Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2019Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SHREE SANKALP is a Residential / Group Housing project by SHREE CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700002456 on 1 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2019. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHREE SANKALP
  • TypeResidential / Group Housing
  • Location
    • GHODBUNDER ROAD
    • OWALE
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002456
  • ReraGenie IDRG-MH-09220

Builder

  • NameSHREE CONSTRUCTIONS
  • Entity typePartnership
  • PartnerJITESH KISANDAS MEHTA
  • Other registrations6 more →
  • Completed5 of 7
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedJul 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion31 Jul 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SANKALPNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

SHREE SANKALP: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered1
Open Space69

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,630 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
JAYESH T SHAHBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI3925.09
Proposed, not sanctioned3,925 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 to 5 Ground Floor Kavesar Ghodbunder Road Thane west - 400615

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAKRAND TORASKAR
EngineerANAND KULKARNI
PartnerRole in project
SHREE CONSTRUCTIONS-

Litigation declared4

CaseCourtStatus
223/2016CIVIL JUDGE SENIOR DIVISION THANEPENDING WITHOUT PROHIBITORY ORDER
350/2014CIVIL JUDGE SENIOR DIVISION THANEPENDING
181/2010JUDICIAL MAGISTRATE FIRST CLASS COURT THANEWE ARE COMPLAINANT AND IS PENDING
WP/ 748/2016HIGH COURTCase Disposed on dated twenty two march two thousand nineteen

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000056273Kailas Shivram RautUmesh Raosaheb Pawar Patil28/09/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Nov 2019

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: sankalp socirty registered.pdf10 Apr 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: sankalp socirty formation.pdf10 Apr 2021
Layout approvalFile: SHREE SANKALP OC PLAN 1.pdf22 Nov 2019
Layout approvalFile: SHREE SANKALP OC PLAN 2.pdf22 Nov 2019
Layout approvalFile: SHREE SANKALP OC PLAN 3.pdf22 Nov 2019
Copy of Layout Approval (in case of layout)File: SHREE SANKALP OC PLAN 1.pdf22 Nov 2019
Copy of Layout Approval (in case of layout)File: SHREE SANKALP OC PLAN 2.pdf22 Nov 2019
Copy of Layout Approval (in case of layout)File: SHREE SANKALP OC PLAN 3.pdf22 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shree Sankalp OC.pdf22 Nov 2019
OtherFile: Shree Sankalp 748-2016 case1.pdf6 May 2019
OtherFile: Raut RERA CASE ROZNAMA.pdf3 Feb 2019
OtherFile: Civil Writ Petition 748.pdf3 Feb 2019
OtherFile: All Suits.pdf3 Feb 2019
Certificates of CA (Form 5)File: Shree Sankalp CA form 5.pdf2 Feb 2019
Certificates of Architect (Form 4)File: Shree Sankalp Form 4 Architect Cer.pdf2 Feb 2019
OtherFile: Shree Sankalp OC.pdf11 Dec 2018
OtherFile: SHREE SANKALP WORK COMPLETION ARCH CERT.pdf16 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE 1a.pdf22 Jan 2018
Certificates of CA (Form 3)File: CA CERTIFICATE 1a.pdf22 Jan 2018
OtherFile: Correction Shree Sankalp letter.pdf22 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE 1.pdf16 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE 1.pdf16 Jan 2018
Certificates of CA (Form 3)File: C A CERTIFICATE 1.pdf16 Jan 2018
OtherFile: BANK ACCOUNT LETTER.pdf16 Jan 2018
Building plan approvalFile: plan 3.pdf29 Jul 2017
Building plan approvalFile: plan 1.pdf29 Jul 2017
Building plan approvalFile: plan 2.pdf29 Jul 2017
Layout approvalFile: layout.pdf29 Jul 2017
PAN CardFile: pan.pdf29 Jul 2017
Copy of the legal title reportFile: Title.pdf29 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: layout.pdf29 Jul 2017
Building Plan Approval (IOD)File: plan 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: plan 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: plan 3.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Jul 2017
Declaration in FORM BFile: FORM B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng sankalp.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA.pdf29 Jul 2017
Proforma of Allotment letterFile: Allotment.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement.pdf29 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SANKALP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OWALE7,600+ in Thane

2 kmSHREE SANKALPCompleted 72Lapsed / revoked 23Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: SHREE CONSTRUCTIONS

SHREE CONSTRUCTIONS has 7 registrations on MahaRERA, including SHREE SANKALP and KESHAR LAXMI RESIDENCE PHASE 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE SANKALP is delayed beyond 31 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SANKALP?

The registered promoter entity is SHREE CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SANKALP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREE SANKALP?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREE SANKALP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SANKALP?

The professionals named in the filing: Architect: MAKRAND TORASKAR; Engineer: ANAND KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SANKALP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SANKALP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SANKALP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.