Home / Browse projects / Nashik, Maharashtra / Shree Ramkrishna Heights
Shree Ramkrishna Heights
By Mukeshbhai Shambhubhai Dalsaniya
RG-MH-40852 · RERA P51600051829 · Last updated on MahaRERA portal: 1 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Ramkrishna Heights is a Others project by Mukeshbhai Shambhubhai Dalsaniya in Nashik, Maharashtra, registered with MahaRERA as P51600051829 on 7 Jul 2023. Possession is promised by 31 Dec 2026. 41 of the 57 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameShree Ramkrishna Heights
- TypeOthers
- Location
- Kewal Park Road
- Ashtavinayak Nagar
- Chunchale
- Nashik
- 422010
- Pincode422010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600051829
- ReraGenie IDRG-MH-40852
Builder
- NameMukeshbhai Shambhubhai Dalsaniya
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Jul 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed99 files
Current status
Figures as on 1 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Ramkrishna Heights | NA | 8 | 7 | 48 | 9 | 57 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
Shree Ramkrishna Heights: 69% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed115
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Satish Gaikwad |
| Engineer | Sagar Shah |
| Chartered Accountant | Nirav Shailesh Shah and co |
| Partner | Role in project |
|---|---|
| Mukeshbhai Shambhubhai Dalsaniya | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 25-26 Q2.pdf | 1 Jun 2026 |
| Form 2File: Form 2 25-26 Q2.pdf | 1 Jun 2026 |
| Form 3File: Form 3 25-26 Q2.pdf | 1 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory 25-26 Q2.pdf | 1 Jun 2026 |
| Form 1File: Form 1 25-26 Q3.pdf | 1 Jun 2026 |
| Form 2File: Form 2 25-26 Q3.pdf | 1 Jun 2026 |
| Form 3File: Form 3 SD 25-26 Q3.pdf | 1 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory 25-26 Q3.pdf | 1 Jun 2026 |
| Form 1File: Form 1 25-26 Q4.pdf | 1 Jun 2026 |
| Form 2File: Form 2 25-26 Q4.pdf | 1 Jun 2026 |
| Form 3File: Form 3 SD 25-26 Q4.pdf | 1 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory 25-26 Q4.pdf | 1 Jun 2026 |
| Form 1File: Form 1.pdf | 22 Sep 2025 |
| Form 2File: Form 2.pdf | 22 Sep 2025 |
| Form 3File: Form 3 - Self Declaration.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: No Booking.pdf | 22 Sep 2025 |
| Form 1File: Form 1 Q3.pdf | 22 Sep 2025 |
| Form 2File: Form 2 Q3.pdf | 22 Sep 2025 |
| Form 3File: Form 3 SD Q3.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Q3.pdf | 22 Sep 2025 |
| Form 1File: Form 1.pdf | 22 Sep 2025 |
| Form 2File: Form 2.pdf | 22 Sep 2025 |
| Form 3File: Form 3 SD Q4.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q4.pdf | 22 Sep 2025 |
| Form 1File: Form 1 Q1.pdf | 22 Sep 2025 |
| Form 2File: Form 2 Q1.pdf | 22 Sep 2025 |
| Form 3File: Form 3 SD Q1.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q1.pdf | 22 Sep 2025 |
| Form 1File: Form 1 Q2.pdf | 22 Sep 2025 |
| Form 2File: Form 2 Q2.pdf | 22 Sep 2025 |
| Form 3File: Form 3 SD Q2.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Q2.pdf | 22 Sep 2025 |
| Form 1File: Form 1 24-25 Q3.pdf | 22 Sep 2025 |
| Form 2File: Form 2 24-25 Q3.pdf | 22 Sep 2025 |
| Form 3File: Form 3 SD 24-25 Q3.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 24-25 Q3.pdf | 22 Sep 2025 |
| Form 1File: Form 1 24-25 Q4.pdf | 22 Sep 2025 |
| Form 2File: Form 2 24-25 Q4.pdf | 22 Sep 2025 |
| Form 3File: Form 3 24-25 Q4.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 11-03-2025.pdf | 22 Sep 2025 |
| Form 1File: Form 1 25-26 Q1.pdf | 22 Sep 2025 |
| Form 2File: Form 2 25-26 Q1.pdf | 22 Sep 2025 |
| Form 3File: Form 3 SD 25-26 Q1.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 25-26 Q1.pdf | 22 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q4.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 24-25 Q4.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q4.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory 11-03-2025.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q3.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q3.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q3.pdf | 25 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory 24-25 Q3.pdf | 25 Jan 2025 |
| Building plan approvalFile: Revised Plan.pdf | 31 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf | 31 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q2.pdf | 31 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Q2.pdf | 31 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Q1.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q1.pdf | 20 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024.pdf | 22 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Q4.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q4.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf | 2 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Q3.pdf | 2 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q3.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: No Booking.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Self Declaration.pdf | 22 Nov 2023 |
| Layout approvalFile: Plot Layout.pdf | 16 Jun 2023 |
| Building plan approvalFile: Sanctioned Plan.pdf | 16 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: Plot Layout.pdf | 16 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf | 16 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Ramkrishna Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ashtavinayak Nagar, Chunchale4,100+ in Nashik
Filed coordinates, straight-line distance. 94 registered projects within 2 km.
SHREE SATYANARAYAN ROONGTA FORUM
ROONGTA HOMES LLP
LIFE 360
VELOCITY INFRA PROJECTS
ARYAN'S LIFEONE
SHREE ARYAN BUILDERS AND DEVELOPERS
SUNFLOWER CITY
DEEPAK KALYANJI CHANDE
Laxminarayan Heaven
Sahajanand Builders And Developers
SWASTIK MANGAL APARTMENT
SHREEMANGAL CONSTRUCTION
See every Nashik project, with the district possession charts
Builder: Mukeshbhai Shambhubhai Dalsaniya
Mukeshbhai Shambhubhai Dalsaniya has 1 registration on MahaRERA, including Shree Ramkrishna Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Shree Ramkrishna Heights is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Ramkrishna Heights?
The registered promoter entity is Mukeshbhai Shambhubhai Dalsaniya, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Ramkrishna Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Ramkrishna Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Ramkrishna Heights?
The professionals named in the filing: Architect: Satish Gaikwad; Engineer: Sagar Shah; Chartered Accountant: Nirav Shailesh Shah and co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Ramkrishna Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback