Home / Browse projects / Pune, Maharashtra / Shubh Nirvana Wing K L M
Shubh Nirvana Wing K L M
By Viman Nagar Shubh Ventures LLP
RG-MH-32837 · RERA P52100080464 · Last updated on MahaRERA portal: 26 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shubh Nirvana Wing K L M is a Others project by Viman Nagar Shubh Ventures LLP in Pune, Maharashtra, registered with MahaRERA as P52100080464 on 6 Jun 2025. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 31 of the 146 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete.
At a glance
Project
- NameShubh Nirvana Wing K L M
- TypeOthers
- Location
- Viman Nagar
- LOHGAON
- Haveli
- Pune
- 411047
- Pincode411047
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100080464
- ReraGenie IDRG-MH-32837
Builder
- NameViman Nagar Shubh Ventures LLP
- Entity typePartnership
- PartnersVishal Sumerchand Agarwal, Suraj Sumerchand Agarwal, Rameshchand Sitaram Agarwal, Sagar Rameshchand Agarwal, Kailash Ramkumar Agarwal, Jagmohan Satyanarayan Mittal, Anand Hariram Bansal, Anuj Balkrishan Agarwal, Rajesh Satyanarayan Mittal, Anshul Anand Bansal
- Other registrations5 more →
- Completed1 of 6
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Jun 2025
- Promised completion30 Apr 2029
- Revised completionRevised to 30 Apr 2029 (originally 30 Dec 2028)
- Buildings3 building records
- Documents filed97 files
Current status
Figures as on 26 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing K | NA | 14 | 11 | 39 | 9 | 48 |
| Wing L | NA | 14 | 11 | 39 | 9 | 48 |
| Wing M | NA | 14 | 11 | 40 | 10 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 26 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 80%.
Wing K73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing L63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing M56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed306
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing K | 103 | 103 |
| Wing L | 102 | 102 |
| Wing M | 101 | 101 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing K | NA | Rs 18.58 cr | Rs 7.91 cr |
| Wing L | NA | Rs 18.58 cr | Rs 7.91 cr |
| Wing M | NA | Rs 18.58 cr | Rs 7.91 cr |
| - | NA | Rs 9.83 cr | Rs 4.19 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubix Architects Associates |
| Engineer | Planedge Consultants Pvt Ltd |
| Engineer | Sangram Yadav |
| Chartered Accountant | Agarwal Sarawgi and Associates |
| Chartered Accountant | Patel & Sharma |
| Chartered Accountant | Dipali Shelar and Company |
| Partner | Role in project |
|---|---|
| Viman Nagar Shubh Ventures LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jan 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jan 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2029
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Phase V NIRVANA - FORM 2A-FY 2025-26.pdf | 26 Sep 2026 |
| Form 5 (FY 2025-2026)File: Phase V NIRVANA - FORM 5 FY 25-26.pdf | 16 Sep 2026 |
| Withdrawal Update Form 1File: Form 1 Phase V Jun 26.pdf | 4 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Phase V Jun 26.pdf | 4 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Phase V Jun 26.pdf | 4 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1 WING K L M MAR 26.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: FORM 2 WING K L M MAR 26.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: FORM 3 WING K L M MAR 26.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form1 Wing KLM Dec 25.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: Form2 Wing KLM Dec 25.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: Form3 Wing KLM Dec 25.pdf | 10 Feb 2026 |
| Layout approvalFile: 01-45 Layout -Highlighted_11zon.pdf | 2 Jan 2026 |
| Layout approvalFile: 02-45 Parking Layout_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 36-45 Wing K.pdf | 2 Jan 2026 |
| Building plan approvalFile: 36-45 Wing K.pdf | 2 Jan 2026 |
| Building plan approvalFile: 37-45 wing k 2_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 38-45 WIng K sec elevation.pdf | 2 Jan 2026 |
| Building plan approvalFile: 39-45 Wing L_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 39-45 Wing L_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 40-45 Wing L 1_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 41-45 Wing L Sec elevation.pdf | 2 Jan 2026 |
| Layout approvalFile: 42-45 Wing M_11zon.pdf | 2 Jan 2026 |
| Layout approvalFile: 42-45 Wing M_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 43-45 Wing M 2_11zon.pdf | 2 Jan 2026 |
| Building plan approvalFile: 44-45 Wing M Sec elevation.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Nirvana Phase V.pdf | 5 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Nirvana Phase V.pdf | 5 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Nirvana Phase V.pdf | 5 Dec 2025 |
| CERSAI detailsFile: Latest Cersai report.pdf | 27 May 2025 |
| Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMBRANCES CONCERNED TO FINANCE.pdf | 16 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 16 May 2025 |
| CERSAI detailsFile: UNDERTAKING FOR NO CHARGE.pdf | 16 May 2025 |
| Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCES CONCERNED TO FINANCE.pdf | 16 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF FINANCE - NIRVANA.pdf | 16 May 2025 |
| Declaration about Commencement CertificateFile: Format D.pdf | 15 May 2025 |
| Declaration about Commencement CertificateFile: CC Verification.pdf | 15 May 2025 |
| Layout approvalFile: 2 Parking Layout.pdf | 3 May 2025 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 3 May 2025 |
| Details of encumbrances concerned to FinanceFile: DECLARATION CONCERNED TO FINANCE.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: 2 Parking Layout.pdf | 3 May 2025 |
| Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf | 3 May 2025 |
| Declaration in FORM BFile: Form B.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf | 3 May 2025 |
| Other - LegalFile: 191-203_compressed.pdf | 3 May 2025 |
| Other - LegalFile: 161-190_compressed final.pdf | 3 May 2025 |
| Other - LegalFile: 131-160_compressed.pdf | 3 May 2025 |
| Other - LegalFile: 51-100_compressed.pdf | 3 May 2025 |
| Other - LegalFile: 1-50_compressed.pdf | 3 May 2025 |
| Other - LegalFile: 101-130_compressed.pdf | 3 May 2025 |
| Details of encumbrances concerned to LegalFile: DECLARATION CONCERNED TO FINANCE.pdf | 3 May 2025 |
| Other - TechnicalFile: CLARIFICATION LAND AREA.pdf | 3 May 2025 |
| Other - TechnicalFile: Declaration cum undertaking order 50 03-05-2025.pdf | 3 May 2025 |
| Proforma of Agreement for saleFile: Model Agreement For Sale.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 03 DOI Anand Bansal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 09 DOI Kailash Agarwal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 08 DOI Jagmohan Mittal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 07 DOI Suraj Agarwal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 06 DOI Sagar Agarwal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 05 DOI Ramesh Agarwal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 04 DOI Anshul Bansal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 02 DOI Anuj Agarwal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 01 DOI Vishal Agarwal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 00 DOI Rajesh Mittal.pdf | 3 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 DOI Vimanagar ventures LLp.pdf | 3 May 2025 |
| Building plan approvalFile: 45 Wing Club.pdf | 2 May 2025 |
| Details of encumbrances concerned to FinanceFile: 01 Declartion of encumberance Legal.pdf | 2 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 45 Wing Club.pdf | 2 May 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 2 May 2025 |
| Deviation Report with respect to Allotment letterFile: 03 Deviation allotment letter.pdf | 2 May 2025 |
| Details of encumbrances concerned to LegalFile: 01 Declartion of encumberance Legal.pdf | 2 May 2025 |
| Other - TechnicalFile: 02 Authority Letter.pdf | 2 May 2025 |
| Other - TechnicalFile: 07Clarification amenities space.pdf | 2 May 2025 |
| Deviation Report with respect to model copy of AgreementFile: 04 Deviation ATS.pdf | 2 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 2 May 2025 |
| Layout approvalFile: 1 Layout Plan Copy 2.pdf | 25 Apr 2025 |
| Building plan approvalFile: 36 Wing K.pdf | 25 Apr 2025 |
| Building plan approvalFile: 37 Wing K.pdf | 25 Apr 2025 |
| Building plan approvalFile: 38 Wing K.pdf | 25 Apr 2025 |
| Building plan approvalFile: 39 Wing L.pdf | 25 Apr 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| VNSVL Shubh Nirvana Phase IVP52100055359 | Viman Nagar, Pune | 136 | Mar 2024 | Ongoing | Jun 2027 | Not due yet |
| VNSVL Shubh Nirvana Phase IIIP52100055241 | Viman Nagar, Pune | 132 | Mar 2024 | Ongoing | Dec 2026 | Not due yet |
| VNSVL Shubh Nirvana - Phase IIP52100050937 | Viman Nagar, Pune | 114 | May 2023 | Ongoing | Jun 2026 | Not delivered |
| VNSVL Shubh Nirvana Phase 1P52100031263 | Viman Nagar, Pune | 158 | Oct 2021 | Ongoing | Dec 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shubh Nirvana Wing K L M on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Viman Nagar13,700+ in Pune
Filed coordinates, straight-line distance. 49 registered projects within 2 km.
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Builder: Viman Nagar Shubh Ventures LLP
Viman Nagar Shubh Ventures LLP has 6 registrations on MahaRERA, including VNSVL Shubh Infinity and VNSVL Shubh Nirvana Phase 1. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Shubh Nirvana Wing K L M is delayed beyond 30 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shubh Nirvana Wing K L M?
The registered promoter entity is Viman Nagar Shubh Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shubh Nirvana Wing K L M?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shubh Nirvana Wing K L M?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shubh Nirvana Wing K L M?
The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Planedge Consultants Pvt Ltd; Engineer: Sangram Yadav; Chartered Accountant: Agarwal Sarawgi and Associates; Chartered Accountant: Patel & Sharma; Chartered Accountant: Dipali Shelar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shubh Nirvana Wing K L M?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback