Home / Browse projects / Nashik, Maharashtra / Shreeji Magnet

Completed No litigation declared Residential / Group Housing project

Shreeji Magnet

By SHREEJI LIFE SPACE

RG-MH-15171 · RERA P51600034437 · Last updated on MahaRERA portal: 24 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 90%
15 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

Shreeji Magnet is a Residential / Group Housing project by SHREEJI LIFE SPACE in Nashik, Maharashtra, registered with MahaRERA as P51600034437 on 5 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 19 of the 34 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameShreeji Magnet
  • TypeResidential / Group Housing
  • Location
    • Nashik Shiwar
    • Nashik
    • Nashik (M Corp.)
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600034437
  • ReraGenie IDRG-MH-15171

Builder

  • NameSHREEJI LIFE SPACE
  • Entity typePartnership
  • GSTIN27ACVFS4150Q1Z5
  • PartnersSWATI ANJAN BHALODIA, NIKITA HASMUKHBHAI BHALODIA, MADHUBEN HASMUKHBHAI BHALODIA, ANJAN HASMUJHBHAI BHALODIA, HASMUKHBHAI KARSHANBHAI BHALODIA
  • Other registrations9 more →
  • Completed6 of 10

Key dates

this monthRegisteredApr 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed122 files

Current status

56%19 of 34 units booked
45.4%Work done, per cost certificate

Figures as on 24 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
shreeji MagnetNA221934034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

shreeji Magnet: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered188

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,284 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
Archana Sachin PagarMumbai CityMumbai City
Shila Arvind KareNashik (M Corp.)Nashik
Chetan Arvind KareNashik (M Corp.)Nashik
Arvind Punjaji KareNashik (M Corp.)Nashik
Madhukar Namdeo Purkar (HUF)Nashik (M Corp.)Nashik
Deepali Sagar NirmalNashik (M Corp.)Nashik
Nirmala Madhukar PurkarNashik (M Corp.)Nashik
Ranjeet Madhukar PurkarNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI8515.52
Proposed, not sanctioned8,512 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Ltd Surkan Arcade Bhujbal Farm Road Plot No Me 1 Cidco Indira Nagar Nashik
Estimated costRs 24.00 cr
Cost incurredRs 10.89 cr
Work done45.38%
BuildingWingEstimatedIncurred
shreeji MagnetNARs 24.00 crRs 10.89 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Kumath
EngineerKISHOR CHOPDA
Chartered AccountantRushikesh Vijay Nandapure
Chartered AccountantCA Paresh Sabadra
Chartered AccountantRushikesh Nandapure
Chartered AccountantPiyush Verma
Chartered AccountantAnil Dahiya
PartnerRole in project
SHREEJI LIFE SPACE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Shreeji Magnet Completion.pdf24 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 31122025.pdf14 Jan 2026
Withdrawal Update Form 3File: Form3 31122025.pdf14 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A Shreeji Magent 31032023.pdf13 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A Shreeji Magent 31032024.pdf13 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Shreeji Magent 31032025.pdf13 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 Shreeji Magnet 22-23.pdf13 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Shreeji Magnet 23-24.pdf13 Jan 2026
Form 1File: 30062022-Form1.pdf12 Jan 2026
Form 2File: 30062022-Form2.pdf12 Jan 2026
Form 3File: 30062022-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30062022-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 30092022-Form1.pdf12 Jan 2026
Form 2File: 30092022-Form2.pdf12 Jan 2026
Form 3File: 30092022-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30092022-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 31122022-Form1.pdf12 Jan 2026
Form 2File: 31122022-Form2.pdf12 Jan 2026
Form 3File: 31122022-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31122022-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 31032023-Form1.pdf12 Jan 2026
Form 2File: 31032023-Form2.pdf12 Jan 2026
Form 3File: 31032023-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31032023-Disclosure of Sold Booked Invenotry.pdf12 Jan 2026
Form 1File: 30062023-Form1.pdf12 Jan 2026
Form 2File: 30062023-Form2.pdf12 Jan 2026
Form 3File: 30062023-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30062023-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 30092023-Form1.pdf12 Jan 2026
Form 2File: 30092023-Form2.pdf12 Jan 2026
Form 3File: 30092023-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30092023-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 31122023-Form1.pdf12 Jan 2026
Form 2File: 31122023-Form2.pdf12 Jan 2026
Form 3File: 31122023-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31122023-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 31032024-Form1.pdf12 Jan 2026
Form 2File: 31032024-Form2.pdf12 Jan 2026
Form 3File: 31032024-From3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31032024-Disclosuer of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 30062024-Form1.pdf12 Jan 2026
Form 2File: 30062024-Form2.pdf12 Jan 2026
Form 3File: -Form3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30062024-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 30092024-Form1.pdf12 Jan 2026
Form 2File: 30092024-Form2.pdf12 Jan 2026
Form 3File: -Form3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 30092024-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 31122024-Form1.pdf12 Jan 2026
Form 2File: 31122024-Form2.pdf12 Jan 2026
Form 3File: 31122024-Form3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31122024-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Form 1File: 31032025-Form1.pdf12 Jan 2026
Form 2File: 31032025-Form2.pdf12 Jan 2026
Form 3File: 31032025-Form3.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: 31032025-Disclosure of Sold Booked Inventory.pdf12 Jan 2026
Withdrawal Update Form 1File: Shreeji Magnet Form 1 Q2.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2 Shreeji Magnet Q2.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3 Shreeji Magnet.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Shreeji Magnet 24-25.pdf20 Nov 2025
Withdrawal Update Form 1File: Shreeji Magnet Form 1.pdf16 Jul 2025
Withdrawal Update Form 2File: Form 2 ShreejiMagnet0001.pdf16 Jul 2025
Withdrawal Update Form 3File: Form 3 Shreeji Magnet Q1_0001.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Shreeji Magnet.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shreeji Magnet 31122024.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shreeji Magnet 31122024.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3Magnet31072024.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3Magnet17092024.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2ShreejiMagnet31072024.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2ShreejiMagnet17092024.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shreeji Magnet Form 5.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Magnet Q1_2324.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Magnet Q2_2324.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Magnet Q3_2324.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Magnet Q1_2324.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Magnet Q2_2324.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Magnet Q3_2324.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Magnet Q4_2324.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Magnet Q3.pdf14 Jan 2025

How this compares with Nashik

56%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shreeji Magnet on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmShreeji MagnetCompleted 95Lapsed / revoked 17Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: SHREEJI LIFE SPACE

SHREEJI LIFE SPACE has 10 registrations on MahaRERA, including SHREEJI UNIPARC and SHREEJI JAY SHANKAR TOWERS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Shreeji Magnet is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shreeji Magnet?

The registered promoter entity is SHREEJI LIFE SPACE, a partnership as per the filing. Its GSTIN 27ACVFS4150Q1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shreeji Magnet?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shreeji Magnet?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shreeji Magnet?

The professionals named in the filing: Architect: Sumit Kumath; Engineer: KISHOR CHOPDA; Chartered Accountant: Rushikesh Vijay Nandapure; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: Rushikesh Nandapure; Chartered Accountant: Piyush Verma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shreeji Magnet?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shreeji Magnet. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shreeji Magnet to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.