Home / Browse projects / SHRINIWAS LIVIANO PHASE I

Completed No litigation declared Residential / Group Housing project

SHRINIWAS LIVIANO PHASE I

By GOEL GANGA LANDMARKS LLP

RG-MH-74376 · RERA P52100018256 · Last updated on MahaRERA portal: 26 Apr 2021

Source: official MahaRERA filing

Red flags

  • 13 complaints at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2021Possession promisedregistration recorded completed
29 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 93%
13Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

SHRINIWAS LIVIANO PHASE I is a Residential / Group Housing project by GOEL GANGA LANDMARKS LLP in Kharadi, 411014, registered with MahaRERA as P52100018256 on 17 Oct 2018. The registration is recorded completed; possession was promised by 30 Mar 2021. The completion date has moved by 6 months from the original filing. 13 complaints are on record with the regulator.

At a glance

Project

  • NameSHRINIWAS LIVIANO PHASE I
  • TypeResidential / Group Housing
  • Location
    • Mouje Kharadi
    • Kharadi
    • 411014
  • Pincode411014
  • RERA no.P52100018256
  • ReraGenie IDRG-MH-74376

Builder

  • NameGOEL GANGA LANDMARKS LLP
  • Entity typePartnership
  • PartnersSWARANSINGH GYANSINGH SOHAL, GOEL GANGA SPACE LLP though its Partner Subhash Goel
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredOct 2018First promiseSep 2020Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Oct 2018
  • Promised completion30 Mar 2021
  • Revised completionRevised to 30 Mar 2021 (originally 30 Sep 2020)
  • Buildings4 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA170000
B WINGNA160000
C WINGNA160000
D WINGNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 26 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 93%.

A WING93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises72%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING94%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises72%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises72%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D WING92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises63%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes60%
Open ParkingYes80%

Parking filed392

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots392
Closed/Covered306
Open Space86
BuildingClosed/CoveredOpen SpaceTotal
A WING9836134
B WING641478
C WING611879
D WING8318101

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,184 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21656.54
Proposed, not sanctioned21,657 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMG ROAD BRANCH PUNE CAMP PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Laxman Thite
PartnerRole in project
GOEL GANGA LANDMARKS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006343Sep 2020 → Mar 2021

Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. War, Civil Commotion or Act of God. b. Any notice, order, rule, notification of Government, and/or Municipal or other Public or Competent Authority/Court which prevents the Promoter from carrying out with the work of development and construction on the said Land. c. Any delay on the part of the Municipal Corporation of Pune or any other Public Body or Authority including but not limited to the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permission

