ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SILVENIA

Registration lapsed No litigation declared Residential / Group Housing project

SILVENIA

By Associated Recons LLP

RG-MH-43730 · RERA P52100053357 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
6 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SILVENIA is a Residential / Group Housing project by Associated Recons LLP in Pune, Maharashtra, registered with MahaRERA as P52100053357 on 27 Oct 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 33 of the 39 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSILVENIA
  • TypeResidential / Group Housing
  • Location
    • LANE NO 20
    • SUVARNABAUG COLONY
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053357
  • ReraGenie IDRG-MH-43730

Builder

  • NameAssociated Recons LLP
  • Entity typePartnership
  • GSTIN27AAYFA3148F1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Designated PartnersKEDAR PRABHAKAR SABNE, DEEPAK ANANT KULKARNI
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

4 months past promisethis monthRegisteredOct 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Oct 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

85%33 of 39 units booked

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SILVENIANA101039039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

SILVENIA: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,035 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SILVERLINE APARTMENTS CONDOMINIUMKhadakwasalaPune
Nishigandh apartments condominiumKothrudPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3779.46
Proposed, not sanctioned3,779 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEXT TO PEGASUS HEALTH CLUB, GANESH NAGAR, HINGNE PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY AMLE
EngineerSANTOSH TURKE
Chartered AccountantAnand Deshpande
Chartered AccountantOMKAR RAVINDRA KULKARNI & ASSOCIATES
PartnerRole in project
Associated Recons LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: ilovepdf_merged (9).pdf6 Jul 2026
Form 5 (FY 2024-2025)File: ilovepdf_merged (8).pdf6 Jul 2026
Form 2A (FY 2025-2026)File: Silvenia - Form 2A.pdf2 Jul 2026
Form 1File: FORM 1 31 MARCH 2026.pdf21 Apr 2026
Form 3File: Silvenia Form 3 q4_compressed.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: Silvenia Disclousre.pdf21 Apr 2026
Form 2File: Silvenia Form-2 Q4.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclousere of Inventory.pdf19 Feb 2026
Form 1File: FORM 1 31DEC 2025.pdf19 Feb 2026
Form 2File: FORM-2.pdf19 Feb 2026
Form 3File: SILVENIA Form-3_compressed.pdf19 Feb 2026
Form 1File: FORM 1 30 sept 2025 (2).pdf25 Nov 2025
Form 2File: SEP 25.pdf25 Nov 2025
Form 3File: Sep 25_compressed.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory PDF.pdf25 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silvenia form 3 As on 31ST MARCH 2025 REVISED.pdf14 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 25.pdf10 Jun 2025
Disclosure of sold/ booked inventoryFile: s and b Silvenia.pdf10 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Mar 25.pdf2 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 MARCH 2025.pdf31 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silvenia form 3 As on 31ST MARCH 2025.pdf31 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 2024.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - DEC 24.pdf22 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A dec 24.pdf22 Mar 2025
Details of encumbrances concerned to FinanceFile: encumberance r1.pdf29 Jan 2025
Details of encumbrances concerned to LegalFile: encumberance r1.pdf29 Jan 2025
Details of encumbrances concerned to FinanceFile: encumberance certificate.pdf28 Jan 2025
Details of encumbrances concerned to FinanceFile: encumberance certificate.pdf28 Jan 2025
Details of encumbrances concerned to LegalFile: encumberance certificate.pdf28 Jan 2025
Details of encumbrances concerned to LegalFile: encumberance certificate.pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate Form 2A FY 2023-24.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE 30NOV2024-1.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 31-03-2024.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 30-06-2024.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 01-10-2024.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 2 30-09-2024.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 2 30-06-2024.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 2 31-03-2024 new.pdf6 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (1).pdf6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 .pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Nov 2024.pdf13 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Silvenia.pdf12 Dec 2024
Proforma of Agreement for saleFile: agreement.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31MARCH2024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 JUNE 2024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 SEPT 2024.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE 30SEPT2024.pdf12 Nov 2024
Building plan approvalFile: final sanction sl PLAN.pdf9 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: silvenia final cc.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: final sanction sl PLAN.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 sept 24.pdf8 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A sept 24.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: silvenia form 3 sept.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE 30JUNE2024.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 24.pdf8 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A JUNE 24.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: silvenia form 3 june 2024.pdf8 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: NON ENCUMBRANCES FINANCE.pdf12 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Scan 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - march 23.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD AND BOOK INVENTORY - UPTO MARCH 24.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Silvenia March 24_11zon.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Silvenia Dec 23.pdf30 Jan 2024
PAN CardFile: ASSOCIATED RECONS PAN COPY.pdf6 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Declaration AFS.pdf11 Sep 2023
Proforma of Agreement for saleFile: AFS- REVISED SILVENIA.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest by dak.pdf16 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest by ks.pdf16 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement silvenia.pdf28 Jul 2023
Declaration about Commencement CertificateFile: commencement declaration.pdf28 Jul 2023
Details of encumbrances concerned to FinanceFile: financial encumbrance report.pdf27 Jul 2023
Details of encumbrances concerned to FinanceFile: legal encumbrance report.pdf27 Jul 2023
Details of encumbrances concerned to LegalFile: financial encumbrance report.pdf27 Jul 2023
Details of encumbrances concerned to LegalFile: legal encumbrance report.pdf27 Jul 2023
Declaration in FORM BFile: Form B rev.pdf27 Jul 2023
Other - LegalFile: legal encumbrance report.pdf27 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank letter for RERA.pdf6 Jul 2023
Other - FinanceFile: PAN declaration.pdf6 Jul 2023
Proforma of Allotment letterFile: allotment letter.pdf30 Jun 2023
Deviation Report with respect to Allotment letterFile: declaration on deviation in allotment letter.pdf30 Jun 2023

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JAIP52100080254SHIVDARSHAN, Pune16May 2025OngoingJun 2028Not due yet
TEJASWIP52100077281TULSHIBAUGWALE COLONY, Pune26Aug 2024OngoingJun 2027Not due yet
YUVRAJ APARTMENTSP52100032032NAVKETAN SOCIETY, Pune-Dec 2021CompletedSep 2024Jun 2024
SAI SMRUTIP52100030613DAHANUKAR COLONY, Pune-Sep 2021CompletedSep 2024Feb 2024
SAROJ CHSLP52100014747DAHANUKAR COLONY, Pune-Jan 2018CompletedMar 2021Aug 2020
AVANTILI CHSLPLOT NO 2 HAPPY COLONY PUNE28-CompletedMar 2017Mar 2017

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVENIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUVARNABAUG COLONY13,700+ in Pune

2 kmSILVENIACompleted 99Lapsed / revoked 48Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 303 registered projects within 2 km.

Builder: Associated Recons LLP

Associated Recons LLP has 7 registrations on MahaRERA, including SAROJ CHSL and SNEH PARK. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SILVENIA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SILVENIA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVENIA?

The registered promoter entity is Associated Recons LLP, a partnership as per the filing. Its GSTIN 27AAYFA3148F1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVENIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVENIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVENIA?

The professionals named in the filing: Architect: AJAY AMLE; Engineer: SANTOSH TURKE; Chartered Accountant: Anand Deshpande; Chartered Accountant: OMKAR RAVINDRA KULKARNI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVENIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVENIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVENIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one