Home / Browse projects / Raigarh, Maharashtra / GOKUL
GOKUL
By SUYASH BUILDERS AND DEVELOPERS
RG-MH-86791 · RERA P52000018431 · Last updated on MahaRERA portal: 1 Apr 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 17 months
- 1 extension taken
- Rs 10.00 crore secured on the land, in favour of ADITYA BIRLA FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOKUL is a Others project by SUYASH BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000018431 on 1 Nov 2018. The registration is recorded completed; possession was promised by 6 Mar 2026. The completion date has moved by 17 months from the original filing. 225 of the 245 units on this registration are recorded sold or booked, and 33 of 44 construction stages are filed complete.
At a glance
Project
- NameGOKUL
- TypeOthers
- Location
- CHINCHPADA ROAD
- PEN
- Pen (M Cl)
- Raigarh
- 402107
- Pincode402107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000018431
- ReraGenie IDRG-MH-86791
Builder
- NameSUYASH BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersDASHARATH PANDHARINATH SHINGADE, MRS VANDANA DASHARATH SHINGADE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Nov 2018
- Promised completion6 Mar 2026
- Revised completionRevised to 6 Mar 2026 (originally 30 Oct 2024)
- Buildings4 building records
- Documents filed248 files
Current status
Figures as on 1 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 13 | 11 | 88 | 0 | 88 |
| B WING | NA | 16 | 0 | 56 | 0 | 56 |
| C WING | NA | 13 | 0 | 88 | 0 | 88 |
| COMMERCIAL | NA | 1 | 1 | 0 | 13 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 1 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 60%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
COMMERCIAL40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 27% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 11% |
Progress on shared amenities17
As on 1 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 75% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 25% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Others options to add more | Yes | 80% |
| Others | Yes | 80% |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A WING | 20 | 8 | 28 |
| B WING | 5 | 7 | 12 |
| C WING | 20 | 8 | 28 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SOPAN PRABHU |
| Engineer | SAURABH DASHRATH SHINGADE |
| Chartered Accountant | VIKKI RAMBHAU SAID |
| Chartered Accountant | HITESH CHANDRA |
| Partner | Role in project |
|---|---|
| SUYASH BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority (MahaRERA) Mumbai Subject: Request for Extension of Project Completion Date for GOKUL (Maha RERA Registration No. P52000018431) Dear Sir/Madam, I am Mr. Dashrath Pandharinath Shingade Partner of Suyash Builders And Developers regarding the project of GOKUL registered under Maha RERA with Registration No. P52000018431 Located in Pen, Maharastra.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Nov 2024
Documents filed248
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 248 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 1 Apr 2026 |
| Form 1File: Form - 1.pdf | 4 Mar 2026 |
| Form 2File: Form -2.pdf | 4 Mar 2026 |
| Form 3File: Form-3_c.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf | 4 Mar 2026 |
| Occupational CertificateFile: A wing OC.pdf | 4 Mar 2026 |
| Occupational CertificateFile: B wing OC copy.pdf | 4 Mar 2026 |
| Occupational CertificateFile: C wing OC copy.pdf | 4 Mar 2026 |
| Occupational CertificateFile: Full OC with commercial.pdf | 4 Mar 2026 |
| Form 1File: Form-1.pdf | 1 Dec 2025 |
| Form 2File: Form-2.pdf | 1 Dec 2025 |
| Form 3File: Form-3-c.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory.pdf | 1 Dec 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A FY 2024-25.pdf | 1 Dec 2025 |
| Form 2A (FY 2018-2019)File: Form 2A FY-2019-2020.pdf | 14 Oct 2025 |
| Form 2A (FY 2019-2020)File: Form 2A FY-2019-2020.pdf | 14 Oct 2025 |
| Form 2A (FY 2020-2021)File: Form 2A FY-2020-21.pdf | 14 Oct 2025 |
| Form 2A (FY 2021-2022)File: Form 2A FY-2021-22.pdf | 14 Oct 2025 |
| Form 2A (FY 2022-2023)File: Form 2A FY-2022-23.pdf | 14 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf | 14 Oct 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form-1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form-3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form-1 -.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Booked inventory.pdf | 23 Jul 2025 |
| Form 5 (FY 2019-2020)File: Form 5 2019-20.pdf | 23 Jul 2025 |
| Form 5 (FY 2020-2021)File: Form 5 2020-21.pdf | 23 Jul 2025 |
| Form 5 (FY 2021-2022)File: FORM-5 FY 2021-22.pdf | 23 Jul 2025 |
| Form 5 (FY 2022-2023)File: Form-5 FY 2022-23.pdf | 23 Jul 2025 |
| Form 5 (FY 2023-2024)File: Form -5 FY 2023-24.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: Form 2.pdf | 21 Jul 2025 |
| Form 3File: Form 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-booked inventory.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-booked inventory.pdf | 21 Jul 2025 |
| Form 1File: Form-1.pdf | 21 Jul 2025 |
| Form 2File: Form-2.pdf | 21 Jul 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 248 filed documents as one ZIP, foldered, with a manifest
Keep GOKUL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PEN5,900+ in Raigarh
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
HAWARE GRANDE
HAWARE GRANDE
KALINDI ELITE
KALINDI REALTORS PRIVATE LIMITED
OSCAR HEIGHTS
OSCAR BUILDERS
dbafna ONE
D Bafna Properties
MITHILA
SATHE SCHEMES LLP
TARUN PLANTATIONS COMPANY
TARUN PLANTATIONS COMPANY
See every Raigarh project, with the district possession charts
Builder: SUYASH BUILDERS AND DEVELOPERS
SUYASH BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including GOKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if GOKUL is delayed beyond 6 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOKUL?
The registered promoter entity is SUYASH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOKUL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOKUL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOKUL?
The professionals named in the filing: Architect: SOPAN PRABHU; Engineer: SAURABH DASHRATH SHINGADE; Chartered Accountant: VIKKI RAMBHAU SAID; Chartered Accountant: HITESH CHANDRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOKUL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback