ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / MITHILA

Registered No litigation declared Others project

MITHILA

By SATHE SCHEMES LLP

RG-MH-18770 · RERA P52000077580 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2030Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 50%
76 of 232Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 206 documents Report an error

MITHILA is a Others project by SATHE SCHEMES LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000077580 on 15 Oct 2024. Possession is promised by 31 May 2030. 156 of the 232 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameMITHILA
  • TypeOthers
  • Location
    • Pen Khopoli Road
    • Utkarsha Nagar
    • Pen (M Cl)
    • Pen
    • Raigarh
    • 402107
  • Pincode402107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077580
  • ReraGenie IDRG-MH-18770

Builder

  • NameSATHE SCHEMES LLP
  • Entity typeLimited Liability Partnership
  • LLPINACA-0445
  • Designated PartnersMadhura Uday Sathe, Uday Vishnu Sathe

Key dates

this monthRegisteredOct 2024PromisedMay 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2024
  • Promised completion31 May 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed206 files

Current status

67%156 of 232 units booked
71.9%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mithila Wing ANA161412412136
Mithila Wing BNA161496096

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 50%.

Mithila Wing A27%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Mithila Wing B32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed315

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots315
Closed/Covered239
Open Space76
BuildingClosed/CoveredOpen SpaceTotal
Mithila Wing A11439153
Mithila Wing B12537162

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,470 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPen nagarpalika
Permissible FSI16502.35
Proposed, not sanctioned16,502 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT POST GADABTALUKA PEN DIST RAIGAD
Estimated costRs 43.55 cr
Cost incurredRs 31.31 cr
Work done71.9%
BuildingWingEstimatedIncurred
Mithila Wing ANARs 24.03 crRs 16.82 cr
Mithila Wing BNARs 16.02 crRs 13.62 cr
-NARs 3.50 crRs 87.50 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKuldip R Hajare
EngineerMahesh Vishnu Chavan
Chartered AccountantHemal K Shah
Chartered AccountantDIVYA LALWANI & Co
Chartered AccountantKhushalani & Co
Chartered AccountantKhushlani & Co.
PartnerRole in project
SATHE SCHEMES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2030

Documents filed206

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 206 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26.pdf16 May 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf16 May 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf16 May 2026
Withdrawal Update Form 1File: Form 1-Dec 25.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2-Dec 25.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3-Dec 25.pdf9 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 (2024-25).pdf20 Dec 2025
Form 1File: Form-1 (31-12-2024).pdf11 Dec 2025
Form 2File: FORM 2_Engineer Certificate_Mithila_31122024_Q3.pdf11 Dec 2025
Form 3File: Form 3 - Mithila (02-01-2025) Q3.pdf11 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Detail_Dec-2024.pdf11 Dec 2025
Form 1File: Form-1 (31-03-2025).pdf11 Dec 2025
Form 2File: FORM 2_Engineer Certificate_Mithila_31032025_Q4.pdf11 Dec 2025
Form 3File: Form 3 - Mithila (23-04-2025) Q4.pdf11 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Detail_Mar-2025.pdf11 Dec 2025
Withdrawal Update Form 1File: Form-1 (30-09-2025).pdf9 Dec 2025
Withdrawal Update Form 1File: Form-1 (30-06-2025).pdf9 Dec 2025
Withdrawal Update Form 2File: FORM 2_Engineer Certificate_Mithila_30092025_Q2.pdf9 Dec 2025
Withdrawal Update Form 2File: FORM 2_Engineer Certificate_Mithila_30062025_Q1.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 - Q2_2025-26_.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 - Q1_2025-26 June.pdf9 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-March 25.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-March 25.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-March 25.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf8 Jan 2025
Proforma of Allotment letterFile: Allotment letter.pdf9 Oct 2024
Proforma of Allotment letterFile: Allotment letter.pdf9 Oct 2024
Proforma of Allotment letterFile: Allotment letter.pdf9 Oct 2024
Proforma of Allotment letterFile: Allotment letter.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: RECREATIONAL STRUCTURE CC ORDER.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf6 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: RECREATIONAL STRUCTURE CC ORDER.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf6 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: RECREATIONAL STRUCTURE CC ORDER.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf6 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: RECREATIONAL STRUCTURE CC ORDER.pdf6 Oct 2024
Declaration in FORM BFile: Form B.pdf2 Aug 2024
Declaration in FORM BFile: Form B.pdf2 Aug 2024
Declaration in FORM BFile: Form B.pdf2 Aug 2024
Building plan approvalFile: CC PLAN_8.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_7.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_6.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_5.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_4.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_3.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_2.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_1.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_8.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_7.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_6.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_5.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_4.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_3.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_2.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_1.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_8.pdf1 Aug 2024
Building plan approvalFile: CC PLAN_7.pdf1 Aug 2024

How this compares with Raigarh

67%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MITHILA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Utkarsha Nagar5,900+ in Raigarh

2 kmMITHILACompleted 49Lapsed / revoked 19Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: SATHE SCHEMES LLP

SATHE SCHEMES LLP has 1 registration on MahaRERA, including MITHILA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MITHILA is delayed beyond 31 May 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MITHILA?

The registered promoter entity is SATHE SCHEMES LLP, a limited liability partnership as per the filing. Its LLPIN ACA-0445 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MITHILA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MITHILA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MITHILA?

The professionals named in the filing: Architect: Kuldip R Hajare; Engineer: Mahesh Vishnu Chavan; Chartered Accountant: Hemal K Shah; Chartered Accountant: DIVYA LALWANI & Co; Chartered Accountant: Khushalani & Co; Chartered Accountant: Khushlani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MITHILA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MITHILA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MITHILA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.