Home / Browse projects / Pune, Maharashtra / Divine Garden Phase II
Divine Garden Phase II
RG-MH-66877 · RERA P52100050974 · Last updated on MahaRERA portal: 20 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Divine Garden Phase II is a Residential / Group Housing project by SHRIRAM ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100050974 on 16 May 2023. Possession is promised by 31 Dec 2026. 35 of the 304 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameDivine Garden Phase II
- TypeResidential / Group Housing
- Location
- Lohgaon
- Swami Samarth Nagar
- Lohgaon
- Haveli
- Pune
- 411047
- Pincode411047
- RERA no.P52100050974
- ReraGenie IDRG-MH-66877
Builder
- NameSHRIRAM ASSOCIATES
- Entity typePartnership
- PartnerAnil Ramkishan Agrawal
- Other registrations3 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed84 files
Current status
Figures as on 20 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A7 | NA | 13 | 10 | 108 | 0 | 108 |
| Wing A8 | NA | 13 | 10 | 108 | 0 | 108 |
| Wing B1 | NA | 13 | 10 | 88 | 0 | 88 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
Wing A740%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 2% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A851%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 16% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 7% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B165%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 75% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 23% |
| Sanitary Fittings within the flats / premises | 32% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 74% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 22% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed321
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A7 | 114 | 114 |
| Wing A8 | 114 | 114 |
| Wing B1 | 93 | 93 |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sunita Ramkrushnahari Nimbalkar | Lahagaon | Pune |
| Baban Sahadu Nimbalkar and Others | Lahagaon | Pune |
| Pramanand Baldeo Mahto | Lahagaon | Pune |
| Anilkumar Asharfi Mehta | LOHGAON | Pune |
| Amrendra Asharfi Mehta | LOHGAON | Pune |
| Gulab Dyanoba Nimbalakar and Others | LOHGAON | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A7 | NA | Rs 23.79 cr | Rs 3.61 cr |
| Wing A8 | NA | Rs 23.79 cr | Rs 8.77 cr |
| Wing B1 | NA | Rs 23.79 cr | Rs 13.16 cr |
| - | NA | Rs 3.76 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sandeep Hardikar |
| Architect | Abhiraj Mahadik |
| Engineer | S K Consultants & Engineers |
| Engineer | SHUBHAM TIKE |
| Chartered Accountant | HS Sharma and Co |
| Chartered Accountant | Patel and Sharma |
| Chartered Accountant | YMK & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHRIRAM ASSOCIATES | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 929/2023/2023 | Commercial court pune | arbitration is invoked |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504713 | Mamta Bansal | SHRIRAM ASSOCIATES | 31/12/2025 |
| CC12600168 | ASHISH LOKHANDE | SHRIRAM ASSOCIATES | 10/01/2026 |
| CC12600371 | Sundeep Wanchoo | SHRIRAM ASSOCIATES | 20/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Form 1File: Form 1.pdf | 26 Dec 2025 |
| Form 2File: Form 2.pdf | 26 Dec 2025 |
| Form 3File: Form 3.pdf | 26 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Cirular.pdf | 26 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase II Dec 24 - Final.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden Phase II as on Dec 2024.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Divine Garden Phase 2 as on December 2024.pdf | 6 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Divine Garden Phase II as on Sept 2024.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden Phase II as on Sept 2024.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PH 2 Sep .pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden Phase II as on June 2024.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Divine Garden Phase II as on June 2024.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Divine Garden Phase II as on June 2024.pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2 March 2024_compressed.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden Phase II as on March 2024.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ph -2 CA Certificate March 24 _compressed.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2) (8).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MN.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden Phase II as on Dec 2023.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Divine Garden Phase II as on Dec 2023.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase II Dec 23 (1).pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Divine Garden Phase-2 June 2023.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Divine Garden Phase 2 September 2023.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Divine Garden PH 2 as on Dec 2023_compressed.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden PH2 as on June 2023.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden PH2 as on Sept 2023.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Divine Garden PH2 as on June 2023.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Divine Garden PH2 as on Sept 2023.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Divine Garden Phase II as on June 2023.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Divine Garden Phase II as on Sep 2023.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Divine Garden Phase 2 as on Sep 2023.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Jun 23 Shriram Associates - Divine Garden Phase 2.pdf | 27 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Divine Garden Phase 2.pdf | 26 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Divine Garden Phase-II 30-06-23.pdf | 1 Aug 2023 |
| Declaration in FORM BFile: Form B-Promoter_compressed.pdf | 15 May 2023 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (2).pdf | 28 Apr 2023 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 28 Apr 2023 |
| Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf | 28 Apr 2023 |
| Building plan approvalFile: Plan-6-7_11zon.pdf | 28 Apr 2023 |
| Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf | 28 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (2).pdf | 28 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 28 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf | 28 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan-6-7_11zon.pdf | 28 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf | 28 Apr 2023 |
| Proforma of Allotment letterFile: Allotment - Divine Garden Phase II.pdf | 27 Apr 2023 |
| Proforma of Agreement for saleFile: shriram Associates- Divine Garden Phase 2 21-04-2023 (1).pdf | 27 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report ph 2_compressed (1).pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Rera Ph-2_11zon.pdf | 26 Apr 2023 |
| Other - LegalFile: Rera declaration phase 2.pdf | 26 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation report.pdf | 25 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Rera Ph 2 Encumbarance Finance.pdf | 21 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Litigation.pdf | 21 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Rera Ph 2 Encumbarance Finance.pdf | 21 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter- Litigation.pdf | 21 Apr 2023 |
| CERSAI detailsFile: Rera Ph -2 Cersai.pdf | 21 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (5).pdf | 21 Apr 2023 |
| Other - TechnicalFile: Rera declaration phase 2.pdf | 21 Apr 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 18 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 18 Apr 2023 |
| Layout approvalFile: Plan_1-1_11zon.pdf | 13 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Divine Garden Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Swami Samarth Nagar, Lohgaon13,700+ in Pune
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
NIVASA ENCHANTE - PHASE III
NIVASA ASSOCIATES
Builder: SHRIRAM ASSOCIATES
SHRIRAM ASSOCIATES has 4 registrations on MahaRERA, including HIGHFIELD PARK and VIVAAN PARK. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Divine Garden Phase II is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Divine Garden Phase II?
The registered promoter entity is SHRIRAM ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Divine Garden Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Divine Garden Phase II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Divine Garden Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Divine Garden Phase II?
The professionals named in the filing: Architect: Sandeep Hardikar; Architect: Abhiraj Mahadik; Engineer: S K Consultants & Engineers; Engineer: SHUBHAM TIKE; Chartered Accountant: HS Sharma and Co; Chartered Accountant: Patel and Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Divine Garden Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback