Registration lapsed No litigation declared Residential / Group Housing project

SKY VILLAS - B Wing

By K N DEVELOPERS AND ENGINEERS LLP

RG-MH-29287 · RERA P52000028114 · Last updated on MahaRERA portal: 8 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
7 of 11Construction stages donefurthest along: Internal walls, 98%
4 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

SKY VILLAS - B Wing is a Residential / Group Housing project by K N DEVELOPERS AND ENGINEERS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000028114 on 4 Feb 2021. Possession was promised by 31 Jul 2025 and is now 15 months past that date. The completion date has moved by 12 months from the original filing. 42 of the 46 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSKY VILLAS - B Wing
  • TypeResidential / Group Housing
  • Location
    • MOTIRAM TALAO ROAD
    • SAKHARAM SHASTRI BHAVE NAGAR
    • Pen (M Cl)
    • Pen
    • Raigarh
    • 402107
  • Pincode402107
  • RERA no.P52000028114
  • ReraGenie IDRG-MH-29287

Builder

  • NameK N DEVELOPERS AND ENGINEERS LLP
  • Entity typePartnership
  • GSTIN27AATFK5419Q1ZD
  • PartnersMANSI MANDAR KARANDIKAR, MANDAR MADHUKAR KARANDIKAR
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

15 months past promisethis monthRegisteredFeb 2021First promiseJul 2024Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Feb 2021
  • Promised completion31 Jul 2025
  • Revised completionRevised to 31 Jul 2025 (originally 31 Jul 2024)
  • Buildings1 building record
  • Documents filed127 files

Current status

91%42 of 46 units booked

Figures as on 8 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA171646046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

WING B: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered6
Open Space10

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,722 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2026

Approvals and building plan

Sanctioning authorityPEN MUNCIPAL COUNCIL
Permissible FSI12642.11
Proposed, not sanctioned12,642 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 6, PATHARE BLDG GOKHALE ROAD NAUPADA THANE 400604

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFINER EDGE
EngineerMANGESH B MHATRE
Chartered AccountantCA UMANG SONI
Chartered AccountantRishi Deshmukh & Co
PartnerRole in project
K N DEVELOPERS AND ENGINEERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024455Jul 2024 → Jul 2025

Reason as filed by the promoterWe are pleased to inform you that the construction phase of the project on the verge of completion. However, we are currently facing an unavoidable delay in obtaining the necessary statutory permissions. For your reference, we have attached an architect certificate attesting to the 98% completion of the construction work. We are also applying for 0C to Pen Municipal Corporation. The delay in acquiring the statutory permissions is primarily due to the procedural complexities involved in the approval process. Despite our earnest efforts and continuous follow-ups with the relevant authorities, we

