signature heights

By suraj dinesh singh

RG-MH-28233 · RERA P99000025366 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
15 of 33Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 85%
27 of 123Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

signature heights is a Mixed project by suraj dinesh singh in Palghar, Maharashtra, registered with MahaRERA as P99000025366 on 13 May 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 96 of the 123 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • Namesignature heights
  • TypeMixed
  • Location
    • waliv naka
    • amsador school vithal mandir
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000025366
  • ReraGenie IDRG-MH-28233

Builder

  • Namesuraj dinesh singh
  • Entity typeIndividual
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2020First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 May 2020
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings3 building records
  • Documents filed91 files

Current status

78%96 of 123 units booked
72.3%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIGNATURE HIEGHTS BLDG 1NA33433275
SIGNATURE VILLASNA31101
SIGNATURE HEIGHTS BLDG 2NA2241546

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

SIGNATURE HIEGHTS BLDG 160%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SIGNATURE VILLAS74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SIGNATURE HEIGHTS BLDG 274%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered63
Open Space87
BuildingClosed/CoveredOpen SpaceTotal
SIGNATURE HIEGHTS BLDG 16262124
SIGNATURE VILLAS112
SIGNATURE HEIGHTS BLDG 202424

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,378 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI1809.96
Proposed, not sanctioned1,810 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVasai West
Estimated costRs 39.45 cr
Cost incurredRs 28.51 cr
Work done72.28%
BuildingWingEstimatedIncurred
SIGNATURE HIEGHTS BLDG 1NARs 25.00 crRs 18.50 cr
SIGNATURE VILLASNARs 6.25 crRs 4.50 cr
SIGNATURE HEIGHTS BLDG 2NARs 6.25 crRs 4.50 cr
-NARs 1.95 crRs 1.01 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEVENDRA MISTRY ARCHITECT AND INTERIOR DESIGNER
EngineerMESHRAM AND THUKRAL
Chartered AccountantBHARAT PARMAR AND ASSOCIATES
Chartered AccountantRamesh D Lukad
PartnerRole in project
suraj dinesh singh-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018722Dec 2023 → Dec 2025

Reason as filed by the promoterdue to ammendment in commencement certificate and lockdown project delayed, now need extension and for the same consents of the allottees has been obtained.

EA04022619717Dec 2023 → Dec 2027

Reason as filed by the promoterThe Promoter submits that substantial construction of the project has been completed, including major RCC structural works. However, certain balance works such as internal finishing, sanitary and electrical installations, external plaster, services installations, and external development could not be completed within the originally stipulated period. The delay has occurred due to the sequential nature of construction activities, wherein services and finishing works can be executed only after completion of civil works, as well as due to coordination required with utility service providers and l