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC005000000064851Mukesh GuptaSudhir Darode22/11/2020
CC005000000137150Mukesh GuptaDarode Jog Realities private limited29/05/2022
CC005000000022487Swapnil Santosh TholiyaDarode Jog Realities Private Limited Sudhir Chandrakant Darode and Anand Dhaundiraj Jog21/01/2019
CC005000000022153Vishal Ravindra MadanDarode Jog Realities Pvt Ltd18/10/2018
CC005000000022218Abhishek LaddhaSudhir Darode13/01/2019
CC005000000022238Mr. Asif Akbar ParpiaDarode Jog Realities Private Limited13/11/2018
CC005000000022372Pradeep Surendra SaxenaDarodejog realities pvt ltd23/12/2018
CC005000000022523Sonal MehtaDarode Jog Realities Pvt Ltd10/02/2019
CC005000000022613SURESH G PHADTARESUDHIR CHANDRAKANT DARODE, 2..ANAND DHUNDIRAJ JOG , DIRECTOERS , DARODE JOG REALITIES PVT LTD.04/02/2019
CC005000000022601ZARNA S DOSHI, SUKETU C DOSHIDARODE JOG REALITIES PVT LTD12/02/2019
CC005000000022630ATUL SADRANIDarode Jog Realties Pvt Ltd06/02/2019
CC005000000023422SHRIKANT SUREKASUDHIR CHANDRAKANT DARODE15/09/2019
CC12501469PINAKIN GANGJ SATRAGOEL GANGA LANDMARKS LLP01/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Completion Certificate.pdf26 Apr 2021
OtherFile: Completion Certificate.pdf26 Apr 2021
OtherFile: Triparty_Agreement_A_Bldg_1_16.pdf20 Sep 2019
OtherFile: Triparty_Agreement_A_Bldg_17_25.pdf20 Sep 2019
OtherFile: Triparty_Agreement_A_Bldg_26_45.pdf20 Sep 2019
OtherFile: Triparty_Agreement_A_Bldg_46_65.pdf20 Sep 2019
OtherFile: Triparty_Agreement_A_Bldg_66_84.pdf20 Sep 2019
OtherFile: Triparty_Agreement_A_Bldg_85_108.pdf20 Sep 2019
OtherFile: Triparty_Agreement_B_Bldg_1_16.pdf20 Sep 2019
OtherFile: Triparty_Agreement_B_Bldg_17_18.pdf20 Sep 2019
OtherFile: Triparty_Agreement_B_Bldg_19_22.pdf20 Sep 2019
OtherFile: Triparty_Agreement_B_Bldg_23_39.pdf20 Sep 2019
OtherFile: Triparty_Agreement_B_Bldg_40_52.pdf20 Sep 2019
OtherFile: Triparty_Agreement_B_Bldg_53_88.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_1_16.pdf20 Sep 2019
OtherFile: Triparty_Agreement_D_Bldg_1_16.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_17_18.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_19_22.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_23_25.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_26_43.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_43_59.pdf20 Sep 2019
OtherFile: Triparty_Agreement_C_Bldg_60_90.pdf20 Sep 2019
OtherFile: Triparty_Agreement_D_Bldg_17_32.pdf20 Sep 2019
OtherFile: Triparty_Agreement_D_Bldg_33_50.pdf20 Sep 2019
OtherFile: Triparty_Agreement_D_Bldg_51_70.pdf20 Sep 2019
OtherFile: Triparty_Agreement_D_Bldg_91_117.pdf20 Sep 2019
OtherFile: Triparty_Agreement_D_Bldg_71_90.pdf20 Sep 2019
Building plan approvalFile: Liviano Layout Plan - 1.pdf12 Oct 2018
Layout approvalFile: Liviano Layout Plan - 1.pdf12 Oct 2018
Layout approvalFile: Plan.pdf12 Oct 2018
Building plan approvalFile: Plan.pdf12 Oct 2018
Copy of the legal title reportFile: Title.pdf12 Oct 2018
Details of encumbrancesFile: DEBENTURE TRUST DEED - 27 FLAT - 9057-2016.pdf12 Oct 2018
Details of encumbrancesFile: Indenture of mortgage.pdf12 Oct 2018
Copy of Layout Approval (in case of layout)File: Liviano Layout Plan - 1.pdf12 Oct 2018
Copy of Layout Approval (in case of layout)File: Plan.pdf12 Oct 2018
Building Plan Approval (IOD)File: Liviano Layout Plan - 1.pdf12 Oct 2018
Building Plan Approval (IOD)File: Plan.pdf12 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf12 Oct 2018
Declaration in FORM BFile: B- FORM .pdf12 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf12 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate.pdf12 Oct 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf12 Oct 2018
Proforma of Allotment letterFile: RERA ALLOTMENT LETTER.pdf12 Oct 2018
OtherFile: Parking plan.pdf12 Oct 2018
OtherFile: A WING.pdf12 Oct 2018
OtherFile: B WING.pdf12 Oct 2018
OtherFile: D WING.pdf12 Oct 2018
OtherFile: C WING.pdf12 Oct 2018
OtherFile: Letter _001.pdf12 Oct 2018
OtherFile: Liviano Garden Flats Floor Plan - .pdf12 Oct 2018

Keep SHRINIWAS LIVIANO PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

Builder: GOEL GANGA LANDMARKS LLP

GOEL GANGA LANDMARKS LLP has 3 registrations on MahaRERA, including SHRINIWAS LIVIANO PHASE I and GANGA SERIO E F BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if SHRINIWAS LIVIANO PHASE I is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRINIWAS LIVIANO PHASE I?

The registered promoter entity is GOEL GANGA LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRINIWAS LIVIANO PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHRINIWAS LIVIANO PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHRINIWAS LIVIANO PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRINIWAS LIVIANO PHASE I?

The professionals named in the filing: Architect: Ar Laxman Thite. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRINIWAS LIVIANO PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRINIWAS LIVIANO PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRINIWAS LIVIANO PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.