Home / Browse projects / Pune, Maharashtra / SKY PAVILION Phase II
SKY PAVILION Phase II
RG-MH-66873 · RERA P52100018243 · Last updated on MahaRERA portal: 3 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 70 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SKY PAVILION Phase II is a Commercial project by SKP Corp Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100018243 on 16 Oct 2018. Possession is promised by 30 Apr 2027. The completion date has moved by 70 months from the original filing. 22 of the 53 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSKY PAVILION Phase II
- TypeCommercial
- Location
- Undri Road
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018243
- ReraGenie IDRG-MH-66873
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Oct 2018
- Promised completion30 Apr 2027
- Revised completionRevised to 30 Apr 2027 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed98 files
Current status
Figures as on 3 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SKY PAVILION PHASE II | NA | 5 | 4 | 0 | 53 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.
SKY PAVILION PHASE II: 97% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 86% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 86% |
Progress on shared amenities15
As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SKY PAVILION PHASE II | NA | Rs 14.67 cr | Rs 11.30 cr |
| - | NA | Rs 1.54 cr | Rs 97.00 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAFULLA R NADKARNI |
| Architect | ARCH REZA KABUL |
| Architect | Manoj Tatooskar |
| Engineer | UMESH JOSHI |
| Engineer | Prashant RANANAWARE |
| Chartered Accountant | Dharini Naswa and Associates |
| Chartered Accountant | SSAP and Associates LLP |
| Partner | Role in project |
|---|---|
| SKP Corp Private Limited | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Reason as filed by the promoterCOVID - 19 pandemic and other factors such as lockdown, delay in materials supply, and other factors affecting the market condition and construction activities the promoter is unable to complete the project in this time period. Therefore, request you to kindly provide an extension for 1 year. The Self-certified copy of the permission/approval from the competent authority is attached for your perusal.
Reason as filed by the promoterThe construction of the said project is almost completed but unfortunately, we were unable to complete the project by the stipulated timeline because of the slow market condition and slump in the real estate market during the period creating acute economic crises which ultimately slowed down the sale transactions. We are committed to complete and deliver the project. The allottees has provided the required consent which is attached for your perusal.
Reason as filed by the promoter1. Project is 85 % completed 2. Consent of 91.30 % of Allotees uploaded for Extension 3. The Revised Form B is uploaded in Other tab No. 1 and also in the main Application 4. PERT Chart is uploaded in Other Tab No. 2 and also in Other Technical Tab of the Main Application 5. Explanatory Note for Delay in project Completion Uploaded in Other Tab No. 3 6. QPR till date are updated 7. Due to unavoidable circumstances project has been delay and it will be completed by 31/12/2026
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2027
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Sky Pavillion 2025-26 Form 2A.pdf | 3 Aug 2026 |
| Withdrawal Update Form 1File: Achitect Certificate Sky Pavilloon Phase II.pdf | 16 Jul 2026 |
| Withdrawal Update Form 2File: Form2-SP II- Apr 2026 - Jun 2026.pdf | 16 Jul 2026 |
| Withdrawal Update Form 3File: Sky Pavilion Form 3 - June 26.pdf | 16 Jul 2026 |
| Withdrawal Update Form 1File: SKY PAVILLION PHASE II-FORM 1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form2-SP- Jan 2026 - Mar 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: SKPPL -- SKY PAVILION II -- FORM 3 -- 31-03-06.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Sky Pavillion -form 1.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Form2-SP-Oct 2025 - Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: Sky Pavilion Form 3- 31-12-25.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Sky Pavilion Phase - II.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 - Sky Pavilion Phase - II.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form2-SP-July 2025-Sep 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form2-SP-July 2025-Sep 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Sky Pavilion Ph II.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Sky Pavilion Ph II.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Sky Pavilion - Form 5.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Sky Pavilion March 24.pdf | 23 Jun 2025 |
| Withdrawal Update Form 2File: Form2-SkyPavilion-Jan24-Mar24.pdf | 23 Jun 2025 |
| Withdrawal Update Form 3File: Sky Pavilion - CA Certificate.pdf | 23 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 - Sky Pavilion Ph 2.pdf | 2 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sky Pavillion Form 02.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion Ph - II.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sky Pavillion Form 02A.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase -II.pdf | 14 Apr 2025 |
| Declaration in FORM BFile: Form B - Affidavit Cum Declaration for Sky Pavilion -PH -II.pdf | 5 Apr 2025 |