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf14 May 2026
Withdrawal Update Form 2File: form2 (1).pdf14 May 2026
Withdrawal Update Form 3File: signature form 3.pdf14 May 2026
Withdrawal Update Form 1File: form 1.pdf4 May 2026
Withdrawal Update Form 2File: form2 (1).pdf4 May 2026
Withdrawal Update Form 3File: signature form 3.pdf4 May 2026
Withdrawal Update Form 1File: form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: form2 (1).pdf28 Apr 2026
Withdrawal Update Form 3File: ca form 3.pdf28 Apr 2026
Form 5 (FY 2023-2024)File: Form-5 23-24.pdf25 Mar 2026
Form 5 (FY 2024-2025)File: Form-5 24-25.pdf25 Mar 2026
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (1).pdf18 Mar 2026
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (2).pdf18 Mar 2026
Withdrawal Update Form 1File: form 1.pdf12 Mar 2026
Withdrawal Update Form 2File: form2 (1).pdf12 Mar 2026
Withdrawal Update Form 3File: signature form3_compressed_11zon.pdf12 Mar 2026
Form 2A (FY 2022-2023)File: form 2a 23.pdf12 Mar 2026
Form 2A (FY 2023-2024)File: form 2a 24.pdf12 Mar 2026
Form 2A (FY 2024-2025)File: form 2a 25.pdf12 Mar 2026
Withdrawal Update Form 1File: architect certificate 01-03-2025 001.pdf4 Feb 2026
Withdrawal Update Form 2File: Engineer certificate 31-03-2025.pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA .pdf4 Feb 2026
Withdrawal Update Form 1File: architect certificate 01-03-2025 001.pdf27 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf27 Dec 2025
Withdrawal Update Form 3File: Adobe Scan 5 May 2025 5 001_11zon.pdf27 Dec 2025
Withdrawal Update Form 1File: architect certificate 01-03-2025 001.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf31 Oct 2025
Withdrawal Update Form 3File: Adobe Scan 5 May 2025 5 001_11zon.pdf31 Oct 2025
Form 1File: Form 1 JAN-MAR 24.pdf12 Jul 2025
Form 2File: engineer certificate 20-03-2024.pdf12 Jul 2025
Form 3File: form 3 mar 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Jan Mar 24.pdf12 Jul 2025
Form 1File: Form 1 APRIL-JUNE 24.pdf12 Jul 2025
Form 2File: Engineer certificate 20-06-2024.pdf12 Jul 2025
Form 3File: form 3 jun 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD Apr June 24.pdf12 Jul 2025
Form 1File: Form 1 JULY-SEP 24.pdf12 Jul 2025
Form 2File: Engineer certificate 26-09-2024.pdf12 Jul 2025
Form 3File: form 3 sep 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD July Sep 24.pdf12 Jul 2025
Form 1File: Form 1 OCT-DEC 24.pdf12 Jul 2025
Form 2File: Engineer certificate 26-12-2024.pdf12 Jul 2025
Form 3File: form 3 dec 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD Oct dec 24.pdf12 Jul 2025
Form 1File: Form 1 JAN-MAR 25.pdf12 Jul 2025
Form 2File: Engineer certificate 31-03-2025.pdf12 Jul 2025
Form 3File: form 3 mar 25.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Jan Mar 25.pdf12 Jul 2025
Layout approvalFile: Layout.pdf22 Feb 2024
Building plan approval or NA orderFile: Bld-1.pdf22 Feb 2024
Building plan approval or NA orderFile: bld-2.pdf22 Feb 2024
Building plan approval or NA orderFile: Bld-3.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Bld-1.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: bld-2.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Bld-3.pdf22 Feb 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf22 Feb 2024
Declaration in FORM BFile: fORMB.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A-20-21.pdf22 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2a-21-22.pdf22 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2a-22-23.pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold List.pdf22 Feb 2024
CERSAI detailsFile: Cersai.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ca.pdf22 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosuer Of Interest.pdf22 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form2A-20-21.pdf22 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5-21-22.pdf22 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5-22-23.pdf22 Feb 2024
Proforma of Agreement for saleFile: Draft Agreement.pdf22 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf22 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf22 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement.pdf22 Feb 2024
PAN CardFile: SURAJ PAN CARD PDF.pdf1 May 2020
Details of encumbrancesFile: ec.pdf1 May 2020
Layout approvalFile: cc 1.pdf16 Mar 2020

How this compares with Palghar

78%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 48 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep signature heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near amsador school vithal mandir3,200+ in Palghar

2 kmsignature heightsCompleted 20Lapsed / revoked 8Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: suraj dinesh singh

suraj dinesh singh has 2 registrations on MahaRERA, including signature heights and Signature Homes. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if signature heights is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of signature heights?

The registered promoter entity is suraj dinesh singh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in signature heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for signature heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at signature heights?

The professionals named in the filing: Architect: DEVENDRA MISTRY ARCHITECT AND INTERIOR DESIGNER; Engineer: MESHRAM AND THUKRAL; Chartered Accountant: BHARAT PARMAR AND ASSOCIATES; Chartered Accountant: Ramesh D Lukad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in signature heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About signature heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save signature heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.