ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ASAVARI CO OP HSG SOC LTD

Registered No litigation declared Residential / Group Housing project

ASAVARI CO OP HSG SOC LTD

By Trimity Constructions

RG-MH-83341 · RERA P51700045809 · Last updated on MahaRERA portal: 1 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 22 months from the original
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
10 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

ASAVARI CO OP HSG SOC LTD is a Residential / Group Housing project by Trimity Constructions in Thane, Maharashtra, registered with MahaRERA as P51700045809 on 15 Jun 2022. Possession is promised by 31 Oct 2026. The completion date has moved by 22 months from the original filing. 4 of the 14 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameASAVARI CO OP HSG SOC LTD
  • TypeResidential / Group Housing
  • Location
    • BHAGAWATI ROAD
    • NAUPADA
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045809
  • ReraGenie IDRG-MH-83341

Builder

  • NameTrimity Constructions
  • Entity typePartnership
  • PartnersDevadatta Vinayak Joshi, Swapnil Yuvraj Marathe
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2022First promiseDec 2024Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed92 files

Current status

29%4 of 14 units booked
82.5%Work done, per cost certificate

Figures as on 1 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ASAVARI CO OP HSG SOC LTDNA9014014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

ASAVARI CO OP HSG SOC LTD: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered1
Open Space14

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area506 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Aug 2025
LandownerVillageDistrict
ASAVARI CHS LTDThane (M Corp.)Thane
TRIMITY CONSTRUCTIONSThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI1254.0
Proposed, not sanctioned627 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD SHOP NO 6 PATHARE BUILDING GOKHALE ROAD NEAR GAONDEVI MANDIR NAUPADA THANE (W) THANE400604
Estimated costRs 2.23 cr
Cost incurredRs 1.84 cr
Work done82.54%
BuildingWingEstimatedIncurred
ASAVARI CO OP HSG SOC LTDNARs 1.91 crRs 1.84 cr
-NARs 31.16 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitesh Pawar
EngineerD K Patel
EngineerPawan Mahindrakar
Chartered AccountantKapureandKaprechartredAccountants
Chartered AccountantShripati Gandhi Choudhari & Co
PartnerRole in project
Trimity Constructions-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700025151Dec 2024 → Dec 2025

Reason as filed by the promoterAs per attachment

EA15122518691Dec 2024 → Jun 2026

Reason as filed by the promoterWe started construction work in the full swing. Quality of the construction is our primary preference and therefore we do not compromise with the quality of construction over speed of the construction. Therefore, as per the given circumstances, the construction work progressed.The main reason for the delay is slow pace of sales. Though the current number of sold units out of total units available for sale is better, the pace of sales was slow due to which cash flow of the project got effected which in turn resulted into delay in completion of the project.In addition to poor cash flows, cost ov

EA03082621997Dec 2024 → Oct 2026

Reason as filed by the promoterThe current facts of the case are being explained hereunder. It may be noted that the construction of the project has been completed, and the Part Occupancy Certificate has been obtained as of 03/07/2026. The Occupancy Certificate received is for all the flats expect the flat No 702. It may be noted that the possession letter has also been handed over to the allottees. Accordingly, we are seeking an extension of the project registration solely for the purpose of completing the pending work and related formalities for Flat No. 702. The extension is not sought for any other reason. It is further

