SHREEBRAMHAND
RG-MH-13963 · RERA P51600030062 · Last updated on MahaRERA portal: 2 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
- Rs 9.50 crore secured on the land, in favour of UNION BANK OF INDIA
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 6 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEBRAMHAND is a Others project by SHREESWAMI CONSTRUCTIONS in Nashik, Maharashtra, registered with MahaRERA as P51600030062 on 29 Jul 2021. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 96 of the 118 units on this registration are recorded sold or booked, and 20 of 20 construction stages are filed complete.
At a glance
Project
- NameSHREEBRAMHAND
- TypeOthers
- Location
- TAPOVAN ROAD NR METRO MALL
- RTO COLONY BODHALE NAGAR NASHIK
- Nashik
- 422011
- Pincode422011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600030062
- ReraGenie IDRG-MH-13963
Builder
- NameSHREESWAMI CONSTRUCTIONS
- Entity typeOthers
- GSTIN27ABGPK0598J1ZB
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Named personSHREESWAMI CONSTRUCTIONS
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jul 2021
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed121 files
Current status
Figures as on 2 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREEBRAMHAND | Wing A | 15 | 14 | 56 | 6 | 62 |
| SHREEBRAMHAND | Wing B | 15 | 14 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 20 construction stages are filed complete across 2 buildings.
SHREEBRAMHAND · wing Wing A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SHREEBRAMHAND · wing Wing B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed119
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| OLIVE BUILDTECH | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREEBRAMHAND | Wing A | Rs 10.61 cr | Rs 10.61 cr |
| SHREEBRAMHAND | Wing B | Rs 10.61 cr | Rs 10.61 cr |
| - | NA | Rs 54.50 lakh | Rs 54.50 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH BAGUL |
| Engineer | SAGAR S SHAH |
| Engineer | SHAILESH DHUMNE |
| Chartered Accountant | Nandkumar Yashwantrao Deshmukh |
| Chartered Accountant | PRASHANT SHARAD PATHAK |
| Partner | Role in project |
|---|---|
| SHREESWAMI CONSTRUCTIONS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected sir, our construction work is not yet completed, hence we request you to kindly extend the proposed date of project completion till 31/03/2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 BRAMHAND.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: FORM 2 SHREEBRAMHABND.PDF | 2 May 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTI SHREEBRAMHAND.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: FORM-1 BRAMHAND.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 SHREEBRAMHABND.PDF | 7 Feb 2026 |
| Withdrawal Update Form 3File: C A RERA CERTIFICATE SHREE BRAMHAND.PDF | 7 Feb 2026 |
| Form 1File: ARCHITECH FORM - 1 BRAMHAND.PDF | 30 Dec 2025 |
| Form 2File: ENGINEER FORM 2 BRAMHAND.PDF | 30 Dec 2025 |
| Form 3File: CA CERTIFICATE FORM 3 SHREEBRAMHAND .PDF | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SHREEBRAMHAND (1).PDF | 30 Dec 2025 |
| Form 1File: Form 1 ShreeBramhand.PDF | 26 Nov 2025 |
| Form 2File: Form 2 ShreeBramhand.PDF | 26 Nov 2025 |
| Form 3File: Form 3 CA Certificate BRAMHAND.PDF | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SHREEBRAMHAND (1).PDF | 26 Nov 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 SHREEBRAMHAND.PDF | 30 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q4 Shree Bramhand.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - ShreeBramhand Q4.PDF | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate-ShreeBramhand.PDF | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unit Q4.pdf | 16 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Enginners Certificate.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - SHREE BRAMHAND.pdf | 1 Apr 2025 |
| Declaration in FORM BFile: Form B - Shree Bramhand.pdf | 20 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 BRAMHAND ARCHITECT CERTIFICATE.PDF | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 BRAMHAND ENGI CERTIFICATE.PDF | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q3 SHREE BRAMHAND.PDF | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD AND BOOKED BRAMHAND.PDF | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - BRAMHAND.PDF | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREEBRAMHAND FORM 1.PDF | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREEBRAMHAND FORM 3.PDF | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHREEBRAMHAND FORM 2.PDF | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shree Bramhand.PDF | 7 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SHREEBRAMHAND.PDF | 26 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SHREEBRAMHAND.PDF | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Bramhand.PDF | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3 Q1.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHREEBRAMHAND.PDF | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHREEBRAMHAND.PDF | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SHREEBRAMHAND 2A.PDF | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Shree Bramhand.