Home / Browse projects / Mumbai Suburban, Maharashtra / SHREE SARASWATI CHS LTD PLOT 8B

Registered No litigation declared Residential / Group Housing project

SHREE SARASWATI CHS LTD PLOT 8B

By NAV DURGA CONSTRUCTION COMPANY

RG-MH-72294 · RERA P51800017436 · Last updated on MahaRERA portal: 21 Sep 2026

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • Completion date moved by 35 months
  • 6 extensions taken
  • Rs 11.00 crore secured on the land, in favour of ANAND RATHI GLOBAL FINANCE LTD

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 35 months from the original
9 of 11Construction stages donefurthest along: Installation of Lifts, 90%
6 of 79Units unsoldnot recorded sold or booked
10Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

SHREE SARASWATI CHS LTD PLOT 8B is a Residential / Group Housing project by NAV DURGA CONSTRUCTION COMPANY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017436 on 13 Aug 2018. Possession is promised by 30 Nov 2026. The completion date has moved by 35 months from the original filing. 73 of the 79 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 10 complaints are on record with the regulator.

At a glance

Project

  • NameSHREE SARASWATI CHS LTD PLOT 8B
  • TypeResidential / Group Housing
  • Location
    • N.G.ACHARYA MARG
    • CHEMBUR
    • MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800017436
  • ReraGenie IDRG-MH-72294

Builder

  • NameNAV DURGA CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnersVARUN VINOD ASRANI, SANJAY VINOD ASRANI, GURUMUKH CHANCHALDAS ASRANI
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2018First promiseDec 2023Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2018
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed126 files

Current status

92%73 of 79 units booked
82.9%Work done, per cost certificate

Figures as on 21 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SARASWATI CHS LTD BLDG B6 AND A1NA161479079

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

SHREE SARASWATI CHS LTD BLDG B6 AND A1: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes5%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered34
Open Space41

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area11,541 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofANAND RATHI GLOBAL FINANCE LTD
Secured amountRs 11.00 crore
Declared on30 Aug 2025

Approvals and building plan

Permissible FSI5798.64
Proposed, not sanctioned5,799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHEMBUR COLONEYMUMBAI 400074
Estimated costRs 54.00 cr
Cost incurredRs 44.75 cr
Work done82.87%
BuildingWingEstimatedIncurred
SHREE SARASWATI CHS LTD BLDG B6 AND A1NARs 40.00 crRs 38.75 cr
-NARs 14.00 crRs 6.00 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB H WADHWA & CO
ArchitectB.H.WADHWA & CO.
EngineerB H WADHWA
EngineerVIJAY NARANG
Chartered AccountantBANWAT & CO
Chartered AccountantBANWAT & CO.
Chartered AccountantP.C.DHOLAKIA & CO
PartnerRole in project
NAV DURGA CONSTRUCTION COMPANY-

Extensions applied for6

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018300Dec 2023 → Aug 2024

Reason as filed by the promoterTHE LOCKDOWNS LED TO CONSTRUCTIN ACTIVITIES COMING TO A STANDSTILL DUE TO NON AVAILABILITY OF LABOUR AND IMPACT ON THE MOVEMENT OF BUILDING MATERIAL. COVID-19 OUT BREAK DELAYED PROJECT COMPLETION TIMELINES, SALES ARE BADLY AFFECTED, EVEN WE ARE UNABLE TO RECOVER FUNDS EXISTING BUYERS AS FINANCIAL CRISIS ARE FACED BY ALMOST EVERYONE DUE TO FUND ISSUE, NOW DEVELOPER HAVE TAKEN CONSTRUCTION FINANCE, CONSTRUCTION WORK IS IN PROGRESS.

EXT51800024698Dec 2023 → Mar 2025

Reason as filed by the promoterDUE TO FINANCIAL CONSTRAINTS FACED CONSTRUCTION WORK IS STILL NOT COMPLETED THEREFORE REQUEST TO GIVE EXTENSION UTPTO 31ST MARCH 2025.

EXT51800028325Dec 2023 → Dec 2025

Reason as filed by the promoterDUE TO UNRESOLVED FINANCIAL ISSUES THAT HAVE IMPACTED PROGRESS OF THE PROJECT.DESPITE OF OUR BEST EFFORTS THE REQUIRED FIANANCIAL RESORCES ARE NO YET FULL SECURED.WE THEREFORE REQUEST EXTENSION UPTO 31ST DECEMBER 2025

EA23012619561Dec 2023 → Mar 2026

Reason as filed by the promoterDue to financial constraints faced by us, the progress of the project was temporarily affected. We wish to inform you that all financial issues have now been resolved, and construction work has recommenced in full swing with adequate resources deployed at site. We assure you that the interests of the allottees / customers are fully secured, and the project shall be completed within the extended period.

P51800017436/WarDec 2023 → Jul 2026

Reason as filed by the promoterNA

EA21092638949Dec 2023 → Nov 2026

Reason as filed by the promoterThe flats are ready for soft possession, and construction is at an advanced stage. The extension is required primarily to facilitate pending bank disbursements, new registrations, completion of necessary documentation and other formalities needed to obtain the Occupation Certificate. Therefore requesting for extension upto November 2026

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC12501609Dinesh MahadevanNAV DURGA CONSTRUCTION COMPANY16/05/2025
CC12501615Shivaday Dayashankar ShettyNAV DURGA CONSTRUCTION COMPANY16/05/2025
CC12501614Hasit VaishnavNAV DURGA CONSTRUCTION COMPANY16/05/2025
CC12501797Praveen GopinathanNAV DURGA CONSTRUCTION COMPANY31/05/2025
CC12501796Praveen GopinathanNAV DURGA CONSTRUCTION COMPANY31/05/2025
CC12501798Lakhminderjeet SinghNAV DURGA CONSTRUCTION COMPANY31/05/2025
CC12501812Pankaj ShindeNAV DURGA CONSTRUCTION COMPANY02/06/2025
CC12501811Vikas NirmalNAV DURGA CONSTRUCTION COMPANY02/06/2025
CC12501826Kartik KumarNAV DURGA CONSTRUCTION COMPANY03/06/2025
CC12502006Kodanda rama ShettyNAV DURGA CONSTRUCTION COMPANY19/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SRS Form 2A SRS 25 26.pdf21 Sep 2026
Form 5 (FY 2025-2026)File: SRS Form 5 SRS 25 26.pdf21 Sep 2026
Withdrawal Update Form 1File: FORM 1 SRS MAR 2026.pdf19 Sep 2026
Withdrawal Update Form 1File: FORM 1 SRS JUNE 2026.pdf19 Sep 2026
Withdrawal Update Form 2File: SRS Form 2MAR 2026.pdf19 Sep 2026
Withdrawal Update Form 2File: SRS Form 2 JUNE 2026.pdf19 Sep 2026
Withdrawal Update Form 3File: SRS FORM 3 MAR 2026.pdf19 Sep 2026
Withdrawal Update Form 3File: SRS FROM 3 JUNE 2026.pdf19 Sep 2026
Building plan approvalFile: Approved_Drawing_Saraswati_CHS .pdf17 Feb 2026
Building plan approvalFile: SRS 8B- Approved Letter.pdf17 Feb 2026
Commencement certificateFile: SRS 8B CC.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1 SRS APR TO JUNE 2025.pdf17 Jan 2026
Withdrawal Update Form 1File: FROM 1 SRS JULY TO SEPT 2025.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1 SRS OCT TO DEC 2025.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 SRS APR TO JUNE 2025.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 SRS JULY TO SEPT 2025.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 SRS OCT TO DEC 2025.pdf17 Jan 2026
Withdrawal Update Form 3File: SRS FORM 3 APR TO JUNE 2025.pdf17 Jan 2026
Withdrawal Update Form 3File: SRS FORM 3 JULY TO SEPT 2025.pdf17 Jan 2026
Withdrawal Update Form 3File: SRS FORM 3 OCT TO DEC 2025.pdf17 Jan 2026
Certificates of CA (Form 3)File: FORM 3.pdf2 May 2025
Declaration in FORM BFile: FORM B.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 2025.pdf30 Apr 2025
Certificates of CA (Form 3)File: FORM 3 SRS.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY SRS DEC 2024.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY SRSMAR 2025.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf30 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SRS Form 1 DEC 2024.pdf1 Feb 2025
Certificates of CA (Form 3)File: FORM 3 SRS DEC 2024.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SRS Form 2 DEC 2024.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SRS SEPT 2024.pdf9 Jan 2025
Certificates of CA (Form 3)File: FORM 3 SRS SEPT 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SRS FORM 2 SEPT 2024.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SRS Form 2 A WITH SIGN.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SRS Form 2 A WITH SIGN.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SRS Form 5 WITH SIGN.pdf17 Oct 2024
Building plan approvalFile: Approved Letter.pdf16 Oct 2024
