Home / Browse projects / Spandan

Registered No litigation declared Residential / Group Housing project

Spandan

By Evolve Infra

RG-MH-59549 · RERA P52100053983 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Oct 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 95%
19 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Spandan is a Residential / Group Housing project by Evolve Infra in Vadgaonsheri, 411014, registered with MahaRERA as P52100053983 on 18 Dec 2023. Possession is promised by 16 Oct 2026. 5 of the 24 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSpandan
  • TypeResidential / Group Housing
  • Location
    • -
    • Vadgaonsheri
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053983
  • ReraGenie IDRG-MH-59549

Builder

  • NameEvolve Infra
  • Entity typePartnership
  • PartnersNawaz Ahmed Babajan Almelkar, Babajan Rajmohammad Almelkar

Key dates

this monthRegisteredDec 2023PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion16 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

21%5 of 24 units booked
45.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SpandanNA6424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

Spandan: 56% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor85%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes5%
Landscaping & Tree PlantingYes5%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes5%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes5%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered1
Open Space10

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area912 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Dec 2025
LandownerVillageDistrict
Vasant Dhondiba Galande-Pune
Gajrabai Vaman TapkirPune (CB)Pune
Ganesh Vaman TapkirPune (CB)Pune
Shankar Vaman TapkirPune (CB)Pune
Vishnu Vaman TapkirPune (CB)Pune
Jayshree Dattatray BotreDEHUPune
Parvati Kaluram LukarPimpri Chinchawad (M Corp.)Pune
Ganga Ramesh Undre-Pune
Vaishali Kalidas ShelarMalwadiPune
Manda Vaman TapkirPune (CB)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1569.5
Proposed, not sanctioned1,570 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSupport Service Building, Kalyani Nagar, Pune 411014
Estimated costRs 7.22 cr
Cost incurredRs 3.25 cr
Work done44.99%
BuildingWingEstimatedIncurred
SpandanNARs 7.22 crRs 3.25 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak Patil
EngineerSheetal Jagtap
EngineerGovardhan Balbhim Gaikwad
Chartered AccountantRadhika Khandelwal & Associates
Chartered AccountantSCT & Company
Chartered AccountantMilani & Associates
PartnerRole in project
Evolve Infra-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 16 Oct 2026

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q3.pdf20 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 Q4.pdf20 Jun 2026
Layout approvalFile: REV 2 -PMC TDR PLAN 10-7-25 -SHEET 1 .pdf10 Dec 2025
Building plan approvalFile: REV 2 -PMC TDR PLAN 10-7-25 -SHEET 1 .pdf10 Dec 2025
Building plan approvalFile: REV 2 -PMC TDR PLAN 10-7-25 -SHEET 2 .pdf10 Dec 2025
Layout approvalFile: REV 2 -PMC TDR PLAN 10-7-25 -SHEET 1 .pdf10 Dec 2025
Building plan approvalFile: REV 2 -PMC TDR PLAN 10-7-25 -SHEET 1 .pdf10 Dec 2025
Building plan approvalFile: REV 2 -PMC TDR PLAN 10-7-25 -SHEET 2 .pdf10 Dec 2025
Withdrawal Update Form 1File: Form 1 Q1.pdf10 Dec 2025
Withdrawal Update Form 1File: Form 1 Q2.pdf10 Dec 2025
Withdrawal Update Form 2File: Form 2 Q1.pdf10 Dec 2025
Withdrawal Update Form 2File: Form 2 Q2.pdf10 Dec 2025
Withdrawal Update Form 3File: Form 3 Q1 Evolve_compressed.pdf10 Dec 2025
Withdrawal Update Form 3File: Form 3 Q2_compressed.pdf10 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Evolve Infra_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Evolve Infra.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2_compressed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosur of Sold Booked inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 Architect Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2 Engineer Certificate _compressed.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked inventory.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form no 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration Regarding no withdrawal.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Evolve Infra.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration for Withdrawal.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Govardhan Gaikwad .pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration No Withdrawals.pdf14 Mar 2024
Copy of the legal title reportFile: Evolve Infra-Legal Title Report.pdf20 Nov 2023
Copy of the legal title reportFile: Evolve Infra-Flow of Title.pdf20 Nov 2023
Copy of the legal title reportFile: Evolve Infra-Search Report.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Nov 2023
Proforma of Agreement for saleFile: Draft Agreement.pdf9 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf9 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf8 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf8 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf8 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf8 Nov 2023
Declaration about Commencement CertificateFile: DECLARATION CC.pdf8 Nov 2023
Declaration in FORM BFile: Form B.pdf8 Nov 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf8 Nov 2023
Deviation Report with respect to Allotment letterFile: Deviation Modifications in the Proforma of Agreement_compressed.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf1 Nov 2023
Layout approvalFile: Sanction Plan 1.pdf29 Oct 2023
Building plan approvalFile: Sanction Plan 2.pdf29 Oct 2023
PAN CardFile: PAN - Evolve Infra.pdf29 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf29 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrances Legal.pdf29 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf29 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrances Legal.pdf29 Oct 2023
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf29 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf29 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Oct 2023
CERSAI detailsFile: Cersai Report Security Interest on the project.pdf29 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure OREO.pdf29 Oct 2023
Proforma of Allotment letterFile: Draft Allotment.pdf29 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement to Sale_compressed.pdf29 Oct 2023

Keep Spandan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vadgaonsheri

2 kmSpandanCompleted 3Lapsed / revoked 1Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: Evolve Infra

Evolve Infra has 1 registration on MahaRERA, including Spandan. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Spandan is delayed beyond 16 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Spandan?

The registered promoter entity is Evolve Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Spandan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Spandan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Spandan?

The professionals named in the filing: Architect: Deepak Patil; Engineer: Sheetal Jagtap; Engineer: Govardhan Balbhim Gaikwad; Chartered Accountant: Radhika Khandelwal & Associates; Chartered Accountant: SCT & Company; Chartered Accountant: Milani & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Spandan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Spandan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Spandan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.