Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SHREEJA RESIDENCY is a Residential / Group Housing project by VASTU SHREEJA BUILDCON LLP in Latur, Maharashtra, registered with MahaRERA as P52400052767 on 22 Sep 2023. Possession is promised by 30 Jun 2028.

At a glance

Project

  • NameSHREEJA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • RASURE NAGAR
    • LMC area KANHERI OUT OF SY NO 9 PLOT NO.1
    • Latur (M Cl)
    • Latur
    • 413512
  • Pincode413512
  • RERA no.P52400052767
  • ReraGenie IDRG-MH-30026

Builder

  • NameVASTU SHREEJA BUILDCON LLP
  • Entity typePartnership
  • PartnersRAM SUDHAKAR FULARI, ASHISH VILAS BIRAJDAR

Key dates

this monthRegisteredSep 2023PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREEJA RESIDENCY TOWER CNA90000
SHREEJA RESIDENCY TOWER BNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

SHREEJA RESIDENCY TOWER C70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHREEJA RESIDENCY TOWER B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes50%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes50%

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered124
BuildingClosed/CoveredTotal
SHREEJA RESIDENCY TOWER C6262
SHREEJA RESIDENCY TOWER B6262

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,109 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024
LandownerVillageDistrict
VASTU SHREEJA BUILDCON LLPLatur (M Cl)Latur
SHIVAJI VISHWANATH RASURELatur (M Cl)Latur

Approvals and building plan

Sanctioning authorityLatur Municipal Corporation
Permissible FSI4112.43
Proposed, not sanctioned4,112 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchground floor hotel vyanketesha ausa latur road latur

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerShafeek S Shaikh
Chartered AccountantChaudhary Malpani Bhandari & Co
PartnerRole in project
VASTU SHREEJA BUILDCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf5 Feb 2026
Form 2File: Form 2.pdf5 Feb 2026
Form 3File: Form 3.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q3 25-26.pdf5 Feb 2026
Form 1File: Form 1.pdf26 Oct 2025
Form 2File: Form 2.pdf26 Oct 2025
Form 3File: Form 3.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf26 Oct 2025
Form 1File: Form 1 july 2025.pdf25 Jul 2025
Form 2File: Form 2 July 2025.pdf25 Jul 2025
Form 3File: Form 3 Vastu Shreeja.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventroy.pdf25 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 2025 Architect.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Jan 2025.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 2025 Engineer.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Q3 Oct 2024.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Q3 Oct 2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Q3 Oct 2024.pdf18 Oct 2024
Form 1File: Form 1 Vastu Shreeja.pdf5 Oct 2024
Form 3File: Form 3 Vastu Shreeja 9-7-24.pdf5 Oct 2024
Form 2File: Form 2 Vastu Shreeja.pdf5 Oct 2024
Disclosure of Sold and Booked InventoryFile: Disclosure of sold- booked inventory 10-7-24.pdf5 Oct 2024
Self-declaration of Quarterly ProgressFile: Progres Report Vastu Shreeja.pdf5 Oct 2024
Disclosure of Sold and Booked InventoryFile: Disclosure of sold- booked inventory 10-7-24.pdf5 Oct 2024
Form 1File: Form 1.pdf5 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf21 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure .pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf21 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 2024.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 2024.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 2024.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sold Unsold Inventory Declaration Jan 2024.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vatu Shreeja.pdf8 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VASTU SHREEJA.pdf8 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vastushreeja form CA3.pdf25 Aug 2023
CERSAI detailsFile: CERSAI Search shreeja residency.pdf27 Jul 2023
CERSAI detailsFile: CERSAI Search Report shreeja.pdf27 Jul 2023
Layout approvalFile: layout plan vastushreeja.pdf18 Jul 2023
Copy of Layout Approval (in case of layout)File: layout plan vastushreeja.pdf18 Jul 2023
Building plan approvalFile: plan Vastushrija.pdf6 Jul 2023
PAN CardFile: PAN VASTU SHREEJA.pdf6 Jul 2023
Copy of the legal title reportFile: search Vastu shreeja.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbranmce Legal.pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbranmce Legal.pdf6 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: plan Vastushrija.pdf6 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: cc permission.pdf6 Jul 2023
Declaration about Commencement CertificateFile: Format D CC.pdf6 Jul 2023
Declaration in FORM BFile: form B vastu shreeja.pdf6 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Other RERA.pdf6 Jul 2023
Proforma of Agreement for saleFile: Proforma of AGREEMNET TO SALE.pdf6 Jul 2023
Proforma of Allotment letterFile: allotment letter.pdf6 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank details.pdf6 Jul 2023
Deviation Report with respect to Allotment letterFile: deviation Allotment letter.pdf6 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEviation Agreement to sale.pdf6 Jul 2023

How this compares with Latur

10%of Latur projects moved their completion datethis one has not
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep SHREEJA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LMC area KANHERI OUT OF SY NO 9 PLOT NO.1150+ in Latur

Builder: VASTU SHREEJA BUILDCON LLP

VASTU SHREEJA BUILDCON LLP has 1 registration on MahaRERA, including SHREEJA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if SHREEJA RESIDENCY is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJA RESIDENCY?

The registered promoter entity is VASTU SHREEJA BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJA RESIDENCY?

The professionals named in the filing: Engineer: Shafeek S Shaikh; Chartered Accountant: Chaudhary Malpani Bhandari & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.