Completed No litigation declared Residential / Group Housing project

VNSVL Shubh Nirvana Phase 1

By Viman Nagar Shubh Ventures LLP

RG-MH-22400 · RERA P52100031263 · Last updated on MahaRERA portal: 13 Jan 2026

Source: official MahaRERA filing

Red flags

  • Rs 60.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
21 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
8 of 158Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 192 documents Report an error

VNSVL Shubh Nirvana Phase 1 is a Residential / Group Housing project by Viman Nagar Shubh Ventures LLP in Pune, Maharashtra, registered with MahaRERA as P52100031263 on 15 Oct 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 150 of the 158 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete.

At a glance

Project

  • NameVNSVL Shubh Nirvana Phase 1
  • TypeResidential / Group Housing
  • Location
    • Viman Nagar
    • LOHGAON
    • Haveli
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031263
  • ReraGenie IDRG-MH-22400

Builder

  • NameViman Nagar Shubh Ventures LLP
  • Entity typePartnership
  • PartnersVishal Sumerchand Agarwal, Suraj Sumerchand Agarwal, Rameshchand Sitaram Agarwal, Sagar Rameshchand Agarwal, Kailash Ramkumar Agarwal, Jagmohan Satyanarayan Mittal, Anand Hariram Bansal, Anuj Balkrishan Agarwal, Rajesh Satyanarayan Mittal, Anshul Anand Bansal
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Oct 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed192 files

Current status

95%150 of 158 units booked
88.3%Work done, per cost certificate

Figures as on 13 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA1212471259
Wing BNA121244044
Wing CNA121255055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Wing A95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Wing B93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Wing C93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30
BuildingClosed/CoveredTotal
Wing A1010
Wing B1010
Wing C1010

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,738 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on14 Aug 2025
LandownerVillageDistrict
Viman Nagar Shubh Ventures LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI53900.62
Proposed, not sanctioned23,639 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9/2, Kalpataru Gardens, Boat Club Road, Pune 411001
Estimated costRs 145.00 cr
Cost incurredRs 128.09 cr
Work done88.34%
BuildingWingEstimatedIncurred
Wing ANARs 40.60 crRs 35.87 cr
Wing BNARs 40.60 crRs 35.87 cr
Wing CNARs 40.60 crRs 35.87 cr
-NARs 23.20 crRs 20.49 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerPlanedge Consultants Pvt Ltd
EngineerSangram Yadav
Chartered AccountantAgarwal & Co
Chartered AccountantA S A K & Co Chartered Accountants
Chartered AccountantPatel and Sharma Chartered Accountants
Chartered AccountantAgarwal Sarawgi & Company
PartnerRole in project
Viman Nagar Shubh Ventures LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed192

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 192 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Declaration for Part OC_0001.pdf13 Jan 2026
Occupational CertificateFile: Part OC - Nirvana Phase 1.pdf13 Jan 2026
Occupational CertificateFile: CC -commencement certificate 07-08-2025.pdf13 Jan 2026
Occupational CertificateFile: 01-45 Layout - highlighted_11zon.pdf13 Jan 2026
Occupational CertificateFile: Declaration for completion Phase I.pdf13 Jan 2026
Occupational CertificateFile: 02-45 Parking Layout.pdf13 Jan 2026
Occupational CertificateFile: 03-45 Wing A.pdf13 Jan 2026
Occupational CertificateFile: 04-45 Wing A 1.pdf13 Jan 2026
Occupational CertificateFile: 05-45 Wing A Section Elevation.pdf13 Jan 2026
Occupational CertificateFile: 06-45 Wing B.pdf13 Jan 2026
Occupational CertificateFile: 07-45 Wing B 1.pdf13 Jan 2026
Occupational CertificateFile: 08-45 Wing B Sec Elevation.pdf13 Jan 2026
Occupational CertificateFile: 09-45 Wing C.pdf13 Jan 2026
Occupational CertificateFile: 10-45 Wing C 1.pdf13 Jan 2026
Occupational CertificateFile: 11-45 Wing C Sec elevation.pdf13 Jan 2026
Form 1File: Form 1 Dec 2022.pdf15 Dec 2025
Form 2File: 5 Form 2 Dec 22.pdf15 Dec 2025
Form 3File: Form 3 Dec 22.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Dec 22.pdf15 Dec 2025
Form 1File: Form 1 Mar 2023.pdf15 Dec 2025
Form 2File: 6 Form 2 Mar 23.pdf15 Dec 2025
Form 3File: Form 3 Mar 23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Mar 23.pdf15 Dec 2025
Form 1File: Form 1 Jun 2023.pdf15 Dec 2025
Form 2File: 7 Form 2 Jun 23.pdf15 Dec 2025
Form 3File: Form 3 Jun 23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Jun 23.pdf15 Dec 2025
Form 1File: Form 1 Sep 2023.pdf15 Dec 2025
Form 2File: 8 Form 2 Sept 23.pdf15 Dec 2025
Form 3File: Form 3 Sept 23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Phase I-Sept 23.pdf15 Dec 2025
Form 1File: Form 1 Dec 2023.pdf15 Dec 2025
Form 2File: 9 Form 2 Dec 23.pdf15 Dec 2025
Form 3File: Form 3 Dec 23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Phase I-dEC 23.pdf15 Dec 2025
Form 1File: Form 1 Mar 2024.pdf15 Dec 2025
Form 2File: 10 Form 2 Mar 24.pdf15 Dec 2025
Form 3File: Form 3 Mar 24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Phase I-Mar 24.pdf15 Dec 2025
Form 1File: Form 1 Jun 2024.pdf15 Dec 2025
Form 2File: 11 Form 2 Jun 24.pdf15 Dec 2025
Form 3File: Form 3 Jun 24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Jun 24.pdf15 Dec 2025
Form 1File: Form 1 Sep 2024.pdf15 Dec 2025
Form 2File: 12 Form 2 - Sept 24.pdf15 Dec 2025
Form 3File: Form 3 Sept 24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Sept 24.pdf15 Dec 2025
Form 1File: Form 1 Dec 2024.pdf15 Dec 2025
Form 2File: 12 Form 2 - Dec 2024.pdf15 Dec 2025
Form 3File: Form 3 Phase 1 Dec 24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-dEC 24.pdf15 Dec 2025
Form 1File: Form 1 Nirvana Phase 1 Dec 21.pdf13 Dec 2025
Form 2File: 1 Form 2 Dec 21.pdf13 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Dec 21.pdf13 Dec 2025
Form 3File: Form 3 Dec 21.pdf13 Dec 2025
Form 1File: Form 1 Niravan Phase 1 Mar 22.pdf13 Dec 2025
Form 2File: 2 Form 2 Mar 22.pdf13 Dec 2025
Form 3File: Form 3 Mar 22.pdf13 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Mar 22.pdf13 Dec 2025
Form 1File: Form 1 Nirvana Phase 1 Jun 22.pdf13 Dec 2025
Form 2File: 3 Form 2 Jun 22.pdf13 Dec 2025
Form 3File: Form 3 Jun 22.pdf13 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Jun 22.pdf13 Dec 2025
Form 1File: Form 1 Nirvana Phase 1 Sept 22.pdf13 Dec 2025
Form 2File: 4 Form 2 Sept 22.pdf13 Dec 2025
Form 3File: Form 3 Sept 22.pdf13 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Phase I-Sept 22.pdf13 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf4 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf4 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf22 Nov 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE- PHASE I.pdf22 Nov 2025
Withdrawal Update Form 3File: Nirvana Phase 1.pdf22 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A- PHASE I FY 24-25.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 - PHASE I FY 24-25.pdf13 Oct 2025
Form 1File: Form1.pdf26 Sep 2025
Form 2File: FORM 2.pdf26 Sep 2025
Form 3File: Form 3_Signed.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold phase I.pdf26 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 ph 1 dec 24_0001-signed.pdf23 Apr 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VNSVL Shubh Nirvana Phase IVP52100055359Viman Nagar, Pune136Mar 2024OngoingJun 2027Not due yet
VNSVL Shubh Nirvana Phase IIIP52100055241Viman Nagar, Pune132Mar 2024OngoingDec 2026Not due yet
VNSVL Shubh Nirvana - Phase IIP52100050937Viman Nagar, Pune114May 2023OngoingJun 2026Not delivered

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VNSVL Shubh Nirvana Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Viman Nagar13,700+ in Pune

2 kmVNSVL Shubh Nirvana PhasCompleted 13Lapsed / revoked 11Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: Viman Nagar Shubh Ventures LLP

Viman Nagar Shubh Ventures LLP has 6 registrations on MahaRERA, including VNSVL Shubh Infinity and VNSVL Shubh Nirvana Phase 1. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VNSVL Shubh Nirvana Phase 1 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VNSVL Shubh Nirvana Phase 1?

The registered promoter entity is Viman Nagar Shubh Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VNSVL Shubh Nirvana Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VNSVL Shubh Nirvana Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VNSVL Shubh Nirvana Phase 1?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Planedge Consultants Pvt Ltd; Engineer: Sangram Yadav; Chartered Accountant: Agarwal & Co; Chartered Accountant: A S A K & Co Chartered Accountants; Chartered Accountant: Patel and Sharma Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VNSVL Shubh Nirvana Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VNSVL Shubh Nirvana Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VNSVL Shubh Nirvana Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.