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Asavari - from 5 - 2025-26.pdf1 Aug 2026
Withdrawal Update Form 1File: Asavari - Form 1 - April to June 26.pdf20 Jul 2026
Withdrawal Update Form 2File: Asavari - From 2 - April to June 26.pdf20 Jul 2026
Withdrawal Update Form 3File: Asavari - Form 3 - April to June 26.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Asavari - Form 2A - March 26.pdf28 May 2026
Withdrawal Update Form 1File: Asawari - Form 1 - Jan to March 26.pdf19 May 2026
Withdrawal Update Form 2File: Asavari - From 2 - Jan to March 26.pdf19 May 2026
Withdrawal Update Form 3File: Asavari - Form 3 - Jan to March 2026.pdf19 May 2026
Withdrawal Update Form 1File: Asavari Form 1 - Oct to Dec 25.pdf2 Feb 2026
Withdrawal Update Form 2File: Asavari Form 2 - Oct to Dec 25.pdf2 Feb 2026
Withdrawal Update Form 3File: Asawari - form 3 - Dec 2025_compressed.pdf2 Feb 2026
Form 2A (FY 2022-2023)File: Asavari Form 2A 01042023.pdf12 Nov 2025
Form 2A (FY 2023-2024)File: Asavari Form 2A 01042024.pdf12 Nov 2025
Form 2A (FY 2024-2025)File: Asavari -Form 2A 24-25.pdf12 Nov 2025
Form 5 (FY 2022-2023)File: Asavari _ Form 5.pdf12 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 Asavari March 24.pdf12 Nov 2025
Form 5 (FY 2024-2025)File: Asawari -Form 5 - 24-25.pdf12 Nov 2025
Withdrawal Update Form 1File: Asawari Form 1 - July to Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 2File: Asavari form 2 - July to Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 3File: Asawari Form 3 - July to Sept 2025.pdf4 Nov 2025
Withdrawal Update Form 1File: Asawari - Form 1April to June 25.pdf23 Aug 2025
Withdrawal Update Form 2File: Asavari Form 2 - April to June 25.pdf23 Aug 2025
Withdrawal Update Form 3File: Aasavari Form 3 - April to June 25.pdf23 Aug 2025
Withdrawal Update Form 1File: Asawari - Form 1April to June 25.pdf11 Aug 2025
Withdrawal Update Form 2File: Asavari Form 2 - April to June 25.pdf11 Aug 2025
Withdrawal Update Form 3File: Aasavari Form 3 - April to June 25.pdf11 Aug 2025
Form 2File: Asavari Form 2 - April to June 25.pdf7 Aug 2025
Form 1File: Asawari - Form 1April to June 25.pdf7 Aug 2025
Form 3File: Aasavari Form 3 - April to June 25.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Asavari April to June 25.pdf7 Aug 2025
Form 1File: Aasawari Architect Certificate Jan to March 2025.pdf12 Jun 2025
Form 2File: Asavari Engineer's Certificate Jan to March 25.pdf12 Jun 2025
Form 3File: Form 3 - Asavari Mar 2025_compressed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Asawari Disclosure09062025.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Asavari Mar 2025_compressed.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Discloure of sold inventory Asavari Jan to March 2025.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aasawari Architect Certificate Jan to March 2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari Engineer's Certificate Jan to March 25.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Asavari Architect Certificate 15-01-2025.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Asavari CHS_ 24012025.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari Engineer Certificate 31-12-2024.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Asavari Disclosure 31-12-2024.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Asavari March 24.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Asavari Form 3 30092024.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari Engineer Certificate 30092024pdf.pdf23 Nov 2024
Declaration in FORM BFile: Asavari Rera Extension Form B .pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold book Inventory Asavari 30092024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Asavari form 1 30092024.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari _ Form 2_ Engineer Certificate .pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASAVARI RERA ARCHITECT CERTIFICATE.pdf16 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Inventory Asavari.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 30-06-24.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Asavari Form 2A 01042023.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Asavari Form 2A 01042024.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari Engineer Certificate March 2024.pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 31032024.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Asavari01042024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Asavari List of Inventory.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari Engineers certificate 31122023.pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Asavari _ Form 5.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: Asavari 30062023.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Asavari30092023.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory Dec 2023.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Asavari Dec 22_compressed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Asavari March 23_compressed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Asavari June 23_compressed (1).pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Asavari Sep 23_compressed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Asavari March 23_compressed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Asavari Dec 23_compressed.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Asavari RER Architect Certificate January 2024.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari 31-12-2022.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari 31-03-2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari 30-09-2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Asavari 30-06-2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Asavari Architect certificate 09102023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certifiacte.pdf26 Sep 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf1 Jun 2022
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf1 Jun 2022
PAN CardFile: 1 PAN Card.pdf1 Jun 2022
Copy of the legal title reportFile: 1 Copy of the legal title report (1).pdf1 Jun 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHRI SHIVANAND CHSP51700024183BHASKAR COLONY, Thane-Jan 2020OngoingJun 2023Not delivered
HarmonyP51700022306Vishnu Nagar, Thane48Sep 2019OngoingMar 2023Not delivered
Trimity AshwaOpp Rosa classique Ghodbunder road kasarwadavali28-CompletedDec 2017Dec 2017

How this compares with Thane

29%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 22 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASAVARI CO OP HSG SOC LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAUPADA7,600+ in Thane

Builder: Trimity Constructions

Trimity Constructions has 4 registrations on MahaRERA, including Trimity Ashwa and Harmony. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ASAVARI CO OP HSG SOC LTD is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASAVARI CO OP HSG SOC LTD?

The registered promoter entity is Trimity Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASAVARI CO OP HSG SOC LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASAVARI CO OP HSG SOC LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASAVARI CO OP HSG SOC LTD?

The professionals named in the filing: Architect: Jitesh Pawar; Engineer: D K Patel; Engineer: Pawan Mahindrakar; Chartered Accountant: KapureandKaprechartredAccountants; Chartered Accountant: Shripati Gandhi Choudhari & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASAVARI CO OP HSG SOC LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASAVARI CO OP HSG SOC LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASAVARI CO OP HSG SOC LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.