ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SPANISH VILLA

Registered No litigation declared Mixed project

SPANISH VILLA

By SHANTEE REALTY AND LIFE SPACE

RG-MH-30064 · RERA P99000029785 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
10 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

SPANISH VILLA is a Mixed project by SHANTEE REALTY AND LIFE SPACE in Palghar, Maharashtra, registered with MahaRERA as P99000029785 on 4 Jul 2021. Possession is promised by 31 Dec 2027. 0 of the 1 unit on this registration is recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSPANISH VILLA
  • TypeMixed
  • Location
    • CHINCHOTI
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000029785
  • ReraGenie IDRG-MH-30064

Builder

  • NameSHANTEE REALTY AND LIFE SPACE
  • Entity typePartnership
  • PartnerAyazmohammad Abdulsamad Pathan
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jul 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

0%0 of 1 units booked

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SPANISH VILLANA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

SPANISH VILLA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area171 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5260.07
Proposed, not sanctioned260 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAURYA SHOPING CENTRE, AMBADI ROAD, VASAI WEST

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHimesh Gupta & Associates
ArchitectMufaddal Merchant
EngineerMohammed Shoeb bhati
Chartered AccountantJINESH JOSHI
Chartered AccountantHARESH MEHTA AND ASSOCIATES
PartnerRole in project
SHANTEE REALTY AND LIFE SPACE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SPANISH VILLA CFC.pdf24 Apr 2026
Form 2File: FORM 2- SPANISH VILLA CFC BLDG.pdf24 Apr 2026
Form 3File: FORM-03 SPANISH VILLA CFC.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: SPANISH VILLA CFC BLDG -DISCLOSURE OF INVENTORY.pdf24 Apr 2026
Form 1File: FORM 1 SPANISH VILLA CFC.pdf5 Feb 2026
Form 2File: FORM 2 SPANISH VILLA CFC BLDG.pdf5 Feb 2026
Form 3File: FORM 3 SPANISH VILLA CFC.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SPANISH VILLA CFC.pdf5 Feb 2026
Form 5 (FY 2024-2025)File: FORM-05 SPANISH VILLA CFC.pdf1 Feb 2026
Form 1File: FORM 1 SPANISH VILLA CFC.pdf9 Nov 2025
Form 2File: FORM 2 SPANISH VILLA CFC.pdf9 Nov 2025
Form 3File: FORM 3 SPANISH VILLA CFC.pdf9 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SPANISH VILLA CFC.pdf9 Nov 2025
Form 1File: FORM-1 SPANISH VILLA CFC.pdf13 Aug 2025
Form 2File: FORM-2 SPANISH VILLA CFC.pdf13 Aug 2025
Form 3File: FORM-3 SPANISH VILLA CFC.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD & UNSOLD (SPANISH VILLA) CFC.pdf13 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SPANISH VILLA CFC.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA CFC.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SPANISH VILLA CFC MAR 25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPANISH VILLA CFC FORM 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPANISH VILLA CFC FORM 3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPANISH VILLA CFC FORM 2.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 LIFE SPACE SPANISH VILLA CFC.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPANISH VILLA CFC.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPANISH VILLA CFC BUILDING.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPANISH VILLA CFC BUILDING.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPANISH VILLA CFC.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPANISH VILLA CFC.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: SPANISH VILLA CFC.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPANISH VILLA CFC.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CFC.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA CFC.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: SPANISH VILLA CFC.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA CFC.pdf2 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 LIFE SPACE SPANISH VILLA CFC BUILDING.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CFC.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA CFC.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA CFC.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CFC.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA CFC.pdf25 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SPANISH VILLA CFC JUN23.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SPANISH VILLA CFC.pdf21 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SPANISH VILLA SOCIETY REGN.pdf27 Apr 2022
Disclosure of sold/ booked inventoryFile: SPANISH VILLA CFC BLDG.pdf8 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SPANISH VILLA 2.pdf25 Nov 2021
Copy of the legal title reportFile: TITLE FORMAT A.pdf29 Jun 2021
Declaration about Commencement CertificateFile: CC DECLARATION FORMAT D VILLA.pdf29 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SPANISH VILLA CFC.pdf29 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SPANISH VILLA CFC.pdf29 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CFC.pdf29 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC CFC BLDG.pdf17 Jun 2021
Building plan approval or NA orderFile: APPROVED PLAN.pdf13 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN.pdf13 Jun 2021
Declaration in FORM BFile: FORM-B.pdf13 Jun 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE AND ALLOTMENT SPANISH VILLA.pdf13 Jun 2021
Layout approvalFile: APPROVED PLAN.pdf11 Jun 2021
Details of encumbrancesFile: ENCUMBERANCE CERT.pdf11 Jun 2021
Details of encumbrancesFile: ENCUMBRANCE CERT 2.pdf11 Jun 2021
Copy of Layout Approval (in case of layout)File: APPROVED PLAN.pdf11 Jun 2021
PAN CardFile: PAN CARD SHANTEE REALTY.PDF10 Jun 2021
Copy of the legal title reportFile: TITLE SERACH REPORT.pdf10 Jun 2021

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPANISH VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHINCHOTI3,200+ in Palghar

Builder: SHANTEE REALTY AND LIFE SPACE

SHANTEE REALTY AND LIFE SPACE has 8 registrations on MahaRERA, including SPANISH RESIDENCY and SPANISH VILLA. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SPANISH VILLA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPANISH VILLA?

The registered promoter entity is SHANTEE REALTY AND LIFE SPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPANISH VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPANISH VILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPANISH VILLA?

The professionals named in the filing: Architect: Himesh Gupta & Associates; Architect: Mufaddal Merchant; Engineer: Mohammed Shoeb bhati; Chartered Accountant: JINESH JOSHI; Chartered Accountant: HARESH MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPANISH VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPANISH VILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPANISH VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.