Red flags
- 28 complaints at MahaRERA
- Completion date moved by 66 months
- 4 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Solitaire Business Hub Viman Nagar Phase 1 is a Commercial project by Classic Promoters and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100006995 on 17 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 66 months from the original filing. 277 of the 289 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 28 complaints are on record with the regulator.
At a glance
Project
- NameSolitaire Business Hub Viman Nagar Phase 1
- TypeCommercial
- Location
- Pune
- Vimannagar
- LOHGAON
- Haveli
- 411047
- Pincode411047
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100006995
- ReraGenie IDRG-MH-20959
Builder
- NameClassic Promoters and Builders Private Limited
- Entity typeCompany
- CINU70101MH1988PTC047131
- GSTIN27AABCC1200C1ZN
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorAshok Dhanraj Chordia
- Other registrations14 more →
- Completed4 of 15
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2022)
- Buildings1 building record
- Documents filed369 files
Current status
Figures as on 21 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A-B, C-D, E-F, G-H CORE | NA | 11 | 10 | 0 | 289 | 289 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 99%.
A-B, C-D, E-F, G-H CORE: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 99% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 98% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 96% |
| Electrical meter room, sub-station, receiving station | Yes | 94% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4103
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A-B, C-D, E-F, G-H CORE | NA | Rs 170.42 cr | Rs 170.42 cr |
| - | NA | Rs 96.78 cr | Rs 96.78 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANA Consortium Pvt Ltd |
| Engineer | Akash Aghav |
| Engineer | Rohit Gore |
| Engineer | Rohan Naik |
| Chartered Accountant | SPAK & Co. |
| Chartered Accountant | Bogati & Co. |
| Partner | Role in project |
|---|---|
| Classic Promoters and Builders Private Limited | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs Covid 19 has impacted all the sectors and real estate is not an exception from them. Many hurdles emerged with the beginning of the pandemic.We faced difficulty as there was a lack of essential raw material and unavailabiilty of manufacturing equipment has halted the construction activity. With imposition of international trade restrictions amid pandemic ,supply lines have been struck short and as a consequence inflation hit high and resulted inincreasing the price of inputs required for project. As a result project under construction experienced a delay .So please grant us the requested ex
Reason as filed by the promoter1. The project, initially developed by Marvel Edge Realtors Private Limited, was transferred to Classic Promoters and Builders Private Limited , due to default committed by the erstwhile Developer. 2. A major fire broke out on May 9, 2023, causing significant damage and halting construction 3. Restoration work, including demolition of damaged material, lift/elevator parts replacement, and installation of a new duct system, was required 4. The restoration process took around six months, impacting the construction timeline 5. Construction of all floors except the ninth has been completed, and a
Reason as filed by the promoterFirstly, we would like to inform you that Classic Promoters and Builders Private Limited acquired the said project from Marveledge Realtors Pvt Ltd on 31st December 2019, vide Deeds of Conveyance registered in the office of Sub-Registrar, Haveli No. 10, Pune at Sr. Nos. 29103-2019 & 29104-2019. Since the acquisition, we have diligently worked towards the successful completion of the project. Initially, the RERA Registration for the said Project was obtained for a total of nine floors, with a stipulated completion date of 30th June 2023. We are pleased to inform you that we have successfully co
Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 27/07/2026, we request you kindly to grant us extension till 31/12/2027.
Complaints filed with MahaRERA28
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000010407 | 1. Mustafa Husain Kanchwala; 2. Abbas Ali Kanchwala | 1. Marveledge Realtors Pvt. Ltd. 2. Vishwajeet Subhash Jhavar; 3. Mahesh Bansilal Laddha | 12/10/2017 |
| CC005000000010561 | Mohit Nanik Khubchandani | Marveledge Realtors Pvt Ltd | 13/11/2017 |
| CC005000000010574 | MODISON METALS LIMITED | MARVELEDGE REALTORS PRIVATE LIMITED | 17/11/2017 |
| CC005000000010552 | PANNA ASHER AND HARESH ASHER | MARVELEDGE REALTORS PVT. LTD. AND MR. VISHWAJEET SUBHASH JHAVAR | 16/11/2017 |
| CC005000000010647 | MULTI-ACT REALTY ENTERPRISES PVT. LTD. | MARVELEDGE REALTORS PRIVATE LIMITED | 08/12/2017 |
| CC005000000011459 | MRS. HEMLATA ASHOK AGARWAL | M/ S. MARVELEDGE REALTORS PRIVATE LIMITED | 25/04/2018 |
| CC005000000011554 | NISHANT PRAMOD RAISONI | MARVEL EDGE REALTORS PVT LTD | 05/07/2018 |
| CC005000000011604 | Quick Heal Technologies Limited | MARVELEDGE REALTORS PRIVATE LIMITED | 05/06/2018 |
| CC005000000177902 | Krishna Ganesan | Classic Promoters and Builders Pvt Ltd | 07/12/2022 |
| CC005000000023061 | M/s. Birendra Nath Paul | M/s. Marveledge Realtors Private Limited | 21/05/2019 |
| CC005000000053832 | RITESH R.SRIVASTAVA | Marveledge Realtors Private Limited | 27/12/2019 |
| CC005000000095983 | ABHISHEK RAMESHKUMAR MORE | MARVEL REALTORS AND DEVELOPERS PVT. LTD | 07/09/2021 |
| CC005000000106624 | Krishnakant G. Pittie | Classic Promoters and Builder Pvt Ltd | 20/03/2022 |
| CC005000000167569 | Dilip Bhattu Karanjule | Marveledge Realtors Private Limited through its authorised representative Vishwajeet Jhavar | 13/09/2022 |
| CC005000000167631 | Sunil Nagendar Pawar | Marvel Edge Realtors Privat Limited | 18/10/2022 |
| CC005000000198091 | Jannhavi Investment Pvt. Ltd. | Classic Promoters and Buiilders Pvt. Ltd. | 12/01/2023 |
| CC005000000198094 | Rajgad Trading Copany Pvt. Ltd. | Classic Promoters and Buiilders Pvt. Ltd. | 12/01/2023 |
| CC005000000198095 | Wathar Investment Trading Pvt. Ltd. | Classic Promoters and Buiilders Pvt. Ltd. | 12/01/2023 |
| CC005000000238580 | RAVI BAJRANGLAL CHAMADIA | ATUL ASHOK CHORIDA | 07/04/2023 |
| CC005000000310566 | GOVIND RADHESHYAM KILLA | CLASSIC PROMOTERS AND BUILDERS PRIVATE LIMITED | 06/03/2024 |
| CC005000000441099 | Sabin Mathew | Classic Promoters And Builders Pvt Ltd | 29/06/2024 |
| CC12400166 | Prakash Manohar Jagwani | Classic Promoters and Builders Private Limited | 21/09/2024 |
| CC12401234 | SUNILA MADHUKAR KOTWAL | Marveledge Realtors Pvt Ltd | 25/12/2024 |
| CC12500190 | KUMAR JAY MODI | Classic Promoters and Builders Private Limited | 20/01/2025 |
| CC12501019 | Panna Asher | Classic Promoters and Builders Private Limited | 26/03/2025 |
| CC12504600 | GOVIND KILLA | Classic Promoters and Builders Private Limited | 23/12/2025 |
| CC12600016 | RAVI BAJRANGLAL CHAMADIA | Classic Promoters and Builders Private Limited | 02/01/2026 |
| CC12600059 | Vishal Subhashbhai Poojara | Classic Promoters and Builders Private Limited | 04/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Apr 2024
Documents filed369
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 369 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - SBH VN PH - I - Jun 25.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1- SBH Viman nagar - PH I - Sept 2025.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1- SBH VN - PH I - Dec 2025.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form -1- SBH Vimananagar - Mar 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - SBH Vimannagar -PH - I- Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - SBH VN PH - I - Jun 25.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2- SBH Viman nagar - PH I - Sept 2025.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - SBH Vimannagar - Dec 2025.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - SBH Vimannagar - Mar 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form -2- SBH Vimananagar - Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 SBH VN PH Jun 25 (1).pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3- SBH Viman nagar - PH I - Sept 2025.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3- SBH Vimannagar PH - Dec 2025.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form -3- SBH Vimananagar - Mar 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH Vimannagar Ph - I - Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: Form 1- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: Form 1- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: Form 1- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: Form 2- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: Form 2- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: Form 2- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: Form 2- SBH VN-PH-I _ Mar 2025.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH Vimannagar Ph I - Mar 25.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH Vimannagar Ph I - Mar 25.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH Vimannagar Ph I - Mar 25.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - SBH Vimannagar Ph I - Mar 25.pdf | 19 Aug 2026 |
| Certificates of CA (Form 3)File: Form 3 - SBH VN PH - I - Jun 25_compressed.pdf | 25 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SBH VN PH - I - Jun 25.pdf | 25 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - SBH VN PH I - Jun 25.pdf | 25 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SBH VN PH - I - Jun 25.pdf | 21 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH VN-PH-I _ Mar 2025.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 - SBH Vimannagar Ph I - Mar 25_compressed.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- SBH VN-PH-I _ Mar 2025.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SBH VN Sold Disclsoure - Jun 23_compressed.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SBH VN Phase I June 24 Sold Disclosure_compressed.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - SBH VN- Bldg.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - SBH VN - Mar 25.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - SBH Vimannagar- Mar 25.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH Vimannagar - Jun 2024.pdf | 7 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3- SBH VN - Jun 24_compressed.pdf | 7 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3- SBH VN - Sept 24_compressed.pdf | 7 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- SBH Vimannagar - Jun 2024.pdf | 7 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- SBH VN - Sept 24.pdf | 7 Apr 2025 |
| Other - TechnicalFile: 1 SBH Vimannagar - BAR Chart - Jun 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 2 SBH Vimannagar - BAR Chart - Jul 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 3 SBH Vimannagar - BAR Chart - Aug 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 4 SBH Vimannagar - BAR Chart - Sept 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 5 SBH Vimannagar - BAR Chart - Oct 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 6 SBH Vimannagar - BAR Chart - Nov 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 7 SBH Vimannagar - BAR Chart - Dec 2024.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 8 SBH Vimannagar - BAR Chart - Jan 2025.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 9 SBH Vimannagar - BAR Chart - Feb 2025.pdf | 4 Apr 2025 |
| Other - TechnicalFile: 10 BAR Chart VN - PER Chart - Mar 25.pdf | 4 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SBH Vimannagar - Dec 24.pdf | 25 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer certificate DEC-24 Viman nagar.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - SBH VN - Dec 24.pdf | 22 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SBH VN - Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure - SBH VN - Dec 24.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SBH VN - Form 5 - FY 23-24.pdf | 24 Dec 2024 |
| Details of encumbrancesFile: Free -Encumbrances Certificate SBH VN.pdf | 13 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SBH VN - Sept 24.pdf | 21 Oct 2024 |
| Layout approvalFile: 1.pdf | 7 Jun 2024 |
| Building plan approvalFile: 2.pdf | 7 Jun 2024 |
| Building plan approvalFile: 3.pdf | 7 Jun 2024 |
| Building plan approvalFile: 4.pdf | 7 Jun 2024 |
| Building plan approvalFile: 5.pdf | 7 Jun 2024 |
| Building plan approvalFile: 6.pdf | 7 Jun 2024 |
| Building plan approvalFile: 7.pdf | 7 Jun 2024 |
| Building plan approvalFile: 8.pdf | 7 Jun 2024 |
| Building plan approvalFile: 9.pdf | 7 Jun 2024 |
| Building plan approvalFile: 10.pdf | 7 Jun 2024 |
| Building plan approvalFile: 11.pdf | 7 Jun 2024 |
| Building plan approvalFile: 12.pdf | 7 Jun 2024 |
| Building plan approvalFile: 13.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 7 Jun 2024 |
| Building Plan Approval (IOD)File: 2.pdf | 7 Jun 2024 |
| Building Plan Approval (IOD)File: 3.pdf | 7 Jun 2024 |
| Building Plan Approval (IOD)File: 4.pdf | 7 Jun 2024 |
| Building Plan Approval (IOD)File: 5.pdf | 7 Jun 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Avalon C-3 | Pimpri Chinchwad Pune 411012 | 47 | Completed | Dec 2019 | Late, Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 369 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Solitaire Business Hub Viman Nagar Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vimannagar13,700+ in Pune
Filed coordinates, straight-line distance. 152 registered projects within 2 km.
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
NIVASA ENCHANTE - PHASE III
NIVASA ASSOCIATES
Builder: Classic Promoters and Builders Private Limited
Classic Promoters and Builders Private Limited has 15 registrations on MahaRERA, including AVALON CITY C-3 and MUDRA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Solitaire Business Hub Viman Nagar Phase 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Solitaire Business Hub Viman Nagar Phase 1?
The registered promoter entity is Classic Promoters and Builders Private Limited, a company as per the filing. Its CIN U70101MH1988PTC047131 and GSTIN 27AABCC1200C1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Solitaire Business Hub Viman Nagar Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Solitaire Business Hub Viman Nagar Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Solitaire Business Hub Viman Nagar Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Solitaire Business Hub Viman Nagar Phase 1?
The professionals named in the filing: Architect: ANA Consortium Pvt Ltd; Engineer: Akash Aghav; Engineer: Rohit Gore; Engineer: Rohan Naik; Chartered Accountant: SPAK & Co.; Chartered Accountant: Bogati & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Solitaire Business Hub Viman Nagar Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback