VIVACITY

By REALCON LANDMARKS LLP

RG-MH-22593 · RERA P52100032086 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
59 of 66Construction stages doneacross 6 buildings; furthest along: Installation of Lifts, 95%
20 of 529Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

VIVACITY is a Residential / Group Housing project by REALCON LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100032086 on 6 Dec 2021. Possession is promised by 31 Dec 2026. 509 of the 529 units on this registration are recorded sold or booked, and 59 of 66 construction stages are filed complete.

At a glance

Project

  • NameVIVACITY
  • TypeResidential / Group Housing
  • Location
    • S NO 9
    • VILLAGE DHANORI
    • TAL PUNE CITY
    • PUNE
    • Haveli
    • Pune
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032086
  • ReraGenie IDRG-MH-22593

Builder

  • NameREALCON LANDMARKS LLP
  • Entity typeOthers
  • Named personsYELLOWSTONE SKYSCRAPERS LLP, DHANORI PROJECTS LLP

Key dates

this monthRegisteredDec 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed88 files

Current status

96%509 of 529 units booked
79.0%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA13081081
BNA11080686
CNA110631376
DNA1009023113
ENA1009012102
FNA11071071

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

59 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of Lifts, at 95%.

A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
D90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed420

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots420
Closed/Covered420
BuildingClosed/CoveredTotal
A7070
B7070
C7070
D7070
E7070
F7070

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,519 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI60092.96
Proposed, not sanctioned16,959 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR PLOT NO 421/A GOKHALE ROAD ASHOKNAGAR PUNE 411016
Estimated costRs 162.48 cr
Cost incurredRs 128.31 cr
Work done78.97%
BuildingWingEstimatedIncurred
DNARs 30.35 crRs 29.93 cr
ANARs 27.59 crRs 29.93 lakh
ENARs 27.59 crRs 29.93 cr
-NARs 24.54 crRs 7.61 cr
FNARs 22.07 crRs 22.62 cr
CNARs 20.69 crRs 22.62 cr
BNARs 9.66 crRs 15.31 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A ARCHITECTURE
EngineerPLANEDGE CONSULTANTS PVT LTD
Chartered AccountantBHANDARI S A A J & ASSOCIATES
Chartered AccountantVINOD N NIKAM & CO
Chartered AccountantJAYESH N JAIN & ASSOCIATES
PartnerRole in project
REALCON LANDMARKS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Oct 2024

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Viva city.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 02_Viva City.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 03_Viva City.pdf21 Apr 2026
Withdrawal Update Form 1File: FORM 1_VIVA CITY.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 02_Viva City.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 03_Viva City.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A_Viva City.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: Form 05_Viva City.pdf7 Nov 2025
Withdrawal Update Form 1File: FORM 1- VIVA CITY.pdf25 Oct 2025
Withdrawal Update Form 2File: Form 02_Viva City.pdf25 Oct 2025
Withdrawal Update Form 3File: Form 03_Viva City.pdf25 Oct 2025
Withdrawal Update Form 1File: Viva city.pdf1 Aug 2025
Withdrawal Update Form 2File: Form 02_Viva City.pdf1 Aug 2025
Withdrawal Update Form 3File: Form 03_Viva City.pdf1 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Viva City.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Viva City.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_K VIVA CITY.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_VIVA CITY.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_VIVA CITY.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Viva city.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_VIVA CITY.pdf3 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Viva city oc.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Viva city.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Viva city.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Viva city.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Viva City.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 Q1 FY 24-25 VIVA CITY.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 Q1 FY 24-25 VIVA CITY.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 VIVA CITY.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VIVA CITY.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VIVA CITY.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIVA CITY.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIVA CITY Q4 21 22.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIVA CITY Q1 22 23.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Viva City Q1 22 23.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 22-23.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 23-24.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 23-24.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 22-23.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 23-24.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 23-24.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 22-23.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 22-23.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 23-24_1.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 23-24.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 21 22.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 22 23.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 22 23.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 21 22.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 22 23.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 22 23.pdf13 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vivacity.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Viva City.PDF5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230630 -Viva City- Form 1.pdf24 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20230710_Form 2_Viva city.pdf24 Jul 2023
Layout approvalFile: 1-34_compressed.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 1-34_compressed.pdf23 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 230117 - CC - Revised.pdf23 Feb 2023
Declaration about Commencement CertificateFile: Viva City CC declaration.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: kohinoor viva city date-14-01-23_compressed.pdf12 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Viva City.pdf12 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: viva city.pdf12 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: viva city_compressed.pdf12 Feb 2023
Layout approvalFile: 1881_1_compressed.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: 1881_1_compressed.pdf14 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: 220810 - CC_compressed.pdf14 Oct 2022
Declaration about Commencement CertificateFile: CC Declaration (1).pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Vivacity.pdf1 Oct 2022
Proforma of Allotment letterFile: Dhanori 9 Draft new-01-02-2022 (2).pdf9 Feb 2022
CERSAI detailsFile: CERSAI_Realcon.pdf27 Nov 2021
Copy of the legal title reportFile: RERA -TSR-24-11-2021.pdf26 Nov 2021
Declaration about Commencement CertificateFile: FormatD_declaration.pdf26 Nov 2021
Declaration in FORM BFile: FormB.pdf26 Nov 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT TOSELL ALLOTMENT LETTER.pdf26 Nov 2021
PAN CardFile: PAN-Realcon landmark LLP.pdf17 Nov 2021
Layout approvalFile: Vivacity- LAYOUT.pdf12 Nov 2021
Building plan approvalFile: 4-18 - A - FLOOR PLANS_compressed.pdf12 Nov 2021
Building plan approvalFile: 9-18 - B - FLOOR PLANS_compressed.pdf12 Nov 2021
Building plan approvalFile: 15-18 - F - FLOOR PLANS_compressed.pdf12 Nov 2021
Details of encumbrancesFile: No emcumbrance_Dhanori.pdf12 Nov 2021

How this compares with Pune

96%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIVACITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE DHANORI, TAL PUNE CITY, PUNE13,700+ in Pune

2 kmVIVACITYCompleted 81Lapsed / revoked 21Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: REALCON LANDMARKS LLP

REALCON LANDMARKS LLP has 1 registration on MahaRERA, including VIVACITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VIVACITY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIVACITY?

The registered promoter entity is REALCON LANDMARKS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIVACITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIVACITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIVACITY?

The professionals named in the filing: Architect: VK A ARCHITECTURE; Engineer: PLANEDGE CONSULTANTS PVT LTD; Chartered Accountant: BHANDARI S A A J & ASSOCIATES; Chartered Accountant: VINOD N NIKAM & CO; Chartered Accountant: JAYESH N JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIVACITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIVACITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIVACITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.