| Other - TechnicalFile: Sky Pavilion Ph II Pert Chart.pdf | 5 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sky Pavilion Form 5.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - Sky Pavilion - II.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sky Pavilion - II - Form 2.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion Sold Inverntory 31-12-2024.pdf | 17 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sky Pavilion - II - Form 2A.pdf | 17 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sky Pavilion - II - Form 2A.pdf | 17 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SKY PAVILION PHASE II - 31-3-2024 SIGNED.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sky Pavilion Phase -II.pdf | 13 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion March 24.pdf | 17 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-SkyPavilion-Jan24-Mar24.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-SkyPavilion-Jan24-Mar24.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion - Sold Inventory as on 31-03-2024.pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: Sky Pavilion - CA Certificate.pdf | 17 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase -II Dec-2023_.pdf | 7 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-SkyPavilion-04-01-2024 (2).pdf | 7 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion - Sold Inventory till Dec 2023.pdf | 7 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 - Sky Pavillion Ph II.pdf | 7 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion.pdf | 17 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-SP-July-September2023.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-SP-July-September2023.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion till 30-09-2023.pdf | 17 Oct 2023 |
| Certificates of CA (Form 3)File: SKPPL - SKY PAVILION II - FORM 3 - 30-9-23.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5 AS ON 31-3-23 SKY PAVILION PH II.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD INVENTORY Sky Pavilion II.pdf | 12 Jun 2023 |
| Certificates of CA (Form 3)File: RERA FORM 3 SKY PAVILION 5-6-23 .pdf | 12 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase -II.pdf | 17 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SP Jan23-Mar23.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A SP II Jan23-Mar23.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SP II Jan23-Mar23.pdf | 17 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion - II.pdf | 17 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate form 1 for Sky Pavilion Phase -II.pdf | 7 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sky Pavillion Dec2022.pdf | 7 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Rera - Sky Pavilion PH II.pdf | 7 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sky Pavillion.pdf | 22 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality assurance certificate Sky Pavillion.pdf | 22 Oct 2022 |
| Certificates of CA (Form 3)File: SKY PAVILLION PHASE II RERA FROM 3.pdf | 22 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SKY PAVILLION PHASE II FORM 5.pdf | 13 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase- II.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sky Pavillion II.pdf | 7 Oct 2022 |
| Certificates of CA (Form 3)File: SKY PAVILLION RERA FORM 3.pdf | 7 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sky Pavilion Phase - II.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory Sky Pavilion Phase - II.pdf | 7 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sky Pavilion II.pdf | 17 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion PH II.pdf | 20 Oct 2021 |
| Certificates of CA (Form 3)File: FORM 3 SKY PAVILION PHASE II FY 2020-21.pdf | 20 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 SKY PAVILION PHASE II FY 2020-21.pdf | 20 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Sky Pavilion - Ph II.pdf | 30 Jun 2021 |
| Declaration about Commencement CertificateFile: Declaration - Sky Pavilion _ph II.pdf | 28 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sky Pavilion Ph-II (2019-20).pdf | 28 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sky Pavilion PH-II (2020-21).pdf | 28 Jun 2021 |
| PAN CardFile: PAN Card.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 SKY PAVILION PHASE II FY 2019-20.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Sky Pavillion - II.pdf | 6 Nov 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Silver Mist | Plot No. 3 Sadashiv Peth Pune | 30 | Completed | Apr 2016 | Apr 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SKY PAVILION Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 173 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: SKP Corp Private Limited
SKP Corp Private Limited has 4 registrations on MahaRERA, including ASTON PLAZA PHASE I and SKY Pavilion Phase I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SKY PAVILION Phase II is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SKY PAVILION Phase II?
The registered promoter entity is SKP Corp Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SKY PAVILION Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SKY PAVILION Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SKY PAVILION Phase II?
The professionals named in the filing: Architect: PRAFULLA R NADKARNI; Architect: ARCH REZA KABUL; Architect: Manoj Tatooskar; Engineer: UMESH JOSHI; Engineer: Prashant RANANAWARE; Chartered Accountant: Dharini Naswa and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKY PAVILION Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback