Registration lapsed No litigation declared Residential / Group Housing project

SIMRAN HEIGHTS

By VIKAS NARAYAN RAIKAR

RG-MH-20703 · RERA P51800002238 · Last updated on MahaRERA portal: 30 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Completion date moved by 66 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 70%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

SIMRAN HEIGHTS is a Residential / Group Housing project by VIKAS NARAYAN RAIKAR in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002238 on 31 Jul 2017. Possession was promised by 31 Mar 2025 and is now 19 months past that date. The completion date has moved by 66 months from the original filing.

At a glance

Project

  • NameSIMRAN HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • W.T. PATIL MARG
    • GOVANDI
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002238
  • ReraGenie IDRG-MH-20703

Builder

  • NameVIKAS NARAYAN RAIKAR
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

19 months past promisethis monthRegisteredJul 2017First promiseSep 2019Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Jul 2017
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 24 Sep 2019)
  • Buildings2 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIMRAN HEIGHTS - PHASE INA230000
SIMRAN HEIGHTS - Phase IINA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.

SIMRAN HEIGHTS - PHASE I47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SIMRAN HEIGHTS - Phase II36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Closed/Covered57
BuildingClosed/CoveredTotal
SIMRAN HEIGHTS - PHASE I5656
SIMRAN HEIGHTS - Phase II11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,867 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6444.33
Proposed, not sanctioned3,394 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCORPORATE FINANCIAL SERVICES BRANCH 105 10TH FLOOR MAKER CHAMBER 3 NARIMAN POINT MUMBAI 400021

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS V CHEMBURKAR
EngineerSTRUCTWEL DESIGNERS AND CONSULTANTS PVT LTD
PartnerRole in project
VIKAS NARAYAN RAIKAR-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017647Sep 2019 → Mar 2025

Reason as filed by the promoterOur Bldg consist of Stilt + 22 upper Floors. We have obtained occupation certificate upto 21st Floor and have given possession to all purchasers except 2 unsold Flats. 22nd Floor consists of 5 flats for which we have applied for O.C. but not yet received. We have taken consent of of 4 flats that are sold.

EXT51800009326Sep 2019 → Sep 2021

Reason as filed by the promoterThis is a S.R.A project wherein Bldg is Stilt + 22 upper floors. The entire construction work is completed. However, some Revenue matters relating to S.R.A are remaining. Since, the entire development work is completed S.R.A authorities have granted us Part Occupation certificate for Bldg. with Stilt + 18 upper floors. We are following up with S.R.A Authorities to complete the remaining Revenue matters and we expect to complete the same and obtain full Occupation Certificate within a period of 3 to 4 months time.

EXT51800002537Sep 2019 → Sep 2020

Reason as filed by the promoterVide our Application for RERA Registration on 31/7/2017, we had estimated that we will be able to complete the Project by Sept’19. This Project is under S.R.A Authority. At the time of amendment to Letter of Intent (L.O.I.) in April, 2017, the file went CFO, S.R.A and was approved in June, 2017. However, since the particular C.E.O. was to retire on 30/06/2017 and had approved more than 65 to 75 files just before his retirement , there were allegations against the CEO and all approvals issued by the CEO in the last fortnight before his retirement were to be verified by the committee appointed b

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2022

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf30 Jun 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf30 May 2025
Declaration in FORM BFile: Form B Final.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf24 May 2025
Other - TechnicalFile: CPM.pdf24 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf18 Jan 2025
Certificates of CA (Form 3)File: Form 3.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf12 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Oct 2024
Certificates of CA (Form 3)File: Form 3 n.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf20 Jul 2024
Certificates of CA (Form 3)File: Form 3 C.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Mar24.pdf30 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf20 Apr 2024
Declaration in FORM BFile: Form B.pdf17 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf17 Feb 2024
Declaration in FORM BFile: Form B.pdf30 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf30 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 22.pdf30 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf30 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 23.pdf30 Jan 2024
Certificates of CA (Form 3)File: Form 3 C.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf5 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Declaration.pdf12 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf15 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate2.pdf2 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf1 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf1 Nov 2021
Certificates of CA (Form 3)File: C A Certificate.pdf1 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part occupation Certificate - 19th to 21st floor.pdf3 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupation Certificate.pdf9 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf9 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter.pdf29 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf26 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 Simran Heights 20-21.pdf26 Jun 2021
OtherFile: Letter 3.pdf24 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Simran Heights.pdf25 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Simran Heights.pdf22 Oct 2020
Certificates of CA (Form 3)File: Form 3 n.pdf21 Nov 2019
Details of encumbrancesFile: Encumbrance Certificate.pdf19 Nov 2019
Details of encumbrancesFile: Encumbrance Certificate.pdf19 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf18 Nov 2019
Certificates of CA (Form 3)File: FORM No 3.pdf18 Nov 2019
Certificates of CA (Form 5)File: Simran Heights - Form 5.pdf28 May 2019
OtherFile: Extn Letter.pdf28 May 2019
Details of encumbrancesFile: Encumbrance certificate Simran Height 1.pdf28 Jan 2019
Building plan approvalFile: 1.pdf15 Sep 2018
Building plan approvalFile: 2.pdf15 Sep 2018
Building plan approvalFile: 3.pdf15 Sep 2018
Building plan approvalFile: 4.pdf15 Sep 2018
Building plan approvalFile: letter.pdf15 Sep 2018
Building Plan Approval (IOD)File: 1.pdf15 Sep 2018
Building Plan Approval (IOD)File: 2.pdf15 Sep 2018
Building Plan Approval (IOD)File: 3.pdf15 Sep 2018
Building Plan Approval (IOD)File: 4.pdf15 Sep 2018
Building Plan Approval (IOD)File: letter.pdf15 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: C C - Simran Heights.pdf11 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Simran Heights cc.pdf23 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificates.pdf16 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificates.pdf16 Dec 2017
Certificates of CA (Form 3)File: C A Certificates.pdf16 Dec 2017
Layout approvalFile: Layout Plan Simran Heights.pdf27 Jul 2017
Building plan approvalFile: Section Plan.pdf27 Jul 2017
Building plan approvalFile: Floor Plan.pdf27 Jul 2017
Building plan approvalFile: Layout and Ground floor plan.pdf27 Jul 2017
PAN CardFile: VNR - Pan Card.pdf27 Jul 2017
Copy of the legal title reportFile: Title Certificate Nav Shivneri 1.pdf27 Jul 2017
Copy of the legal title reportFile: Title Certificate Nav Shivneri 2.pdf27 Jul 2017
Details of encumbrancesFile: Encumbrance certificate-Simran Height -Vikas const.pdf27 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SUJATA EMPRESSPLOT NO 50 SECTOR 35D KHARGHAR NAVI MUMBAI102CompletedJan 2013Late, Apr 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIMRAN HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOVANDI6,700+ in Mumbai Suburban

2 kmSIMRAN HEIGHTSCompleted 139Lapsed / revoked 110Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: VIKAS NARAYAN RAIKAR

VIKAS NARAYAN RAIKAR has 4 registrations on MahaRERA, including SAGAR APARTMENT and SIMRAN HEIGHTS. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SIMRAN HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SIMRAN HEIGHTS is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIMRAN HEIGHTS?

The registered promoter entity is VIKAS NARAYAN RAIKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIMRAN HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIMRAN HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIMRAN HEIGHTS?

The professionals named in the filing: Architect: S V CHEMBURKAR; Engineer: STRUCTWEL DESIGNERS AND CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIMRAN HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIMRAN HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIMRAN HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.