Building plan approvalFile: Approved_Drawing SRS.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: SRS 8B CC.pdf16 Oct 2024
Building Plan Approval (IOD)File: Approved Letter.pdf16 Oct 2024
Building Plan Approval (IOD)File: Approved_Drawing SRS.pdf16 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D DECLARATION CC SRS.pdf16 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: SRS FORMAT A DESIGNATED BANK AC.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SRS PLOT B DISCLOSURE OF INTEREST.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SRS FORM 2A 23-24.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 SRS 23-24.pdf16 Oct 2024
Declaration in FORM BFile: FORM B ( SRS).pdf9 Oct 2024
Details of encumbrancesFile: SRS ENCUMBRANCE.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 2024.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2024.pdf8 Oct 2024
Certificates of CA (Form 3)File: FORM 3 MARCH 2024.pdf8 Oct 2024
Certificates of CA (Form 3)File: FORM 3 JUNE 2024 SRS.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2024.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2024.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: SARASWATI INVENTORY 31ST MARCH 2024.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY JUNE 2024.pdf8 Oct 2024
CERSAI detailsFile: CERSAI SRS.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SRS 31ST DEC 2023.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SRS DEC 2023.pdf28 Mar 2024
Certificates of CA (Form 3)File: form 3 srs 31st dec 2023.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAR 2023.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE'23.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 2023.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2023.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE'23.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 2023.pdf21 Dec 2023
Certificates of CA (Form 3)File: FORM 3 MARCH 2023.pdf21 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: SRS CC.pdf20 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: REVALID CC SRS.pdf20 Dec 2023
Declaration in FORM BFile: NDC FORM B.pdf20 Dec 2023
Declaration in FORM BFile: NDC FORM B.pdf19 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE TM 2021-22.pdf19 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE TM 2022-23.pdf19 Dec 2023
Disclosure of sold/ booked inventoryFile: SRS DISCLOSURE OF IN VENTORY SEPT 2023.pdf19 Dec 2023
Certificates of CA (Form 3)File: FORM 3 AS ON 30-06-23.pdf26 Oct 2023
Certificates of CA (Form 3)File: FORM 3 AS ON 30-09-23.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 1-4-2021TO 31-3-2022.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 1-4-2021TO 31-3-2022.pdf26 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NAV PARMANU CHS LTDWT PATIL MARG VILLAGE BORLA CHEMBUR MUMBAI 40007160CompletedMar 2016Late, Jul 2016
GANGA LAXMI SADAN CHS LTDHEMU KALANI MARG CHEMBUR MUMBAI 40007136CompletedMar 2016Late, Jul 2018
SHREE SARASWATI CHS LTDN G ACHARYA MARG VILLAGE BORLA CHEMBUR CTS NO 8B MUMBAI 400071193CompletedMar 2015Late, Apr 2015

How this compares with Mumbai Suburban

92%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 35 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SARASWATI CHS LTD PLOT 8B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR,MUMBAI6,700+ in Mumbai Suburban

Builder: NAV DURGA CONSTRUCTION COMPANY

Nav Durga Construction Company has 3 registrations on MahaRERA, including SHREE SARASWATI CHSL PLOT 8 A and JAI GOPI KRISHNA CHSL. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHREE SARASWATI CHS LTD PLOT 8B is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SARASWATI CHS LTD PLOT 8B?

The registered promoter entity is NAV DURGA CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SARASWATI CHS LTD PLOT 8B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREE SARASWATI CHS LTD PLOT 8B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREE SARASWATI CHS LTD PLOT 8B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SARASWATI CHS LTD PLOT 8B?

The professionals named in the filing: Architect: B H WADHWA & CO; Architect: B.H.WADHWA & CO.; Engineer: B H WADHWA; Engineer: VIJAY NARANG; Chartered Accountant: BANWAT & CO; Chartered Accountant: BANWAT & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SARASWATI CHS LTD PLOT 8B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SARASWATI CHS LTD PLOT 8B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SARASWATI CHS LTD PLOT 8B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.