accountant: JINESH JOSHI; Chartered Accountant: HARESH MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SPANISH VILLA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback