Completed No litigation declared Commercial project

Silicon Business Centre

By POOJA DEVLOPERS

RG-MH-73147 · RERA P51600021948 · Last updated on MahaRERA portal: 1 Apr 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
1 of 11Construction stages donefurthest along: Basement (if any), 30%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Silicon Business Centre is a Commercial project by POOJA DEVLOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600021948 on 25 Aug 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSilicon Business Centre
  • TypeCommercial
  • Location
    • Pathardi Road
    • Pathardi village
    • Nashik
    • 422010
  • Pincode422010
  • RERA no.P51600021948
  • ReraGenie IDRG-MH-73147

Builder

  • NamePOOJA DEVLOPERS
  • Entity typePartnership
  • PartnersKishor Madhukar Rumale, Mafatlal Ambalal Patel, Bimal Chandrakant Bhatt
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Silicon Business CentreNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 30%.

Silicon Business Centre: 15% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed299

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots299
Closed/Covered286
Open Space13

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,358 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5839.6
Proposed, not sanctioned5,840 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch3 7 INDIRA TOWER NEAR INDIRA NAGAR POLICE STATION NASHIK 422009

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGaikwad Associates
EngineerRajesh Chandrakant Dindorkar
Chartered AccountantHitesh Rajkumar Issrani
PartnerRole in project
POOJA DEVLOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600018806Dec 2023 → Jun 2024

Reason as filed by the promoterWe have been allowed to add an additional floor to our present building plan. We have already applied to maharera about the change in building plan. So we request to extend the completion date to 30.06.2024

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Jul 2024

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: form 3 31032024.pdf1 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf1 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL COMPLETION.pdf9 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: KISHORBHAI 001 (1).pdf9 Jul 2024
CERSAI detailsFile: declaration.pdf10 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A BCB_merged.pdf10 Feb 2024
Details of encumbrances concerned to FinanceFile: exuberance certificate.pdf6 Feb 2024
Details of encumbrances concerned to LegalFile: exuberance certificate.pdf6 Feb 2024
Declaration in FORM BFile: FORM B.pdf6 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31032022.pdf6 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200295418353_For_Asset_Based_Search_01_02_2024_15_35_49_251.pdf6 Feb 2024
CERSAI detailsFile: exuberance certificate.pdf6 Feb 2024
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: Ebcumbrance Certificate.pdf1 Feb 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf1 Feb 2024
Details of encumbrances concerned to LegalFile: Ebcumbrance Certificate.pdf1 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 010124.pdf1 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 01012024.pdf1 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A 010124.pdf1 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A 010124.pdf1 Feb 2024
Disclosure of sold/ booked inventoryFile: sold unsold invetory.pdf1 Feb 2024
Certificates of CA (Form 3)File: Scan 1-2-24 - converted (1).pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser of interest in other organazation.pdf1 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration.pdf1 Feb 2024
Building plan approvalFile: 7TH FLOOR.pdf29 Dec 2023
Building Plan Approval (IOD)File: 7TH FLOOR.pdf29 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement highlight.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1FY 22-23 Q4.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1FY 23-24- Q 1.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1FY 23-24 - Q2.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 FY 22-23 Q4.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 FY 23-24 Q1.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 FY 23-24 Q2.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 1-7-23.pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FY 22-23 Q4.pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FY 23-24 Q1.pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FY 23-24 Q2.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY 23-24 Q4.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY 23-24 Q1.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY 23-24 Q2.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE -Q1.pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE-Q2.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Q1.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Q2.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Q3.pdf6 Sep 2023
Certificates of CA (Form 3)File: FORM 3-Q1-FY 22-23-POOJA DEVELOPERS.pdf6 Sep 2023
Certificates of CA (Form 3)File: FORM 3-Q2-FY 22-23-POOJA DEVELOPERS.pdf6 Sep 2023
Certificates of CA (Form 3)File: FORM 3.pdf6 Sep 2023
Certificates of CA (Form 3)File: Form 3 31-12-2021 Compressed.pdf9 Dec 2022
Certificates of CA (Form 3)File: Form 3 31-03-2022_compressed.pdf9 Dec 2022
Certificates of CA (Form 3)File: Compress Form 3 31122021.pdf3 Dec 2022
Certificates of CA (Form 3)File: Compress Form 3 31032022.pdf3 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_3.pdf27 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_1.pdf27 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_2.pdf27 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGCERTIFICATE30062021.pdf27 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2130092021.pdf27 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: certificate of assurance 2A 30062021-Comp.pdf27 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 30092021-Comp.pdf27 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory 30-6-21-Comp.pdf27 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory 30-9-21-Comp.pdf27 Oct 2021
Certificates of CA (Form 3)File: Form 3 30-6-21 (1).pdf27 Oct 2021
Certificates of CA (Form 3)File: Form 3 30-9-21-Comp.pdf27 Oct 2021
Declaration about Commencement CertificateFile: commencement certificate.pdf4 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form-2 31-3-2021.pdf4 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 31-03-2021.pdf4 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf4 Oct 2021
Certificates of CA (Form 3)File: cacertificate31032021.pdf4 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: annual report on statement of acccount.pdf4 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Final Form 5.pdf30 Sep 2021
Certificates of CA (Form 3)File: 032020.pdf27 Feb 2021
Certificates of CA (Form 3)File: 122020.pdf27 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANNUAL REPORT (1)-compressed.pdf27 Feb 2021
Copy of the legal title reportFile: pooja dev (1).pdf9 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rera engineer certificate.pdf9 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QA.pdf9 Mar 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Pooja EnclaveNear Karma Residency Behind Seven Hotel54CompletedJul 2017Jul 2017

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Silicon Business Centre on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pathardi village4,100+ in Nashik

Builder: POOJA DEVLOPERS

POOJA DEVLOPERS has 1 registration on MahaRERA, including Silicon Business Centre. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Silicon Business Centre is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Silicon Business Centre?

The registered promoter entity is POOJA DEVLOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Silicon Business Centre?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Silicon Business Centre?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Silicon Business Centre?

The professionals named in the filing: Architect: Gaikwad Associates; Engineer: Rajesh Chandrakant Dindorkar; Chartered Accountant: Hitesh Rajkumar Issrani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Silicon Business Centre?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Silicon Business Centre. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Silicon Business Centre to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.