Home / Browse projects / Raigarh, Maharashtra / SKY VILLAS - A WING

Completed No litigation declared Residential / Group Housing project

SKY VILLAS - A WING

By K N DEVELOPERS AND ENGINEERS LLP

RG-MH-28261 · RERA P52000025200 · Last updated on MahaRERA portal: 19 Oct 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

SKY VILLAS - A WING is a Residential / Group Housing project by K N DEVELOPERS AND ENGINEERS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000025200 on 23 Mar 2020. The registration is recorded completed; possession was promised by 28 Dec 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSKY VILLAS - A WING
  • TypeResidential / Group Housing
  • Location
    • MOTIRAM TALAO ROAD
    • SAKHARAM SHASTRI BHAVE NAGAR
    • Pen (M Cl)
    • Pen
    • Raigarh
    • 402107
  • Pincode402107
  • RERA no.P52000025200
  • ReraGenie IDRG-MH-28261

Builder

  • NameK N DEVELOPERS AND ENGINEERS LLP
  • Entity typePartnership
  • GSTIN27AATFK5419Q1ZD
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMANSI MANDAR KARANDIKAR, MANDAR MADHUKAR KARANDIKAR
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2020First promiseDec 2023Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Mar 2020
  • Promised completion28 Dec 2024
  • Revised completionRevised to 28 Dec 2024 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WING A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered6
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,722 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7380.59
Proposed, not sanctioned6,481 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 6, PATHARE BLDG, GOKHALE ROAD, NAUPADA, THANE 400604

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFINER EDGE
EngineerMANGESH B MHATRE
Chartered AccountantCA UMANG SONI
PartnerRole in project
K N DEVELOPERS AND ENGINEERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000018559Dec 2023 → Dec 2024

Reason as filed by the promoterWe, hereby apply for extension u/s 6 of the registered project bearing vide no. P52000025200 for the completion date. We are pleased to inform you that the construction phase of the project has been successfully completed. However, we are currently facing an unavoidable delay in obtaining the necessary statutory permissions. For your reference, we have attached an architect certificate attesting to the 100% completion of the construction work. The delay in acquiring the statutory permissions is primarily due to the procedural complexities involved in the approval process. Despite our earnest e

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Aug 2024

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf19 Oct 2025
Form 1File: Architect certificate.pdf19 Oct 2025
Form 2File: Engineers certificate-IV.pdf19 Oct 2025
Form 3File: Phase-4 - Form 3_June 25 signed (1).pdf19 Oct 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architect certificate -Phase-I completion (2).pdf7 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect certificate -Phase-I completion (1).pdf13 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect certificate-I.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase-Iv.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sky villa Engineers Certificate-IV.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ph4 Signed_.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1_merged_signed.pdf18 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-Phase-I (1).pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance - I - Cert - 2024.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH1-1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate -I.pdf20 Apr 2024
Declaration in FORM BFile: Form B phase-I.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold Phase-I.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MAHARERA_Form 5 - Annual Report_Phase I_2.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-1 - Form 3_Sep23 SIGNED_1.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH1 Architect certificate.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE - P1.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Phase-I.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Wing A.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - I - Cert -2023.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Phase - I - Cer-2020.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Phase - I - Cert - 2021.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - I - Cert -2022.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-1 - Form 3_Mar23_merged Signed.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1_Engineers Certificate_March 2023.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1_Architect Certificate_March 2023.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1_Architect Certificate_December 2022_1.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1_Engineers Certificate_December 2022.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase 1 SIGNED_1.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 - Engineers Certificate.pdf25 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_2.pdf25 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MAHARERA_Form 5 - Annual Report_Phase I_2.pdf25 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase-1 - Architect Certificate.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase-1 - Engineers Certificate_compressed.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Phase-1 - Disclosure of sold or booked inventory.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-1 - Form 3_1.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase-1 - Engineers Declaration_compressed.pdf8 Apr 2022
CERSAI detailsFile: Phase-1 - CERSAI Declaration.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-1 - Form 3.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase-1 - Architect Certificate.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Phase I_compressed.pdf30 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_K N Developers- Phase 1_compressed.pdf30 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Phase I.pdf29 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Phase I.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MAHARERA_Form 5 - Annual Report_Phase I_compressed.pdf29 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase 2_compressed.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Phase I.pdf12 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Phase I.pdf12 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5- ANNUAL AUDIT_compressed.pdf13 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Annual Audit.pdf8 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 21-Jan-2021 12-01-06-compressed.pdf21 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate.pdf19 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate (updated).pdf19 Jan 2021
Layout approvalFile: Scan6_compressed.pdf17 Mar 2020
Building plan approvalFile: Scan6_compressed.pdf17 Mar 2020
PAN CardFile: PAN Card - KN Developers.pdf17 Mar 2020
Copy of the legal title reportFile: Title Report_compressed.pdf17 Mar 2020
Details of encumbrancesFile: No Encumbrances.pdf17 Mar 2020
Copy of Layout Approval (in case of layout)File: Scan6_compressed.pdf17 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan6_compressed.pdf17 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Permission Letter_compressed.pdf17 Mar 2020
Declaration in FORM BFile: Form B - Affadavit_compressed.pdf17 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf17 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf17 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Mar 2020
Proforma of Allotment letterFile: Allotment letter.pdf17 Mar 2020
Proforma of Allotment letterFile: Sample Sale Agreement.pdf17 Mar 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SKY VILLAS PHASE-IV-C WINGP52000051183SAKHARAM SHASTRI BHAVE NAGAR, Raigarh100Jun 2023OngoingDec 2026Not due yet
SKY VILLAS - B WingP52000028114SAKHARAM SHASTRI BHAVE NAGAR, Raigarh46Feb 2021CompletedJul 2025Registered original: Jul 2024Mar 2025

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY VILLAS - A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAKHARAM SHASTRI BHAVE NAGAR5,900+ in Raigarh

Builder: K N DEVELOPERS AND ENGINEERS LLP

K N DEVELOPERS AND ENGINEERS LLP has 4 registrations on MahaRERA, including SKY VILLAS - A WING and SKY VILLAS - B Wing. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SKY VILLAS - A WING is delayed beyond 28 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY VILLAS - A WING?

The registered promoter entity is K N DEVELOPERS AND ENGINEERS LLP, a partnership as per the filing. Its GSTIN 27AATFK5419Q1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY VILLAS - A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY VILLAS - A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY VILLAS - A WING?

The professionals named in the filing: Architect: FINER EDGE; Engineer: MANGESH B MHATRE; Chartered Accountant: CA UMANG SONI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY VILLAS - A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY VILLAS - A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY VILLAS - A WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.