Registered No litigation declared Residential / Group Housing project

Shyam Niwas Co-operative Housing Society Limited

By Konark Structural Engineers Private Limited

RG-MH-65285 · RERA PR1170002500805 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 20Construction stages doneacross 2 buildings; furthest along: Excavation, 75%
38 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

Shyam Niwas Co-operative Housing Society Limited is a Residential / Group Housing project by Konark Structural Engineers Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as PR1170002500805 on 16 Sep 2025. Possession is promised by 31 Dec 2028. 0 of the 38 units on this registration are recorded sold or booked, and 0 of 20 construction stages are filed complete.

At a glance

Project

  • NameShyam Niwas Co-operative Housing Society Limited
  • TypeResidential / Group Housing
  • Location
    • THIRD ROAD
    • KHAR WEST
    • Mumbai City
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1170002500805
  • ReraGenie IDRG-MH-65285

Builder

  • NameKonark Structural Engineers Private Limited
  • Entity typeCompany
  • CINU45200MH1998PTC117205
  • GSTIN27AAACK9113B1ZY
  • DirectorsArvind SONMAL Shah, Sangeeta Arvind Shah
  • Other registrations9 more →
  • Completed3 of 10
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Sep 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed19 files

Current status

0%0 of 38 units booked
35.3%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shyam Niwas CHS LTDWING A 161326026
Shyam Niwas CHS LTDWING B161312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 75%.

Shyam Niwas CHS LTD · wing WING A 8%
ActivityProgress
Excavation75%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shyam Niwas CHS LTD · wing WING B8%
ActivityProgress
Excavation75%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Stilt / Ground30
Basement30
BuildingStilt / GroundBasementTotal
Shyam Niwas CHS LTD WING A151530
Shyam Niwas CHS LTD WING B151530

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area824 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Aug 2025
LandownerVillageDistrict
SHYAM NIVAS CO OPERATIVE HOUSING SOCIETY LIMITEDMumbai CityMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI3233.93
Proposed, not sanctioned3,232 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNO 6 PREMNAGAR,MANDAPESHWAR ROADBORIVALI WEST-400092
Estimated costRs 36.00 cr
Cost incurredRs 12.71 cr
Work done35.29%
BuildingWingEstimatedIncurred
Shyam Niwas CHS LTDWING A Rs 22.40 crRs 6.97 cr
Shyam Niwas CHS LTDWING BRs 8.60 crRs 2.65 cr
-NARs 5.00 crRs 3.09 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKetan Vaidya Associates
EngineerSAGAR SUPEDA
Chartered AccountantAjay Shobha & CO
Chartered AccountantNavin Podar & Co.
PartnerRole in project
Konark Structural Engineers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Aug 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM-3.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 - 31-12-2025.pdf13 Jan 2026
Withdrawal Update Form 2File: FORM 2 - 31-12-2025.pdf13 Jan 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf13 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf31 Oct 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf31 Oct 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf31 Oct 2025
Withdrawal Update Form 3File: FROM -3 C A CERTIFICATE.pdf31 Oct 2025
Building plan approvalFile: plan.pdf21 Aug 2025
Building plan approvalFile: PLAN 2.pdf21 Aug 2025
Building plan approvalFile: PLAN 1.pdf21 Aug 2025
Building plan approvalFile: PLAN 3.pdf21 Aug 2025
Layout approvalFile: PLAN 4.pdf21 Aug 2025
Layout approvalFile: PLAN 5.pdf21 Aug 2025
Declaration and undertaking (Annexure A)File: ORDER NO 50.pdf8 Aug 2025

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 not delivered by the promised date3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MODERN ROOP-KAMAL CO-OPERATIVE HOUSING SOCIETY LTDPR1180002501123KANDIVALI WEST, Mumbai Suburban66Oct 2025Certificate SignedDec 2029Not due yet
Girnar Apartment Co-Operative Housing Society LimitedPM1180002500885BORIVALI WEST, Mumbai Suburban106Sep 2025OngoingDec 2029Not due yet
BHAVIK DARSHAN CHS LTD AND GAJMUKH CHS LTDP51800051166BORIVALI, Mumbai Suburban120Jun 2023OngoingDec 2027Not due yet
STATE SECTOR BANK EMPLOYEES CHS LTD KAILAS BUILDINGP51800051152BORIVALI WEST, Mumbai Suburban63Jun 2023OngoingMar 2026Registered original: Mar 2025Not delivered
Shanti Kishan CHS LTDP51800045230Dahisar East, Mumbai Suburban1May 2022CompletedJun 2025Registered original: Dec 2024Mar 2025
MUNICIPAL EMPLOYEES AKANKSHA CHSLP51800035158SVP Road, Mumbai Suburban-May 2022CompletedJun 2023Late, Jul 2023
Boirvali Samarpan CHS LtdP51800045358Boriwali West, Mumbai Suburban-May 2022CompletedJun 2023Late, Dec 2023

How this compares with Mumbai City

0%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shyam Niwas Co-operative Housing Society Lim on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAR WEST780+ in Mumbai City

2 kmShyam Niwas Co-operativeCompleted 46Lapsed / revoked 23Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: Konark Structural Engineers Private Limited

Konark Structural Engineers Private Limited has 10 registrations on MahaRERA, including MUNICIPAL EMPLOYEES AKANKSHA CHSL and Shanti Kishan CHS LTD. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Shyam Niwas Co-operative Housing Society Limited is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shyam Niwas Co-operative Housing Society Limited?

The registered promoter entity is Konark Structural Engineers Private Limited, a company as per the filing. Its CIN U45200MH1998PTC117205 and GSTIN 27AAACK9113B1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shyam Niwas Co-operative Housing Society Limited?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shyam Niwas Co-operative Housing Society Limited?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shyam Niwas Co-operative Housing Society Limited?

The professionals named in the filing: Architect: Ketan Vaidya Associates; Engineer: SAGAR SUPEDA; Chartered Accountant: Ajay Shobha & CO; Chartered Accountant: Navin Podar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shyam Niwas Co-operative Housing Society Limited?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shyam Niwas Co-operative Housing Society Limited. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shyam Niwas Co-operative Housing Society Lim to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.