Home / Browse projects / Thane, Maharashtra / SHRI SHIVANAND CHS

Completed No litigation declared Residential / Group Housing project

SHRI SHIVANAND CHS

By Trimity Constructions

RG-MH-21806 · RERA P51700024183 · Last updated on MahaRERA portal: 7 Feb 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 14 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
1Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

SHRI SHIVANAND CHS is a Residential / Group Housing project by Trimity Constructions in Thane, Maharashtra, registered with MahaRERA as P51700024183 on 24 Jan 2020. The registration is recorded completed; possession was promised by 19 Aug 2024. The completion date has moved by 14 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHRI SHIVANAND CHS
  • TypeResidential / Group Housing
  • Location
    • GAVAND PATH
    • BHASKAR COLONY
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024183
  • ReraGenie IDRG-MH-21806

Builder

  • NameTrimity Constructions
  • Entity typePartnership
  • PartnersDevadatta Vinayak Joshi, Swapnil Yuvraj Marathe
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2020First promiseJun 2023Revised toAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2020
  • Promised completion19 Aug 2024
  • Revised completionRevised to 19 Aug 2024 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SBI Employees Shri Shivanand CHS LtdNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

SBI Employees Shri Shivanand CHS Ltd: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities17

As on 7 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Stack ParkingYes100%
Fitness CenterrYes100%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area899 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Trimity ConstructionsThane (M Corp.)Thane
SBI Empoloyees Shri Shivanand CHS LtdThane (M Corp.)Thane

Approvals and building plan

Permissible FSI2373.55
Proposed, not sanctioned899 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOKHALE ROAD NAUPADA THANE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSakaar
EngineerRoshan Katkar
Chartered AccountantKapure and Kapure Chartered accountants
PartnerRole in project
Trimity Constructions-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700016808Jun 2023 → Jun 2024

Reason as filed by the promoterAs per the attachment

EXT51700025168Jun 2023 → Aug 2024

Reason as filed by the promoterAs per attachment

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000209393STATE BANK OF INDIA EMPLOYEES, SHRI SHIVANAND CHSTRIMITY CONSTRUCTIONS13/12/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Nov 2024

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Completion Certificate _ Shivanand Project.pdf7 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shivanand Form 5 March 24.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Shivanand 19082024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shivanand Engineer Certificate 19082024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory19082024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shivanand Jun 2024_compressed.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shivanand Engineer Certificate 30062024.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Shivanand Sold book inventory 30062024.pdf9 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Completion Certificate _ Shivanand Project.pdf5 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate _ Shivanand Project.pdf5 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shivanand Occupation Certificate.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Shivanand 2023.pdf20 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Shivanand 2024.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31122023.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Shivanand March 24.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Shivanand_March 2024.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 10042024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Shivanand List of Inventory.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Shivanand 31122023.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shivanand _ Form 5.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventories 30062023.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventories30092023.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form -3 Shri Shivanand Dec 22_compressed.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Shri Shivanand March 23_compressed.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shivanand June 23_compressed.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shivanand Sep 23_compressed.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shivanand Dec 23 Signed 22022024_comp.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shivanand Architect Certificate 10-01-2024.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate 31122022.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate 31032023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate 30062023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate 30092023.pdf20 Jan 2024
Layout approvalFile: Shivanand 1_4_compressed.pdf16 Dec 2023
Layout approvalFile: Shivanand 2_4_compressed.pdf16 Dec 2023
Layout approvalFile: Shivanand 3_4_compressed.pdf16 Dec 2023
Layout approvalFile: Shivanand 4_4_compressed.pdf16 Dec 2023
Copy of Layout Approval (in case of layout)File: Shivanand 1_4_compressed.pdf16 Dec 2023
Copy of Layout Approval (in case of layout)File: Shivanand 2_4_compressed.pdf16 Dec 2023
Copy of Layout Approval (in case of layout)File: Shivanand 3_4_compressed.pdf16 Dec 2023
Copy of Layout Approval (in case of layout)File: Shivanand 4_4_compressed.pdf16 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Shri Shivanand Society _ 8th Floor_Commencement Certificate.pdf16 Dec 2023
Declaration about Commencement CertificateFile: Shivanand Declaration _ 8th Floor.pdf16 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shivanand RERA Architect Certificate_ 05_10_23.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Shivanand Letter _ RERA .pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf15 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf15 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 02-01-2020.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 04-01-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 04-04-2020.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 04-07-2020.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 06-10-2020.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 4-1-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 6-4-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 6-7-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 4-1-2022.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 03-11-2022.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jun 2022.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 March 20 _compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 March 21_compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 March 22 compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 June 22 Singed Copy_compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Sep 22 Singed Copy_compressed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form -5 March 20.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form -5 March 21.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 March 22.pdf27 Mar 2023
Layout approvalFile: Plan 1.pdf9 Nov 2022
Layout approvalFile: Shivanand Project - 1st -3rd Floor.pdf9 Nov 2022
Layout approvalFile: Shivanand Project 4th -7th Floor.pdf9 Nov 2022
Layout approvalFile: Shivanand Project -Terrace layout.pdf9 Nov 2022
Copy of Layout Approval (in case of layout)File: Plan 1.pdf9 Nov 2022
Copy of Layout Approval (in case of layout)File: Shivanand Project - 1st -3rd Floor.pdf9 Nov 2022
Copy of Layout Approval (in case of layout)File: Shivanand Project 4th -7th Floor.pdf9 Nov 2022
Copy of Layout Approval (in case of layout)File: Shivanand Project -Terrace layout.pdf9 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Shivanand latest cc 25072022.pdf9 Nov 2022
Declaration about Commencement CertificateFile: Shivanand - Declaration about Commencement Certificate.pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate 4-4-20.pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate 4-7-20.pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate 6-10-20.pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate 4-1-21.pdf9 Nov 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ASAVARI CO OP HSG SOC LTDP51700045809NAUPADA, Thane14Jun 2022OngoingDec 2024Not delivered
HarmonyP51700022306Vishnu Nagar, Thane48Sep 2019OngoingMar 2023Not delivered
Trimity AshwaOpp Rosa classique Ghodbunder road kasarwadavali28-CompletedDec 2017Dec 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 14 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRI SHIVANAND CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHASKAR COLONY7,600+ in Thane

2 kmSHRI SHIVANAND CHSCompleted 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Trimity Constructions

Trimity Constructions has 4 registrations on MahaRERA, including Trimity Ashwa and Harmony. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHRI SHIVANAND CHS is delayed beyond 19 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRI SHIVANAND CHS?

The registered promoter entity is Trimity Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRI SHIVANAND CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHRI SHIVANAND CHS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHRI SHIVANAND CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRI SHIVANAND CHS?

The professionals named in the filing: Architect: Sakaar; Engineer: Roshan Katkar; Chartered Accountant: Kapure and Kapure Chartered accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI SHIVANAND CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI SHIVANAND CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI SHIVANAND CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.