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREEBRAMHAND Form 1.PDF | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHREEBRAMHAND FORM 2.PDF | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SHREEBRAMHAND FORM 2A.PDF | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SHREEBRAMHAND BOOK INVENTORY.PDF | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Bramhand.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bramhand Form 2.pdf | 27 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bramhand Form 3 - Reduce.pdf | 27 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOK INVENTORY.PDF | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.PDF | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.PDF | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOK INVENTORY.PDF | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 27 Sep 2023 |
| CERSAI detailsFile: Cersai.pdf | 26 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ShreeBramhand.PDF | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ShreeBramhand.PDF | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: SHREEBRAMHAND.PDF | 21 Jul 2023 |
| Building plan approvalFile: 01 compress.pdf | 5 Jun 2023 |
| Building plan approvalFile: 02_compressed.pdf | 5 Jun 2023 |
| Building plan approvalFile: 03 compress.pdf | 5 Jun 2023 |
| Building plan approvalFile: 04_compressed.pdf | 5 Jun 2023 |
| Building plan approvalFile: 05.pdf | 5 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 01 compress.pdf | 5 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf | 5 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 03 compress.pdf | 5 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf | 5 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 05.pdf | 5 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-REVISED.pdf | 5 Jun 2023 |
| Declaration about Commencement CertificateFile: Format D-Commencement.PDF | 5 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM-1.pdf | 5 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate.PDF | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 5 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Seperate bank Account.PDF | 5 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 bramhand.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold Bramhand.PDF | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold Bramhand.PDF | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold Bramhand.PDF | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold ShreeBramhand.PDF | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shree Bramhand-CA Certificate.pdf | 28 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: bhramhand.pdf | 18 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.PDF | 18 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY.PDF | 18 Jan 2023 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SHREEMALHAR APARTMENTP51600048639 | GANGAPUR ROAD, Nashik | 12 | Jan 2023 | Certificate Signed | Dec 2025Registered original: Dec 2024 | Aug 2025 |
| SHREENEELKANTH APARTMENTP51600045701 | RAJIV NAGAR, Nashik | - | Jun 2022 | Certificate Signed | Mar 2025 | Nov 2024 |
| SHREESAMRUDDHI PARKP51600025875 | Karmyogi Nagar, Nashik, Nashik | - | Jul 2020 | Certificate Signed | Dec 2023 | Sep 2022 |
| SHREENAVSHAKTI APARTMENTP51600022623 | BHABHA NAGAR MUMBAI NAKA, Nashik | - | Oct 2019 | Certificate Signed | Sep 2022 | Oct 2021 |
| SHREENIWAS APARTMENTP51600022902 | WADALA SHIWAR, Nashik | - | Nov 2019 | Certificate Signed | Jun 2022 | Jan 2022 |
| SHREEVISHWA | RTO COLONY NR METRO MALL BODHALE NAGAR NASHIK | 88 | - | Completed | Dec 2020 | Jul 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREEBRAMHAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RTO COLONY BODHALE NAGAR NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 145 registered projects within 2 km.
Anandvan Housing Complex
Ravi Mahajan Buildcon LLP
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: SHREESWAMI CONSTRUCTIONS
SHREESWAMI CONSTRUCTIONS has 3 registrations on MahaRERA, including SHREEBRAMHAND and SHREEMALHAR APARTMENT. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that SHREEBRAMHAND shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREEBRAMHAND is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEBRAMHAND?
The registered promoter entity is SHREESWAMI CONSTRUCTIONS, an others as per the filing. Its GSTIN 27ABGPK0598J1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEBRAMHAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEBRAMHAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEBRAMHAND?
The professionals named in the filing: Architect: UMESH BAGUL; Engineer: SAGAR S SHAH; Engineer: SHAILESH DHUMNE; Chartered Accountant: Nandkumar Yashwantrao Deshmukh; Chartered Accountant: PRASHANT SHARAD PATHAK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEBRAMHAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback