Home / Browse projects / Mumbai Suburban, Maharashtra / Shree Satyam
Shree Satyam
RG-MH-28848 · RERA P51800029730 · Last updated on MahaRERA portal: 17 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Satyam is a Others project by JE AND VEE INFRASTRUCTURE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029730 on 26 Jun 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 36 of the 137 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameShree Satyam
- TypeOthers
- Location
- SHRI SATYAM SOCIETY
- CHAWL NO. 93 TO 97
- DINDOSHI NAGAR
- MALAD - EAST
- MUMBAI - 400097
- CLOSED TO SHIVDHAM COMPLEX
- DINDOSHI
- Dindoshi
- Borivali
- Mumbai...
- Pincode400097
- RERA no.P51800029730
- ReraGenie IDRG-MH-28848
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Jun 2021
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed59 files
Current status
Figures as on 17 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE SATYAM PHASE I | NA | 22 | 22 | 126 | 11 | 137 |
| SHREE SATYAM PHASE II | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
SHREE SATYAM PHASE I27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SHREE SATYAM PHASE II0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHRI SATYAM SOCIETY CHS LTD | Borivali | Mumbai Suburban |
| SHREE SATYAM CHS LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THREE DIMENTIONAL CONSULTANTS LLP JIGAR NAGDA |
| Engineer | Shriniwas Mahamuni RESHMA BHAUD |
| Chartered Accountant | Saumil Kapadia & Co |
| Chartered Accountant | Mitest N Soloanki Solanki |
| Partner | Role in project |
|---|---|
| JE AND VEE INFRASTRUCTURE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdelay
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12604984 | Divyang Patel | JE AND VEE INFRASTRUCTURE | 06/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Nov 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Shree Satyam.pdf | 17 Nov 2025 |
| Form 2File: Form 2 Shree Satyam.pdf | 17 Nov 2025 |
| Form 3File: form 3 shree satyam 2.pdf | 17 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf | 17 Nov 2025 |
| Form 1File: Form 1 Shree Satyam.pdf | 14 Nov 2025 |
| Form 2File: Form 2 Shree Satyam.pdf | 14 Nov 2025 |
| Form 3File: Form 3 Shree Satyam.pdf | 14 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf | 14 Nov 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (21-22) for Satyam.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (22-23) for Satyam.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Letter for Satyam 24 01 2025_compressed.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Shree Satyam for RERA (1).pdf | 3 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Shree Satyam for 2021 22 RERA.pdf | 3 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Shree Satyam for 2022 23 RERA.pdf | 3 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Shree Satyam for 2023 24 RERA.pdf | 3 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report on Statement of Account.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Satyam_compressed.pdf | 17 Dec 2024 |
| Details of encumbrancesFile: Encumbrance on project satyam.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Shree Satyam Sold Inventory.pdf | 9 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Satyam.pdf | 17 Oct 2023 |
| Building plan approvalFile: IOA_21st Sept 23_compressed.pdf | 11 Oct 2023 |
| Building plan approvalFile: IOA Plan Satyam Parishram 7th Floor.pdf | 11 Oct 2023 |
| Building plan approvalFile: IOA Plan Satyam Parishram 7th Floor 1.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA_21st Sept 23_compressed.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Satyam Parishram 7th Floor.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Satyam Parishram 7th Floor 1.pdf | 11 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Shri satyam Plinth CC.pdf | 13 Jun 2023 |
| Building plan approvalFile: Satyam IOA Copy.pdf | 21 May 2023 |
| Building plan approvalFile: Satyam IOD Plan.pdf | 21 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Satyam IOA Copy.pdf | 21 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Satyam IOD Plan.pdf | 21 May 2023 |
| Building plan approvalFile: CFO Remark.pdf | 30 Aug 2022 |
| Building plan approvalFile: CFO PLAN.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: CFO Remark.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: CFO PLAN.pdf | 30 Aug 2022 |
| Proforma of Allotment letterFile: Agreement Draft.pdf | 30 Aug 2022 |
| Copy of the legal title reportFile: SUPPLEMENTAL TITLE CERTIFICATE.pdf | 7 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 7 May 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 2 Aug 2021 |
| Declaration about Commencement CertificateFile: SATYAM RERA LETTER.pdf | 17 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Satyam Pilling Permission from MHADA.pdf | 16 Jun 2021 |
| Declaration in FORM BFile: Satyam Form B.pdf | 12 Nov 2020 |
| Building plan approvalFile: Satyam IOA copy.pdf | 11 Nov 2020 |
| Building plan approvalFile: Satyam IOA copy1.pdf | 11 Nov 2020 |
| Building plan approvalFile: Satyam IOA copy 2.pdf | 11 Nov 2020 |
| Layout approvalFile: Satyam Layout Plan.pdf | 11 Nov 2020 |
| Copy of the legal title reportFile: Shri Satyam Title Certificate.pdf | 11 Nov 2020 |
| Copy of the legal title reportFile: Shri Satyam Title Certificate1.pdf | 11 Nov 2020 |
| Copy of the legal title reportFile: Shri Satyam Title Certificate 2.pdf | 11 Nov 2020 |
| Copy of the legal title reportFile: Shri Satyam Title Certificate 3.pdf | 11 Nov 2020 |
| Details of encumbrancesFile: No Encumberance Certificate - RERA - Satyam.pdf | 11 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: Satyam Layout Plan.pdf | 11 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Satyam IOA copy.pdf | 11 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Satyam IOA copy1.pdf | 11 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Satyam IOA copy 2.pdf | 11 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Shri Satyam NOC for CC.pdf | 11 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for Satyam - RERA.pdf | 11 Nov 2020 |
| Proforma of Allotment letterFile: Satyam Allotment Letter RERA.pdf | 11 Nov 2020 |
| PAN CardFile: JE AND VEE INFRASTRUCTURE - Paartnership PAN Card.pdf | 9 Nov 2020 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| VrindavanP51800017298 | OPP OBEROI MALL, Mumbai Suburban | - | Jul 2018 | Completed | Dec 2024 | Jun 2024 |
| PRAYAG HEIGHTS | PRAYAG HEIGHTS BUILDING NO 13 SHIVDHAM COMPLEX DINDOSHI MALAD EAST MUMABI 400097 | 157 | - | Completed | Dec 2020 | Late, Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Satyam on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CLOSED TO SHIVDHAM COMPLEX, DINDOSHI6,700+ in Mumbai Suburban
Alta Monte and Signet
ERA REALTORS PRIVATE LIMITED
MAULI OMKAR
MAULI SAI DEVELOPERS PVT LTD
HIVE 97
AMITY CONSTRUCTIONS
MAULI PRIDE
MAULI SAI DEVELOPERS PVT LTD
Aarambh Phase III by group Satellite
Satellite Developers Private Limited
Sethia Imperial Avenue
Sai Enterprises
See every Mumbai Suburban project, with the district possession charts
Builder: JE AND VEE INFRASTRUCTURE
JE AND VEE INFRASTRUCTURE has 9 registrations on MahaRERA, including Vrindavan and MADHUBAN. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Shree Satyam is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Satyam?
The registered promoter entity is JE AND VEE INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Satyam?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Shree Satyam?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Shree Satyam?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Satyam?
The professionals named in the filing: Architect: THREE DIMENTIONAL CONSULTANTS LLP JIGAR NAGDA; Engineer: Shriniwas Mahamuni RESHMA BHAUD; Chartered Accountant: Saumil Kapadia & Co; Chartered Accountant: Mitest N Soloanki Solanki. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Satyam?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback