Siddh Amara

By Siddh Housing

RG-MH-03474 · RERA P52100019972 · Last updated on MahaRERA portal: 4 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 27 months past the filed date
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2024Possession promised27 months past this date
28 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 192 documents Report an error

Siddh Amara is a Others project by Siddh Housing in Pune, Maharashtra, registered with MahaRERA as P52100019972 on 15 Mar 2019. Possession was promised by 11 Jul 2024 and is now 27 months past that date. The completion date has moved by 7 months from the original filing.

At a glance

Project

  • NameSiddh Amara
  • TypeOthers
  • Location
    • NDA PASHAN ROAD
    • VIDNYAN NAGAR BAVDHAN KHURD
    • Bavdhan Kh.
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019972
  • ReraGenie IDRG-MH-03474

Builder

  • NameSiddh Housing
  • Entity typePartnership
  • PartnersPravin Jagannath Ghadge, Amit Sawta Shinde, Vikrant Subhash Indulkar, Tejas Pravin Ghadge, Amit Sawta Shinde, Vikrant Subhash Indulkar, Tejas Pravin Ghadge, Pravin Jagannath Ghadge
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

27 months past promisethis monthRegisteredMar 2019First promiseDec 2023Revised toJul 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Mar 2019
  • Promised completion11 Jul 2024
  • Revised completionRevised to 11 Jul 2024 (originally 30 Dec 2023)
  • Buildings3 building records
  • Documents filed192 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA110000
BNA100000
CNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed114

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots114
Closed/Covered110
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
A51051
B51051
C8412

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,208 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SIDDH HOUSINGPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3709.72
Proposed, not sanctioned3,504 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFC ROAD SHIVAJINAGAR PUNE 411005

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash Kulkarni Partner of Ankur Associates
EngineerSandeep Karkande
PartnerRole in project
Siddh Housing-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027388Dec 2023 → Jul 2024

Reason as filed by the promoterWe have received Full Occupancy Certificate dated 11/07/2024.Therefore we want to apply for extension ispo facto that is till the date of occupancy certificate.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Nov 2024

Documents filed192

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 192 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Inventory Sold Unsold - siddh amara.pdf4 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM - 2 A - Siddh Housing - 11-06-2025.pdf4 Jul 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate - 29-01-2025 f4 uploaded.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - 30-09-2024 sidh amara.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate-30-09-2024 sidh amara uploaded.pdf18 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Siddh Amara SEP 2024.pdf17 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Siddh Amara SEP 2024.pdf17 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - PH 1.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: Discolsure Of Sold , Booked Inverntory.pdf29 Nov 2024
Building plan approvalFile: scan0281_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0282_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0283_11zon_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0284_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0285_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0286_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0287_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0288_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0289_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0290_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0291_11zon.pdf11 Nov 2024
Building plan approvalFile: scan0292_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0285_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0292_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0291_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0290_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0289_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0288_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0287_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0286_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0284_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0283_11zon_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0282_11zon.pdf11 Nov 2024
Building Plan Approval (IOD)File: scan0281_11zon.pdf11 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate - C wing part.pdf7 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate - C Wing.pdf7 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Siddh Amara.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certi-Siddh Amara - 31032024.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certi - Siddh Amara - 30062024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 _ 31032024_compressed.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 - 30062024_compressed.pdf19 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (1).pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Siddh Amara_ Engineer's Certificate.pdf4 Mar 2024
Certificates of CA (Form 3)File: CA Certificate -Siddh Amara_compressed.pdf28 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Feb 2024
Certificates of CA (Form 3)File: 9 CA CERTIFICATE 30092023_compressed.pdf27 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Architect Certificate 310320.pdf2 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Architect Certificate 310321.pdf2 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Architect Certificate 310322.pdf2 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Architect Certificate 300922.pdf2 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Architect Certificate 311222.pdf2 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Architect Certificate 310323.pdf2 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Architect Certificate 300623.pdf2 Oct 2023
Certificates of CA (Form 3)File: 1 CA Certificate 31032020_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 2 CA Certificate 31032021_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 3 CA Certificate 31032022_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 4 CA Certificate 30062022_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 5 CA Certificate 30092022_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 6 CA Certificate 31122022_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 7 CA Certificate 31032023_compressed.pdf2 Oct 2023
Certificates of CA (Form 3)File: 8CACertificate - 30062023_compressed.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM - 2018-19_compressed.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM - 2019-20_compressed.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM - 2021-22_compressed.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM - 2020-21_compressed.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM - 2022-23_compressed.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM - 2021-22_compressed.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Engineer Certificate.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31032022.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 30092022.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31122022.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -31032023.pdf27 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31062023.pdf27 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf12 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A30062022.pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 30092022.pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31122022.pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31032023.pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A31032020.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A30062020.pdf20 Jan 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 7 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddh Amara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIDNYAN NAGAR BAVDHAN KHURD13,700+ in Pune

2 kmSiddh AmaraCompleted 52Lapsed / revoked 32Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 143 registered projects within 2 km.

Builder: Siddh Housing

Siddh Housing has 2 registrations on MahaRERA, including Siddh Amara and SIDDH AMARA PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Siddh Amara shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Siddh Amara is delayed beyond 11 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddh Amara?

The registered promoter entity is Siddh Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddh Amara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Siddh Amara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddh Amara?

The professionals named in the filing: Architect: Prakash Kulkarni Partner of Ankur Associates; Engineer: Sandeep Karkande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddh Amara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddh Amara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddh Amara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.