Home / Browse projects / Mumbai Suburban, Maharashtra / MUNICIPAL EMPLOYEES AKANKSHA CHSL

Completed No litigation declared Residential / Group Housing project

MUNICIPAL EMPLOYEES AKANKSHA CHSL

By Konark Structural Engineers Private Limited

RG-MH-34795 · RERA P51800035158 · Last updated on MahaRERA portal: 21 May 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

MUNICIPAL EMPLOYEES AKANKSHA CHSL is a Residential / Group Housing project by Konark Structural Engineers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800035158 on 10 May 2022. The registration is recorded completed; possession was promised by 30 Jun 2023.

At a glance

Project

  • NameMUNICIPAL EMPLOYEES AKANKSHA CHSL
  • TypeResidential / Group Housing
  • Location
    • Eksar
    • SVP Road
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • RERA no.P51800035158
  • ReraGenie IDRG-MH-34795

Builder

  • NameKonark Structural Engineers Private Limited
  • Entity typeCompany
  • CINU45200MH1998PTC117205
  • GSTIN27AAACK9113B1ZY
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsArvind Shah, Sangeeta Arvind Shah
  • Other registrations9 more →
  • Completed3 of 10
  • Declared earlier projects8 →

Key dates

this monthRegisteredMay 2022PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2022
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MUNICIPAL EMPLOYEES AKANKSHA CHSLNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MUNICIPAL EMPLOYEES AKANKSHA CHSL: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 21 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
GYMNASIUMYes100%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area478 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Municipal Employees Akanksha Chs LtdBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI1290.87
Proposed, not sanctioned1,291 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYogi Nagar Branch

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKeyArch
EngineerSagar Supeda
Chartered AccountantNavin Podar
PartnerRole in project
Konark Structural Engineers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Dec 2023

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate MAR.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate DEC.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold dec 23.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold march 24.pdf21 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: new form 4.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A - akanksha.pdf7 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Scan01112024221428.pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23_0001.pdf11 Jan 2024
Declaration in FORM BFile: P51800035158_FileName_2.pdf21 Dec 2023
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (80).pdf2 Dec 2023
Details of encumbrances concerned to LegalFile: ilovepdf_merged (80).pdf2 Dec 2023
Declaration about Commencement CertificateFile: Borivali CC declaration_0001.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 2.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 3.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 4.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 5.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 6.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 1.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 2.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 3.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 4.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 5.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: ilovepdf_merged (79).pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 1.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: Engineer's Certificate 2.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 2.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 3.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 4.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 5.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 6.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-06-2022.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2022.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2022.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-03-2023.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-06-2023.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2023.pdf2 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (79).pdf2 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate - Akanksha.pdf2 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA BANK LETTER - Copy_0001.pdf2 Dec 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT LETTER_0001.pdf2 Dec 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN AGREEMENT_0001.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: akansha chs ltd Form 3_11zon (1).pdf5 May 2022
Proforma of Allotment letterFile: akansha chs ltd Form 3_11zon (1).pdf5 May 2022
Proforma of Allotment letterFile: Proforma Sale Agreement.pdf5 May 2022
Layout approvalFile: Drawing_Upload1.pdf1 May 2022
Layout approvalFile: Drawing_Upload2.pdf1 May 2022
Layout approvalFile: Drawing_Upload3.pdf1 May 2022
Layout approvalFile: Drawing_Upload4.pdf1 May 2022
Layout approvalFile: Drawing_Upload5.pdf1 May 2022
Copy of the legal title reportFile: RERA TITLE AKANSHA_11zon.pdf1 May 2022
Copy of Layout Approval (in case of layout)File: Drawing_Upload1.pdf1 May 2022
Copy of Layout Approval (in case of layout)File: Drawing_Upload2.pdf1 May 2022
Copy of Layout Approval (in case of layout)File: Drawing_Upload3.pdf1 May 2022
Copy of Layout Approval (in case of layout)File: Drawing_Upload4.pdf1 May 2022
Copy of Layout Approval (in case of layout)File: Drawing_Upload5.pdf1 May 2022
Declaration about Commencement CertificateFile: CC_Declaration.pdf18 Apr 2022
CERSAI detailsFile: CERSAI REPORT.pdf18 Apr 2022
Building plan approvalFile: IOD.pdf15 Apr 2022
PAN CardFile: 7) PAN CARD.pdf15 Apr 2022
Details of encumbrancesFile: 3) Non-Encumbrance Certificate.pdf15 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf15 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: First_CC.pdf15 Apr 2022
Declaration in FORM BFile: FormB_Konark_Akansha.pdf15 Apr 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late1 not delivered by the promised date3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MODERN ROOP-KAMAL CO-OPERATIVE HOUSING SOCIETY LTDPR1180002501123KANDIVALI WEST, Mumbai Suburban66Oct 2025Certificate SignedDec 2029Not due yet
Girnar Apartment Co-Operative Housing Society LimitedPM1180002500885BORIVALI WEST, Mumbai Suburban106Sep 2025OngoingDec 2029Not due yet
BHAVIK DARSHAN CHS LTD AND GAJMUKH CHS LTDP51800051166BORIVALI, Mumbai Suburban120Jun 2023OngoingDec 2027Not due yet
STATE SECTOR BANK EMPLOYEES CHS LTD KAILAS BUILDINGP51800051152BORIVALI WEST, Mumbai Suburban63Jun 2023OngoingMar 2026Registered original: Mar 2025Not delivered
Shanti Kishan CHS LTDP51800045230Dahisar East, Mumbai Suburban1May 2022CompletedJun 2025Registered original: Dec 2024Mar 2025
Boirvali Samarpan CHS LtdP51800045358Boriwali West, Mumbai Suburban-May 2022CompletedJun 2023Late, Dec 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MUNICIPAL EMPLOYEES AKANKSHA CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SVP Road6,700+ in Mumbai Suburban

Builder: Konark Structural Engineers Private Limited

Konark Structural Engineers Private Limited has 10 registrations on MahaRERA, including MUNICIPAL EMPLOYEES AKANKSHA CHSL and Shanti Kishan CHS LTD. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MUNICIPAL EMPLOYEES AKANKSHA CHSL is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MUNICIPAL EMPLOYEES AKANKSHA CHSL?

The registered promoter entity is Konark Structural Engineers Private Limited, a company as per the filing. Its CIN U45200MH1998PTC117205 and GSTIN 27AAACK9113B1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MUNICIPAL EMPLOYEES AKANKSHA CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MUNICIPAL EMPLOYEES AKANKSHA CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MUNICIPAL EMPLOYEES AKANKSHA CHSL?

The professionals named in the filing: Architect: KeyArch; Engineer: Sagar Supeda; Chartered Accountant: Navin Podar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUNICIPAL EMPLOYEES AKANKSHA CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUNICIPAL EMPLOYEES AKANKSHA CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUNICIPAL EMPLOYEES AKANKSHA CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.