Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE SALASAR ROW VILLAS is a Residential / Group Housing project by RADHA KRISHNA REALTY in Palghar, Maharashtra, registered with MahaRERA as P99000080420 on 3 Jun 2025. Possession is promised by 31 Jan 2028. 3 of the 15 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.
At a glance
Project
- NameSHREE SALASAR ROW VILLAS
- TypeResidential / Group Housing
- Location
- -
- DHANSAR
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000080420
- ReraGenie IDRG-MH-32733
Builder
- NameRADHA KRISHNA REALTY
- Entity typePartnership
- GSTIN27AAYFR8167K1Z2
- PartnersRAMASHANKAR K YADAV, RAMSAKAL YADAV, SHIVDEV SHUKLA, DIPESH S MISHRA, SHYAMSUNDER PANDHARI YADAV
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jun 2025
- Promised completion31 Jan 2028
- Revised completionNone
- Buildings3 building records
- Documents filed65 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 2 | 2 | 9 | 0 | 9 |
| BUILDING NO 3 | NA | 2 | 2 | 4 | 0 | 4 |
| BUILDING NO 6 | NA | 2 | 2 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 50%.
BUILDING NO 141%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 318%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 30% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed15
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BUILDING NO 1 | 9 | 9 |
| BUILDING NO 3 | 4 | 4 |
| BUILDING NO 6 | 2 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MAYANK GREEN CITY | Dahisar Taraphe Manor | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 1 | NA | Rs 2.39 cr | Rs 1.32 cr |
| BUILDING NO 3 | NA | Rs 1.07 cr | Rs 10.69 lakh |
| BUILDING NO 6 | NA | Rs 82.48 lakh | - |
| - | NA | Rs 25.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shree Ketan Gopal Sawant |
| Engineer | Yogesh Jain |
| Chartered Accountant | J VIPUL AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| RADHA KRISHNA REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jan 2028
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 shree Salasar qtr 4.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 QTR 4 shree Salasar.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 qtr 4 shree Salasar.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 QTR 2 SALASAR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 QTR 3 SALASAR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 QTR 2 SALASAR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 QTR 3 SHREE SALASAR.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 QTR 2 SALASAR n.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 QTR 3 SALASAR.pdf | 12 Feb 2026 |
| Declaration and undertaking (Annexure A)File: Annexure A ORDER NO 50.pdf | 25 Aug 2025 |
| Other - LegalFile: RERA Queries.pdf | 8 May 2025 |
| Proforma of Agreement for saleFile: RERA Queries.pdf | 8 May 2025 |
| Other - LegalFile: RERA QUERIES.pdf | 25 Apr 2025 |
| Proforma of Agreement for saleFile: RERA QUERIES.pdf | 25 Apr 2025 |
| Other - LegalFile: Form B.pdf | 24 Apr 2025 |
| Other - LegalFile: NOC.pdf | 24 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: fORMAT B LANDOWNER.pdf | 24 Apr 2025 |
| Other - TechnicalFile: EMAIL FROM AUTHORITY.pdf | 8 Apr 2025 |
| Other - LegalFile: LEGAL QUERY.pdf | 5 Apr 2025 |
| Layout approvalFile: LAYOUT COMPRESSED.pdf | 30 Mar 2025 |
| Layout approvalFile: HIGHLIGHTED PLAN.pdf | 30 Mar 2025 |
| Building plan approvalFile: BLDG PLANS COMPRESSED.pdf | 30 Mar 2025 |
| PAN CardFile: PAN Card.pdf | 30 Mar 2025 |
| Copy of the legal title reportFile: Title Report.pdf | 30 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumberance Finance.pdf | 30 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf | 30 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: LAYOUT COMPRESSED.pdf | 30 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: HIGHLIGHTED PLAN.pdf | 30 Mar 2025 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 30 Mar 2025 |
| Declaration in FORM BFile: FORM B.pdf | 30 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHREE SALASAR SIGNED.pdf | 30 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPDATED.pdf | 30 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHREE SALASAR SIGNED.pdf | 30 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 30 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLANS COMPRESSED.pdf | 30 Mar 2025 |
| Other - LegalFile: Power of Attorney Dhansar.pdf | 30 Mar 2025 |
| Other - LegalFile: PARTNERSHIP DEED.pdf | 30 Mar 2025 |
| Other - LegalFile: conveyance deed_compressed-35-58.pdf | 30 Mar 2025 |
| Other - LegalFile: conveyance deed_compressed-59-83.pdf | 30 Mar 2025 |
| Other - LegalFile: SUMMARY OF UNDERSTANDING.pdf | 30 Mar 2025 |
| Other - LegalFile: 7 12.pdf | 30 Mar 2025 |
| Other - LegalFile: Authority Letter.pdf | 30 Mar 2025 |
| Other - LegalFile: Development Agreement Dhansar.pdf | 30 Mar 2025 |
| Other - LegalFile: conveyance deed_compressed-01-16.pdf | 30 Mar 2025 |
| Other - LegalFile: conveyance deed_compressed-17-34.pdf | 30 Mar 2025 |
| Declaration about Commencement CertificateFile: Declaration About Commencement.pdf | 30 Mar 2025 |
| CERSAI detailsFile: CERSAI.pdf | 30 Mar 2025 |
| CERSAI detailsFile: CERSAI 1.pdf | 30 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A DECLARATION ABOUT ACCOUNT RKR.pdf | 30 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf | 30 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Allotment Letter Track Changes.pdf | 30 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumberance Finance.pdf | 30 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf | 30 Mar 2025 |
| Other - FinanceFile: SUMMARY OF UNDERSTANDING.pdf | 30 Mar 2025 |
| Other - TechnicalFile: SUMMARY OF UNDERSTANDING.pdf | 30 Mar 2025 |
| Other - TechnicalFile: Encumbrance others.pdf | 30 Mar 2025 |
| Other - TechnicalFile: Annexure A ORDER NO 50.pdf | 30 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: AGREEMENT DEVIATION.pdf | 30 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Agreement Track Changes part 1.pdf | 30 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Agreement Track Changes part 2.pdf | 30 Mar 2025 |
| Proforma of Agreement for saleFile: Agreement For Sale.pdf | 30 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discl of int in other Organisations.pdf | 30 Mar 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Greivance Redersal.pdf | 30 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B new.pdf | 30 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Finance.pdf | 30 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE SALASAR ROW VILLAS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANSAR3,200+ in Palghar
Filed coordinates, straight-line distance. 51 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: RADHA KRISHNA REALTY
RADHA KRISHNA REALTY has 2 registrations on MahaRERA, including RADHA KRISHNA RESIDENCY and SHREE SALASAR ROW VILLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SHREE SALASAR ROW VILLAS is delayed beyond 31 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE SALASAR ROW VILLAS?
The registered promoter entity is RADHA KRISHNA REALTY, a partnership as per the filing. Its GSTIN 27AAYFR8167K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE SALASAR ROW VILLAS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE SALASAR ROW VILLAS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE SALASAR ROW VILLAS?
The professionals named in the filing: Architect: Shree Ketan Gopal Sawant; Engineer: Yogesh Jain; Chartered Accountant: J VIPUL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SALASAR ROW VILLAS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback