SKY PAVILION Phase II

By SKP Corp Private Limited

RG-MH-66873 · RERA P52100018243 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 70 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 70 months from the original
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
31 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

SKY PAVILION Phase II is a Commercial project by SKP Corp Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100018243 on 16 Oct 2018. Possession is promised by 30 Apr 2027. The completion date has moved by 70 months from the original filing. 22 of the 53 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSKY PAVILION Phase II
  • TypeCommercial
  • Location
    • Undri Road
    • Undri
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018243
  • ReraGenie IDRG-MH-66873

Builder

  • NameSKP Corp Private Limited
  • Entity typeCompany
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2018First promiseJun 2021Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2018
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed98 files

Current status

42%22 of 53 units booked
75.7%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKY PAVILION PHASE IINA5405353

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

SKY PAVILION PHASE II: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.86%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Open Space9

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,475 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3469.2
Proposed, not sanctioned3,469 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Shop No 4, 5, 6, Gurukrupa Complex, Opp Bajaj Auto, Mahalunge-Ingale, Chakan, Pune -
Estimated costRs 16.20 cr
Cost incurredRs 12.27 cr
Work done75.73%
BuildingWingEstimatedIncurred
SKY PAVILION PHASE IINARs 14.67 crRs 11.30 cr
-NARs 1.54 crRs 97.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAFULLA R NADKARNI
ArchitectARCH REZA KABUL
ArchitectManoj Tatooskar
EngineerUMESH JOSHI
EngineerPrashant RANANAWARE
Chartered AccountantDharini Naswa and Associates
Chartered AccountantSSAP and Associates LLP
PartnerRole in project
SKP Corp Private Limited-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100018243/WarJun 2021 → Apr 2027

Reason as filed by the promoterNA

EXT52100009737Jun 2021 → Jun 2022

Reason as filed by the promoterCOVID - 19 pandemic and other factors such as lockdown, delay in materials supply, and other factors affecting the market condition and construction activities the promoter is unable to complete the project in this time period. Therefore, request you to kindly provide an extension for 1 year. The Self-certified copy of the permission/approval from the competent authority is attached for your perusal.

EXT52100016669Jun 2021 → Dec 2024

Reason as filed by the promoterThe construction of the said project is almost completed but unfortunately, we were unable to complete the project by the stipulated timeline because of the slow market condition and slump in the real estate market during the period creating acute economic crises which ultimately slowed down the sale transactions. We are committed to complete and deliver the project. The allottees has provided the required consent which is attached for your perusal.

