Home / Browse projects / Pune, Maharashtra / Siddhachal - A4

Completed No litigation declared Residential / Group Housing project

Siddhachal - A4

By Viraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV

RG-MH-61844 · RERA P52100018775 · Last updated on MahaRERA portal: 14 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 9 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Siddhachal - A4 is a Residential / Group Housing project by Viraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV in Pune, Maharashtra, registered with MahaRERA as P52100018775 on 4 Dec 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSiddhachal - A4
  • TypeResidential / Group Housing
  • Location
    • Gultekadi Road
    • Marketyard
    • Market Yard
    • Haveli
    • Pune
    • 411037
  • Pincode411037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018775
  • ReraGenie IDRG-MH-61844

Builder

  • NameViraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV
  • Entity typeOthers
  • Named personsMr. Kewalkumar Kesarimal Jain, Mr. Rajas Vimalkumar Jain, Mr. Nandu Aatmaram Vajekar
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1
  • Declared earlier projects10 →

Key dates

this monthRegisteredDec 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Dec 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A4NA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A4: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered100

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,301 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Amogh ConstructionPanvelRaigarh

Approvals and building plan

Permissible FSI7125.8
Proposed, not sanctioned7,126 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing Society East Street Camp

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISHAL J DESHPANDE
EngineerMahesh Rasal
Chartered AccountantSupriya Abhijit Mundada
PartnerRole in project
Viraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016661Dec 2023 → Dec 2024

Reason as filed by the promoterWe are not able to complete our project as planned due to Slowdown of construction activity due to lockdowns imposed to control COVID 19 outbreak and very slow recovery thereafter.

Litigation declared8

CaseCourtStatus
404/2013Civil Court Senior DivisionDisposed Off
185, 186, 188 to 196/1991District CourtDismissed
278/2014Civil Court Senior DivisionPending
504/2018District CourtPending
244/2015High Courtdisposed
311, 337, 182, 215, 184, 303, 332, 94, 183/2020High CourtPending
1793/2019High CourtPending
872/2022High CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jul 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 26_Siddhachal - A4.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 26_Siddhachal - A4.pdf14 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: 240730_Form 4.pdf30 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240718_Completion Certificate_A4.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf20 Jul 2024
Certificates of CA (Form 3)File: 3_CA Certificate.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4.pdf20 Apr 2024
Certificates of CA (Form 3)File: 3_CA Certificate.pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf8 Mar 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf16 Jan 2024
Certificates of CA (Form 3)File: 3_CA Certificate.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4.pdf19 Oct 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 26_Siddhachal - A4.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4.pdf19 Jul 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf19 Jul 2023
Form 2AFile: 5_Form 2A.pdf31 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4.pdf20 Apr 2023
Certificates of CA (Form 3)File: 3_CA Certificate_compressed (1).pdf20 Apr 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5).pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf17 Jan 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 26_Siddhachal - A4.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 26_Siddhachal - A4.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4_Disclosure of Sold Inventory.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf16 Apr 2022
Form 2AFile: 5_Quality_Form 2A.pdf16 Apr 2022
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4_Disclosure of Sold Inventory.pdf16 Apr 2022
Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf16 Apr 2022
Disclosure of sold/ booked inventoryFile: 8_Siddhachal - A4_Disclosure of Sold Inventory.pdf2 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf22 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf22 Jan 2022
Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf22 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf8 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 5_Quality_Form 2A.pdf8 Oct 2021
Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf8 Oct 2021
Declaration about Commencement CertificateFile: 26_Siddhachal - A4.pdf7 Oct 2021
Proforma of Allotment letterFile: 9_210324_Allotment Letter and Agreement for Sale.pdf24 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 26_Siddhachal - A4.pdf8 Jan 2021
Proforma of Allotment letterFile: 8_200812_Allotment Letter and Agreement for Sale.pdf13 Aug 2020
Copy of the legal title reportFile: 8_200812_Legal Title Report_compressed.pdf12 Aug 2020
Form 2AFile: 5_Siddhachal_Form 2A.pdf18 Feb 2020
Annual Audit Report of Statutory CA (Form 5)File: 5_190920_Form 5_Annual Audit Report.pdf21 Sep 2019
Form 2AFile: 5_Siddhachal_Form 2A.pdf20 Jul 2019
Copy of the legal title reportFile: 4_190215_Supplementry Title Opinion_compressed.pdf4 Jul 2019
Form 2AFile: 5_190521_Siddhachal_Form 2A.pdf22 May 2019
Copy of the legal title reportFile: 3_190506_Supplementry Title Opinion.pdf10 May 2019
Declaration in FORM BFile: 6_Form B_Declaration_R1.pdf23 Nov 2018
OtherFile: Self Declaration.pdf23 Nov 2018
Details of encumbrancesFile: 3_Encumbrances.pdf20 Nov 2018
Proforma of Allotment letterFile: 5_Allotment and Agreement.pdf20 Nov 2018
Copy of the legal title reportFile: 2_Legal Title Report_2018.pdf19 Nov 2018
Layout approvalFile: 4_Layout.pdf17 Nov 2018
Copy of the legal title reportFile: 2_Legal Title Report_2015.pdf17 Nov 2018
Copy of the legal title reportFile: 2_Legal Title Report_2017.pdf17 Nov 2018
Copy of the legal title reportFile: 2_Legal Title Report_2013.pdf17 Nov 2018

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kumar ShilohCTS No 1048 Model Colony Bhamburda Shivaji Nagar Pune16CompletedOct 2018Oct 2018
Siddhachal - A2 and A3Sr No 571 Chatrapati Shivaji Marketyard Workers Housing Colony Bibwawadi Pune80CompletedSep 2016Sep 2016
Kumar ShridharSr No 707 Mukundnagar Gultekdi Pune17CompletedFeb 2014Feb 2014
SwapnapurtiSr No 571 Chatrapati Shivaji Marketyard Workers Housing Colony Bibwawadi Pune210CompletedMay 2013May 2013
Kumar ParisarSr No 59 CTS No 1799 1800 1801 1802 Kothrud Pune - 29284CompletedOct 2011Oct 2011
Kumar PreranaSr No 158 P No A Aundh Pune - 07183CompletedSep 2011Sep 2011
Kumar PointCTS No 1105 S No 156 Aundh Pune5CompletedSep 2011Sep 2011
Kumar PadmajaSr No 58 Kothrud Pune74CompletedDec 2003Dec 2003
ParitoshSr No 29 P No 2 at Karvenagar Pune59CompletedAug 2003Aug 2003

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddhachal - A4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Marketyard13,700+ in Pune

2 kmSiddhachal - A4Completed 50Lapsed / revoked 23Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 168 registered projects within 2 km.

Builder: Viraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV

Viraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV has 2 registrations on MahaRERA, including Siddhachal - A4 and Siddhachal - A1. Its filings disclose 10 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Siddhachal - A4 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddhachal - A4?

The registered promoter entity is Viraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddhachal - A4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Siddhachal - A4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddhachal - A4?

The professionals named in the filing: Architect: VISHAL J DESHPANDE; Engineer: Mahesh Rasal; Chartered Accountant: Supriya Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddhachal - A4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddhachal - A4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddhachal - A4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.