Completed No litigation declared Residential / Group Housing project

Shubhankar Durvaa Phase 2

By Atul Dnyaneshwar Bahirat

RG-MH-20715 · RERA P52100005238 · Last updated on MahaRERA portal: 2 Feb 2023

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
4Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Shubhankar Durvaa Phase 2 is a Residential / Group Housing project by Atul Dnyaneshwar Bahirat in Dhanori, 411015, registered with MahaRERA as P52100005238 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 12 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameShubhankar Durvaa Phase 2
  • TypeResidential / Group Housing
  • Location
    • Tingre nagar road
    • Dhanori
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005238
  • ReraGenie IDRG-MH-20715

Builder

  • NameAtul Dnyaneshwar Bahirat
  • Entity typeIndividual
  • GSTIN27AIVPB2327G1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered31
Open Space33

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5900.3
Proposed, not sanctioned1,798 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGokhale Nagar Branch, 1038/4 Sane Building, Gkhokale Building, Shivaji nagar, Pune-411016

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit Avinashe
EngineerG A Bhilare
PartnerRole in project
Atul Dnyaneshwar Bahirat-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009970Jun 2021 → Dec 2021

Reason as filed by the promoterDuring the lockdown in second wave government has exempted construction activity, but we faced many obstacles to maintain continuity in construction work as well as for making compliances with the concern authority.Even the shops providing construction materials were completely closed and there were restrictions for Transportation.Hence, we faced major shortage of material, particularly the specific brand material as per the project requirement.As soon as the rumours of total lockdown for second wave comes out, our Site labours returned to their native places (out of Maharashtra).in spite of p

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC005000000000210RAHUL NEELKANTH DESHMUKHATUL DYANESHWAR BAHIRAT, PROPRITOR OF SHUBHANKAR DEVELOPEMENTS11/09/2017
CC005000000106577RAHUL NEELKANTH DESHMUKHSHUBHANKAR DEVELOPERS THROUGH ATUL DYANESHWAR BAHIRAT02/02/2022
CC005000000198064Juber Mushtaque AhmedAtul Bahirat09/01/2023
CC005000000340713Farheen Imtiyaz ShaikhATUL DYNASHWAR BHAIRAT14/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Jul 2022