EXT52100028122Jun 2021 → Dec 2026

Reason as filed by the promoter1. Project is 85 % completed 2. Consent of 91.30 % of Allotees uploaded for Extension 3. The Revised Form B is uploaded in Other tab No. 1 and also in the main Application 4. PERT Chart is uploaded in Other Tab No. 2 and also in Other Technical Tab of the Main Application 5. Explanatory Note for Delay in project Completion Uploaded in Other Tab No. 3 6. QPR till date are updated 7. Due to unavoidable circumstances project has been delay and it will be completed by 31/12/2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Sky Pavillion 2025-26 Form 2A.pdf3 Aug 2026
Withdrawal Update Form 1File: Achitect Certificate Sky Pavilloon Phase II.pdf16 Jul 2026
Withdrawal Update Form 2File: Form2-SP II- Apr 2026 - Jun 2026.pdf16 Jul 2026
Withdrawal Update Form 3File: Sky Pavilion Form 3 - June 26.pdf16 Jul 2026
Withdrawal Update Form 1File: SKY PAVILLION PHASE II-FORM 1.pdf17 Apr 2026
Withdrawal Update Form 2File: Form2-SP- Jan 2026 - Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: SKPPL -- SKY PAVILION II -- FORM 3 -- 31-03-06.pdf17 Apr 2026
Withdrawal Update Form 1File: Sky Pavillion -form 1.pdf15 Jan 2026
Withdrawal Update Form 2File: Form2-SP-Oct 2025 - Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 3File: Sky Pavilion Form 3- 31-12-25.pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1 - Sky Pavilion Phase - II.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1 - Sky Pavilion Phase - II.pdf17 Oct 2025
Withdrawal Update Form 2File: Form2-SP-July 2025-Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form2-SP-July 2025-Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 - Sky Pavilion Ph II.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 - Sky Pavilion Ph II.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Sky Pavilion - Form 5.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate Sky Pavilion March 24.pdf23 Jun 2025
Withdrawal Update Form 2File: Form2-SkyPavilion-Jan24-Mar24.pdf23 Jun 2025
Withdrawal Update Form 3File: Sky Pavilion - CA Certificate.pdf23 Jun 2025
Certificates of CA (Form 3)File: Form 3 - Sky Pavilion Ph 2.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sky Pavillion Form 02.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sky Pavilion Ph - II.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sky Pavillion Form 02A.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase -II.pdf14 Apr 2025
Declaration in FORM BFile: Form B - Affidavit Cum Declaration for Sky Pavilion -PH -II.pdf5 Apr 2025
Other - TechnicalFile: Sky Pavilion Ph II Pert Chart.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sky Pavilion Form 5.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Sky Pavilion - II.pdf17 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sky Pavilion - II - Form 2.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Sky Pavilion Sold Inverntory 31-12-2024.pdf17 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sky Pavilion - II - Form 2A.pdf17 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sky Pavilion - II - Form 2A.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SKY PAVILION PHASE II - 31-3-2024 SIGNED.pdf17 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sky Pavilion Phase -II.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion March 24.pdf17 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-SkyPavilion-Jan24-Mar24.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-SkyPavilion-Jan24-Mar24.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sky Pavilion - Sold Inventory as on 31-03-2024.pdf17 Apr 2024
Certificates of CA (Form 3)File: Sky Pavilion - CA Certificate.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase -II Dec-2023_.pdf7 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-SkyPavilion-04-01-2024 (2).pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Sky Pavilion - Sold Inventory till Dec 2023.pdf7 Feb 2024
Certificates of CA (Form 3)File: Form 3 - Sky Pavillion Ph II.pdf7 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-SP-July-September2023.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-SP-July-September2023.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Sky Pavilion till 30-09-2023.pdf17 Oct 2023
Certificates of CA (Form 3)File: SKPPL - SKY PAVILION II - FORM 3 - 30-9-23.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5 AS ON 31-3-23 SKY PAVILION PH II.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD INVENTORY Sky Pavilion II.pdf12 Jun 2023
Certificates of CA (Form 3)File: RERA FORM 3 SKY PAVILION 5-6-23 .pdf12 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase -II.pdf17 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SP Jan23-Mar23.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A SP II Jan23-Mar23.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SP II Jan23-Mar23.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Sky Pavilion - II.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate form 1 for Sky Pavilion Phase -II.pdf7 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sky Pavillion Dec2022.pdf7 Jan 2023
Disclosure of sold/ booked inventoryFile: Rera - Sky Pavilion PH II.pdf7 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sky Pavillion.pdf22 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality assurance certificate Sky Pavillion.pdf22 Oct 2022
Certificates of CA (Form 3)File: SKY PAVILLION PHASE II RERA FROM 3.pdf22 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SKY PAVILLION PHASE II FORM 5.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sky Pavilion Phase- II.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Sky Pavillion II.pdf7 Oct 2022
Certificates of CA (Form 3)File: SKY PAVILLION RERA FORM 3.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sky Pavilion Phase - II.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Booked Inventory Sky Pavilion Phase - II.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sky Pavilion II.pdf17 Jan 2022
Disclosure of sold/ booked inventoryFile: Sky Pavilion PH II.pdf20 Oct 2021
Certificates of CA (Form 3)File: FORM 3 SKY PAVILION PHASE II FY 2020-21.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 SKY PAVILION PHASE II FY 2020-21.pdf20 Oct 2021
Disclosure of sold/ booked inventoryFile: Sky Pavilion - Ph II.pdf30 Jun 2021
Declaration about Commencement CertificateFile: Declaration - Sky Pavilion _ph II.pdf28 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sky Pavilion Ph-II (2019-20).pdf28 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sky Pavilion PH-II (2020-21).pdf28 Jun 2021
PAN CardFile: PAN Card.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 SKY PAVILION PHASE II FY 2019-20.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Sky Pavillion - II.pdf6 Nov 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Silver MistPlot No. 3 Sadashiv Peth Pune30CompletedApr 2016Apr 2016

How this compares with Pune

42%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 70 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY PAVILION Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Undri13,700+ in Pune

2 kmSKY PAVILION Phase IICompleted 78Lapsed / revoked 32Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: SKP Corp Private Limited

SKP Corp Private Limited has 4 registrations on MahaRERA, including ASTON PLAZA PHASE I and SKY Pavilion Phase I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SKY PAVILION Phase II is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY PAVILION Phase II?

The registered promoter entity is SKP Corp Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY PAVILION Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY PAVILION Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY PAVILION Phase II?

The professionals named in the filing: Architect: PRAFULLA R NADKARNI; Architect: ARCH REZA KABUL; Architect: Manoj Tatooskar; Engineer: UMESH JOSHI; Engineer: Prashant RANANAWARE; Chartered Accountant: Dharini Naswa and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY PAVILION Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY PAVILION Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY PAVILION Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.