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Mar 2025

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-2 - Form 3_Mar25 signed.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate -II (31032025).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate-II(31032025).pdf16 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC WING B.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect-II.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase 2 SIGNED_1.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engiII.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-2 - Form 3_Sep24_signed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Phase Q3 Phase-4.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-2 - Form 3_Sep24_signed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Phase Q3 Phase-4.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MAHARERA_Form 5 - Annual Report_Phase II_Signed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MAHARERA_Form 5 - Annual Report_Phase II_Signed.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -II.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate II.pdf9 Aug 2024
Declaration in FORM BFile: Phase2_Form B.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase2_Architect Certificate.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase2_Engineers Certificate.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: Phase2_Disclosure of Sold unsold.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Phase-II.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate-II.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ph2 Signed_1.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 2_merged.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance - II - Cert - 2024.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH2.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH2.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sky villa phase 2 engineer certificate.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase-2 - Architect Certificate.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase-2 - Engineers Certificate.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - II - Cert - 2023.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MAHARERA_Form 5 - Annual Report_Phase II_2.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-2 - Form 3_Sep23 SIGNED_1.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH2 Architect certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE P3.pdf20 Oct 2023
Building plan approvalFile: Layout Approval 1_with highlighting change.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Approval 1_with highlighting change.pdf29 May 2023
Commencement Certificates / NA Order for plotted developmentFile: B Wing - Commencement Certificate_highlighted Change.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance - II - Cert - 2021.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - II - Cert -2022.pdf29 May 2023
Disclosure of sold/ booked inventoryFile: Wing B - Disclosure of Sold Inventory.pdf29 May 2023
Building plan approvalFile: Layout Approval 1.pdf12 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Approval 1.pdf12 May 2023
Declaration about Commencement CertificateFile: B Wing - Declaration about Commencement Certificate.pdf12 May 2023
Declaration in FORM BFile: B Wing - Declaration in FORM B.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B Wing - Architect Certificate.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B Wing - Engineer’s Certificate.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-2 - Form 3_merged signed_1.pdf12 May 2023
Proforma of Agreement for saleFile: B Wing - Agreement for Sales.pdf12 May 2023
Proforma of Allotment letterFile: B Wing - Proforma of Allotment letter.pdf12 May 2023
Deviation Report with respect to model copy of AgreementFile: B Wing - Deviation Report with respect to model copy of Agreement.pdf12 May 2023
Details of encumbrancesFile: B Wing - No encumbrances Letter.pdf10 May 2023
Details of encumbrances concerned to FinanceFile: B Wing - No encumbrances Letter.pdf10 May 2023
Details of encumbrances concerned to LegalFile: B Wing - No encumbrances Letter.pdf10 May 2023
Declaration about Commencement CertificateFile: B Wing - Declaration about Commencement Certificate.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B Wing - Engineer’s Certificate.pdf10 May 2023
CERSAI detailsFile: B Wing - CERSAI details.pdf10 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: B Wing - Separate Bank Account details including no encumbrances on the Bank Account or no10 May 2023
Deviation Report with respect to Allotment letterFile: B Wing - No Deviation Report with respect to Allotment letter.pdf10 May 2023
Layout approvalFile: Layout Approval 1.pdf28 Apr 2023
Layout approvalFile: Layout Approval 2.pdf28 Apr 2023
Layout approvalFile: Layout Approval 3.pdf28 Apr 2023
Layout approvalFile: Layout Approval 4.pdf28 Apr 2023
Layout approvalFile: Layout Approval 5.pdf28 Apr 2023
Layout approvalFile: Layout Approval 6.pdf28 Apr 2023
Layout approvalFile: Layout Approval 7.pdf28 Apr 2023
Layout approvalFile: Layout Approval 8.pdf28 Apr 2023
Layout approvalFile: Layout Approval 9.pdf28 Apr 2023
Building plan approvalFile: Phase 4 - Commencement Certificate.pdf28 Apr 2023
Building plan approvalFile: Phase 4 - Commencement Certificate_renewal.pdf28 Apr 2023
Copy of the legal title reportFile: Phase 3 - Title Report 78A.pdf28 Apr 2023
Copy of the legal title reportFile: Phase 3 - Title Report 78B.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 1.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 2.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 3.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 4.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 5.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 6.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 7.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Approval 8.pdf28 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SKY VILLAS PHASE-IV-C WINGP52000051183SAKHARAM SHASTRI BHAVE NAGAR, Raigarh100Jun 2023OngoingDec 2026Not due yet
SKY VILLAS - A WINGP52000025200SAKHARAM SHASTRI BHAVE NAGAR, Raigarh-Mar 2020CompletedDec 2024Registered original: Dec 2023May 2024

How this compares with Raigarh

91%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY VILLAS - B Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAKHARAM SHASTRI BHAVE NAGAR5,900+ in Raigarh

Builder: K N DEVELOPERS AND ENGINEERS LLP

K N DEVELOPERS AND ENGINEERS LLP has 4 registrations on MahaRERA, including SKY VILLAS - A WING and SKY VILLAS - B Wing. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that SKY VILLAS - B Wing shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SKY VILLAS - B Wing is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY VILLAS - B Wing?

The registered promoter entity is K N DEVELOPERS AND ENGINEERS LLP, a partnership as per the filing. Its GSTIN 27AATFK5419Q1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY VILLAS - B Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY VILLAS - B Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY VILLAS - B Wing?

The professionals named in the filing: Architect: FINER EDGE; Engineer: MANGESH B MHATRE; Chartered Accountant: CA UMANG SONI; Chartered Accountant: Rishi Deshmukh & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY VILLAS - B Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY VILLAS - B Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY VILLAS - B Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.