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architects Certificate.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5-DT-16-09-2022.pdf26 Sep 2022
Form 2AFile: BUILDING-B-QAC-JUNE-2022.pdf8 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT LETTER FOR RERA.pdf1 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certificate building-B.pdf1 Jul 2022
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT LETTER FOR RERA.pdf1 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION -INWARD FILE OC.pdf1 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance22_compressed.pdf7 Apr 2022
Certificates of CA (Form 5)File: sold and unsold.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_compressed.pdf12 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-.pdf12 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_compressed.pdf12 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate-.pdf12 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD.pdf12 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: BULDG B - QUALITY ASSURANCE CERTIFICATE-SEPT-21.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: sold unsold.pdf8 Oct 2021
Declaration about Commencement CertificateFile: declaration.pdf22 Jul 2021
Certificates of CA (Form 3)File: CA Certificate (2).pdf28 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A.pdf25 Jun 2021
Disclosure of sold/ booked inventoryFile: sold n unsold.pdf25 Jun 2021
Form 2AFile: RERA QUALITY ASSURANCE CERTIFICATE FOR MARCH 2021-1.pdf1 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form - 5.pdf9 Mar 2021
Details of Restarting of Construction work post lockdownFile: RERA WORK .pdf17 Feb 2021
Form 2AFile: RERA QUALITY ASSURANCE CERTIFICATE FOR DEC 2020 PAGE 01.pdf28 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect's certificate.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10TH SLAB ARCHITECT'S CERTIFICATE.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11TH SLAB ARCHITECT'S CERTIFICATE.pdf30 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Sep 2020
Form 2AFile: RERA QUALITY ASSURANCE CERTIFICATE FOR SEP 2020 PAGE 01.pdf30 Sep 2020
Certificates of CA (Form 3)File: CA Certificate.pdf30 Sep 2020
Proforma of Allotment letterFile: sample agreement for RERA Updation.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 th Slab Architect's certificate.pdf30 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9th slab architect's certificate.pdf30 Jun 2020
Form 2AFile: QUALITY ASSURANCE LETTER FROM SITE ENGINEER FOR QTR-MARCH-2020.pdf30 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7th SLAB.pdf26 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7th SLAB.pdf26 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7th SLAB.pdf26 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA QUALITY ASSURANCE CERTIFICATE-min.pdf26 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA QUALITY ASSURANCE CERTIFICATE-min.pdf26 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA QUALITY ASSURANCE CERTIFICATE-min.pdf26 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA ANNUAL REPORT.pdf26 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA ANNUAL REPORT.pdf26 Dec 2019
OtherFile: credai certificate.pdf4 Nov 2019
OtherFile: credai certificate.pdf4 Nov 2019
OtherFile: credai certificate-1.pdf4 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA QUALITY ASSURANCE CERTIFICATE.pdf1 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf19 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf19 Jun 2019
Form 2AFile: QUALITY ASSURANCE CERTIFICATE.pdf19 Jun 2019
Certificates of CA (Form 3)File: CA CERTFICIATE.pdf19 Jun 2019
Building plan approvalFile: PLAN1.pdf14 Jun 2019
Building plan approvalFile: PLAN2.pdf14 Jun 2019
Layout approvalFile: HPSC0181_.pdf14 Jun 2019
Copy of Layout Approval (in case of layout)File: HPSC0181_.pdf14 Jun 2019
Building Plan Approval (IOD)File: PLAN1.pdf14 Jun 2019
Building Plan Approval (IOD)File: PLAN2.pdf14 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf14 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: CC REVISED.pdf22 Jan 2019
Layout approvalFile: layout.pdf21 Jan 2019
Building plan approvalFile: bldg plan.pdf21 Jan 2019
Copy of Layout Approval (in case of layout)File: layout.pdf21 Jan 2019
Building Plan Approval (IOD)File: bldg plan.pdf21 Jan 2019
Form 2AFile: Form 2A.pdf29 Dec 2018
Form 2AFile: Form 2A2.pdf29 Dec 2018
Form 2AFile: Form 2A3.pdf29 Dec 2018
Form 2AFile: Engineer 2A Certificate.pdf29 Dec 2018
Certificates of CA (Form 5)File: FORM_5_UT_CERTIFICATE_1.pdf29 Oct 2018
Certificates of CA (Form 5)File: FORM_5_UT_CERTIFICATE_2.pdf29 Oct 2018
OtherFile: PLINTH_COMPLITION CERTIFICATE_PMC.pdf29 Oct 2018
Layout approvalFile: Layout.pdf16 Apr 2018
Building plan approvalFile: IOD.pdf16 Apr 2018
Layout approvalFile: Layout.pdf16 Apr 2018
Copy of Layout Approval (in case of layout)File: Layout.pdf16 Apr 2018
Copy of Layout Approval (in case of layout)File: Layout.pdf16 Apr 2018
Building Plan Approval (IOD)File: IOD.pdf16 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Comencement certificate.pdf5 Mar 2018
Details of encumbrancesFile: Advocate letter.pdf30 Jul 2017
Certificates of CA (Form 3)File: certificate of CA.pdf30 Jul 2017
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf30 Jul 2017
Layout approvalFile: Layout.pdf29 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHUBHANKAR DURVAA PHASE II AP52100033886DHANORI84Mar 2022OngoingJun 2026Not delivered
SHUBHANKAR DURVAA PHASE II AP52100033886DHANORI84Mar 2022OngoingJun 2026Not delivered

Keep Shubhankar Durvaa Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhanori

Builder: Atul Dnyaneshwar Bahirat

Atul Dnyaneshwar Bahirat has 2 registrations on MahaRERA, including Shubhankar Durvaa Phase 2 and SHUBHANKAR DURVAA PHASE II A. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Shubhankar Durvaa Phase 2 is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shubhankar Durvaa Phase 2?

The registered promoter entity is Atul Dnyaneshwar Bahirat, an individual as per the filing. Its GSTIN 27AIVPB2327G1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shubhankar Durvaa Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shubhankar Durvaa Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shubhankar Durvaa Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shubhankar Durvaa Phase 2?

The professionals named in the filing: Architect: Amit Avinashe; Engineer: G A Bhilare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shubhankar Durvaa Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shubhankar Durvaa Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shubhankar Durvaa Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.