Home / Browse projects / Palghar, Maharashtra / Shree Sankatha Shmriti

Registered No litigation declared Residential / Group Housing project

Shree Sankatha Shmriti

By Shree Mahalaxmi Developers

RG-MH-71623 · RERA P99000019002 · Last updated on MahaRERA portal: 17 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 36 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 60%
35 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 181 documents Report an error

Shree Sankatha Shmriti is a Residential / Group Housing project by Shree Mahalaxmi Developers in Palghar, Maharashtra, registered with MahaRERA as P99000019002 on 28 Dec 2018. Possession is promised by 31 Mar 2027. The completion date has moved by 36 months from the original filing. 2 of the 37 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameShree Sankatha Shmriti
  • TypeResidential / Group Housing
  • Location
    • Umroli
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000019002
  • ReraGenie IDRG-MH-71623

Builder

  • NameShree Mahalaxmi Developers
  • Entity typePartnership
  • PartnersVijaynathj Sankatha Dube, Prema Vijaynath Dubey, Jayesh Vijaynath Dubey, Nagesh Vijaynath Dubey
  • Other registrations16 more →
  • Completed2 of 17
  • No longer live12 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2018First promiseMar 2024Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Dec 2018
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed181 files

Current status

5%2 of 37 units booked
59.9%Work done, per cost certificate

Figures as on 17 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree Sankatha ShmritiNA99241337

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

Shree Sankatha Shmriti: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes-
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered5
Open Space27

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,211 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Apr 2026

Approvals and building plan

Sanctioning authorityShree Mahalaxmi Developers
Permissible FSI1292.64
Proposed, not sanctioned818 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchArihant Darshan 90 Feet Road Bhayandar West
Estimated costRs 1.71 cr
Cost incurredRs 1.02 cr
Work done59.93%
BuildingWingEstimatedIncurred
Shree Sankatha ShmritiNARs 1.67 crRs 1.02 cr
-NARs 4.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Wada & Associates
EngineerParesh Unnarkar
EngineerAltaf Khadim Hussain
Chartered AccountantLunawat and Vyas
PartnerRole in project
Shree Mahalaxmi Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000019603Mar 2024 → Mar 2027

Reason as filed by the promoterDue to oc not received and still pending with some small work and oc is in process

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed181

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Scan Form 1 Q4 FY 2024-25.pdf17 Sep 2026
Withdrawal Update Form 1File: Scan Form 1 Q1 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 1File: Scan Form 1 Q2 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 1File: Scan Form 1 Q3 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 1File: Scan Form 1 Q4 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 1File: Scan Form 1 Q1 FY 2026-27.pdf17 Sep 2026
Withdrawal Update Form 2File: Scan Form 2 Q4 FY 2024-25.pdf17 Sep 2026
Withdrawal Update Form 2File: Scan Form 2 Q4 FY 2024-25.pdf17 Sep 2026
Withdrawal Update Form 2File: Scan Form 2 Q2 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 2File: Scan Form 2 Q3 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 2File: Scan Form 2 Q4 FY 2025-26.pdf17 Sep 2026
Withdrawal Update Form 2File: Scan Form 2 Q1 FY 2026-27.pdf17 Sep 2026
Withdrawal Update Form 3File: Scan Form 3.pdf17 Sep 2026
Withdrawal Update Form 3File: Scan Form 3.pdf17 Sep 2026
Withdrawal Update Form 3File: Scan Form 3.pdf17 Sep 2026
Withdrawal Update Form 3File: Scan Form 3.pdf17 Sep 2026
Withdrawal Update Form 3File: Scan Form 3.pdf17 Sep 2026
Withdrawal Update Form 3File: Scan Form 3.pdf17 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf3 Aug 2026
Withdrawal Update Form 3File: Scan Form 3.pdf3 Aug 2026
Form 2A (FY 2024-2025)File: Scan Form 2A 2024-25.pdf29 Jun 2026
Form 2A (FY 2025-2026)File: Scan Form 2A 2025-26.pdf29 Jun 2026
Form 2A (FY 2018-2019)File: Scan Form 2A.pdf2 Jun 2026
Form 2A (FY 2019-2020)File: Scan Form 2A.pdf2 Jun 2026
Form 2A (FY 2020-2021)File: Scan Form 2A.pdf2 Jun 2026
Form 2A (FY 2021-2022)File: Scan Form 2A.pdf2 Jun 2026
Form 2A (FY 2022-2023)File: Scan Form 2A.pdf2 Jun 2026
Form 2A (FY 2023-2024)File: Scan Form 2A.pdf2 Jun 2026
Form 5 (FY 2023-2024)File: Scan form 5 FY 23 24.pdf2 Jun 2026
Form 5 (FY 2024-2025)File: Scan form 5 FY 24 25.pdf2 Jun 2026
Form 5 (FY 2025-2026)File: Scan form 5 FY 25 26.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf16 May 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf16 May 2026
Withdrawal Update Form 1File: Scan Form 1.pdf16 May 2026
Withdrawal Update Form 1File: Scan Form 1.pdf16 May 2026
Withdrawal Update Form 1File: Form 1 FY 2025-26.pdf16 May 2026
Withdrawal Update Form 2File: Scan Form 2.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf16 May 2026
Withdrawal Update Form 2File: FORM 2.pdf16 May 2026
Withdrawal Update Form 2File: Scan Form 2.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 FY 2025-26.pdf16 May 2026
Withdrawal Update Form 3File: Scan Form 3.pdf16 May 2026
Withdrawal Update Form 3File: Scan Form 3.pdf16 May 2026
Withdrawal Update Form 3File: Scan Form 3.pdf16 May 2026
Withdrawal Update Form 3File: Scan Form 3.pdf16 May 2026
Withdrawal Update Form 3File: Scan Form 3.pdf16 May 2026
Form 1File: FORM 1 Q3.pdf24 Apr 2026
Form 2File: Form 2.pdf24 Apr 2026
Form 3File: Scanned Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf24 Apr 2026
Form 1File: FORM 1 Q3.pdf24 Apr 2026
Form 2File: FORM 2 Q3 24-25.pdf24 Apr 2026
Form 3File: Scanned Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Scan Sold and unsold.pdf24 Apr 2026
Form 1File: FORM 1 Q3.pdf24 Apr 2026
Form 2File: FORM 2 Q3 24-25.pdf24 Apr 2026
Form 3File: Scanned Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Scan Sold and unsold.pdf24 Apr 2026
Form 1File: FORM 1 Q4.pdf24 Apr 2026
Form 2File: FORM 2 Q4.pdf24 Apr 2026
Form 3File: Scanned Form 3.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold Inventory.pdf24 Apr 2026
Form 1File: No withdrawal letter Q1 22 23.pdf2 Apr 2026
Form 2File: No withdrawal letter Q1 22 23.pdf2 Apr 2026
Form 3File: No withdrawal letter Q1 22 23.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: No withdrawal letter Q1 22 23.pdf2 Apr 2026
Form 1File: No withdrawal letter Q2 22 23.pdf2 Apr 2026
Form 2File: No withdrawal letter Q2 22 23.pdf2 Apr 2026
Form 3File: No withdrawal letter Q2 22 23.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: No withdrawal letter Q2 22 23.pdf2 Apr 2026
Form 1File: No withdrawal letter Q3 22 23.pdf2 Apr 2026
Form 2File: No withdrawal letter Q3 22 23.pdf2 Apr 2026
Form 3File: No withdrawal letter Q3 22 23.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: No withdrawal letter Q3 22 23.pdf2 Apr 2026
Form 1File: No withdrawal letter Q4 22 23.pdf2 Apr 2026
Form 2File: No withdrawal letter Q4 22 23.pdf2 Apr 2026
Form 3File: No withdrawal letter Q4 22 23.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: No withdrawal letter Q4 22 23.pdf2 Apr 2026
Form 1File: Scan Form 1 Q3.pdf2 Apr 2026

How this compares with Palghar

5%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Sankatha Shmriti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Umroli3,200+ in Palghar

2 kmShree Sankatha ShmritiCompleted 13Lapsed / revoked 27Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: Shree Mahalaxmi Developers

SHREE MAHALAXMI DEVELOPERS has 17 registrations on MahaRERA, including PANACHE and ADITI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Shree Sankatha Shmriti is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Sankatha Shmriti?

The registered promoter entity is Shree Mahalaxmi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Sankatha Shmriti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Sankatha Shmriti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Sankatha Shmriti?

The professionals named in the filing: Architect: Ajay Wada & Associates; Engineer: Paresh Unnarkar; Engineer: Altaf Khadim Hussain; Chartered Accountant: Lunawat and Vyas. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Sankatha Shmriti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Sankatha Shmriti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Sankatha Shmriti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.